Rotherham Metropolitan Borough Council Council Online Planning - Draft Decision

Planning Application Number: RB2025/1594
Site Address: Woodside Bungalow Second Lane Wickersley Rotherham 9999
Description: Demolition of existing Bungalow and the erection of replacement two storey self build dwelling with basement, boundary treatment and associtated hardstanding
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 24 July 2026
Decision Date: 24 July 2026
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved and/or carried out before development can start. Conditions numbered 03,05 and 10 of this permission require matters to be approved and/or carried out before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 03,05,and 10 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured, or matters carried out.’ 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans AMENDED Proposed Plans, 2509-002-REV F, received 11/12/2026 AMENDED Proposed Elevations, 2509 - 003 - REV C, received 11/12/2026 AMENDED Proposed Location Plans, received 06/02/2026 AMENDED Design and Access Statement, received 09/12/2026 Proposed Boundary Treatment, received 06/02/2026 Reason To define the permission and for the avoidance of doubt. 03 No above ground development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples. Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity. 04 Notwithstanding the provisions of Schedule 2, Part 1, Classes A, AA, B, C, D, E of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking, re-enacting or amending that Order with or without modification) there shall be no extensions to the dwelling hereby permitted. Reason To prevent future extensions harming the amenity of neighbouring residents. 05 Before the development is brought into use, a Landscape scheme along with final boundary treatment, showing location and types of landscape and boundary treatment, shall be submitted for approval by the Local Planning Authority. The Landscape scheme should be prepared in accordance with RMBC Landscape Design Guide (April 2014) and shall be implemented in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season. Reason To ensure the tree works are carried out in a manner which will maintain the health and appearance of the trees in the interests of the visual amenities of the area and in accordance with the Local Plan. 06 Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that the dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity. 07 Details of an electric vehicle charging point shall be submitted to and approved in writing by the local planning authority. The approved electric vehicle charging point shall be implemented and made available for use prior to the occupation of the development hereby permitted. The arrangements shall be retained as such thereafter. Reason To promote sustainable transport options Biodiveristy 08 The development shall be completed in line with the Bat Survey Report and the conditions of the planning permission. All the recommendations shall be implemented in full according to the timescales laid out, unless otherwise agreed in writing by the Local Planning Authority, and thereafter permanently maintained for the stated purposes of biodiversity conservation. Reason To secure high-quality, long-term biodiversity enhancements—including nesting, roosting and movement opportunities for priority species—in accordance with Policies CS20 and SP33 of the Rotherham Local Plan and the National Planning Policy Framework. 09 The development shall be carried out in accordance with the following additional biodiversity mitigation and enhancement measures. The measures listed below shall be implemented in full, prior to first occupation of the site, and full details including photographic evidence provided to the Local Planning Authority, unless otherwise agreed in writing by the Local Planning Authority; the features shall thereafter be permanently retained. • At least 3 no. integrated bat roosting boxes and two integrated swift boxes to be installed in suitable locations within the new dwelling; and • Hedgehog highways to be installed in boundary fencing. The hedgehog highways will be signposted to prevent residents blocking the gaps. All features shall be retained and maintained for the lifetime of the development. Reason To secure high-quality, long-term biodiversity enhancements—including nesting, roosting and movement opportunities for priority species—in accordance with Policies CS20 and SP33 of the Rotherham Local Plan and the National Planning Policy Framework. Drainage 10 The development hereby permitted should not commence until drainage plans for the disposal of foul and surface water flows have been submitted to and approved by the Local Planning Authority, and the scheme shall be implemented in accordance with the approved details before the development is first brought into use. Planning Practice Guidance and section H of the Building Regulations 2010 detail surface water disposal hierarchy. The disposal of surface water by means of soakaways should be considered as the primary method. If this is not practical and there is no watercourse available as an alternative, other sustainable methods should also be explored. If these are found unsuitable satisfactory evidence will need to be submitted before a discharge to the public sewerage system is considered. No surface water to enter the foul or combined water systems by any means. Reason To ensure that the development is provided with a satisfactory means of drainage as well as reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution.. 11 The development hereby granted shall not be occupied until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan Contaminated land 12 If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment. Reason To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 187, 196 and 197 of the National Planning Policy Framework, December 2024. 13 If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment. Reason To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 187, 196 and 197 of the National Planning Policy Framework, December 2024. Informative(s) 01 Biodiveristy The works should be undertaken outside of the bird nesting season (March-August inclusive). Should this not be possible then a suitably qualified ecologist should undertake a nesting bird check no more than 48 hours prior to the start of works. Should active nests be found, works should cease until the nests are no longer active and the chicks have fledged and the ecologist has deemed the area to be free of nesting birds. If a bat or evidence of the presence of bats is discovered on site prior to or during development all work should stop immediately. A licensed bat consultant or Natural England must be contacted and works implemented only in accordance with methods advised by them. This advice note should be provided to any persons/contractors carrying out the development along with the contact details of a relevant ecological consultant. This action is necessary to avoid possible prosecution and ensure compliance with the Wildlife & Countryside Act 1981 (as amended), The Conservation of Habitats and Species Regulations 2017. 02 Drainage Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84 Developments should have floor levels set higher than the recorded flood level or a minimum of 300mm above proposed ground level due to surface water flooding. Surface water drainage plans should include the following: ? Rainwater pipes, gullies and drainage channels including cover levels. ? Inspection chambers, manholes and silt traps including cover and invert levels. ? Pipe sizes, pipe materials, gradients and flow directions. ? Soakaways, including size and material. ? Typical inspection chamber / soakaway / silt trap and SW attenuation details. ? Site ground levels and finished floor levels. Surface Water Discharge From Brownfield Site: There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased. A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off rate. On Site Surface Water Management: The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land. The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated. Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway. Guidance on flood pathways can be found in BS EN 752. If the development is proposing to make a new highway drainage connection to an existing highway drainage system, detailed CCTV surveys and modelling of the existing highway drainage system will be required to determine the capability to accept additional flow. Discharge will be limited to greenfield run-off rates. Before undertaking any work on site, all applicants must determine if Severn Trent has any assets in the vicinity of the proposed works. This can be done by accessing our records at www.digdat.co.uk Severn Trent Water advise that even if our statutory records do not show any public sewers within the area you have specified, there may be sewers that have been recently adopted under The Transfer of Sewer Regulations 2011. Public sewers and Water mains have statutory protection and may not be built close to, or diverted without consent, consequently you must contact Severn Trent to discuss your proposals. Severn Trent will seek to assist you obtaining a solution which protects both the public sewer and the proposed building. If the development site includes a Vehicle Wash / Petrol Station / Swimming Pool / Industrial Processes, or anything else that may discharge waste other than foul sewage or surface water into the public network, we would strongly recommend the applicant speaks to the Trade Effluent Support Team before requesting a discharge of any drainage related condition. The team can be contacted by email: trade.effluent@severntrent.co.uk Please note for the use or reuse of sewer connections either direct or indirect to the public sewerage system the applicant will be required to make a formal application to the Company under Section 106 of the Water Industry Act 1991. They may obtain copies of our current guidance notes and application form from either our website (www.stwater.co.uk) or by contacting our Developer Services Team (Tel: 0800 707 6600). With regard to condition 10, please note that in regard to network capacity, this only relates to the public waste water network and does not include representation from other areas of Severn Trent Water, such as the provision of water supply or the protection of drinking water quality. 03 Environmental Health You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway. It is recommended that the following advice is followed to prevent a nuisance/ loss of amenity to local residential areas. Please note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in an unlimited fine upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to the below recommendations and to the steps that may be required to prevent a noise nuisance from being created. (i) Except in case of emergency, operations should not take place on site other than between the hours of 08:00 - 18:00 Monday to Friday and between 09:00 - 13:00 on Saturdays. There should be no working on Sundays or Public Holidays. (ii) Heavy goods vehicles should only enter or leave the site between the hours of 08:00 - 18:00 on weekdays and 09:00 - 13:00 Saturdays and no such movements should take place on or off the site on Sundays or Public Holidays (this excludes the movement of private vehicles for personal transport). (iii) Best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Local Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. (iv) Effective steps should be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. POSITIVE AND PROACTIVE STATEMENT The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.