| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
Drawing numbers
Site Location Plan TR Drawing no. 1 at 1:500
Proposed Site Plans TR Drawing no. 2 at 1:500
Elevations and floorplans TR Drawing nos. 3-8 at 1:100
(received 06/05/26).
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing (elevations TR Drawing nos. 3-8 at 1:100). The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design.
Yorkshire Water
04
No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority.
Reason
To ensure that the site is properly drained and in order to prevent overloading, surface water is not discharged to the public sewer network.
Informative
Yorkshire Water
01
As surface water from the site is not proposed to discharge to the public sewer network, no assessment of the capacity of the public sewers to receive surface water has been undertaken. Should the surface water disposal proposals change, further consultation with Yorkshire Water will be required.
Positive and Proactive Statement
Whilst the applicant did not enter into any formal pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modifications.
|