| Conditions / Reason for Refusal: |
The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 08 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because:
i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination.
ii. The details required under condition number 08 is fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
(Drawing numbers CS-DP-154-001 Rev1 (received 02/12/2025)
(Drawing numbers CS-DP-154-006 Rev2/ 007 Rev 2/ 009 Rev2) (received 04/03/2025).
Reason To define the permission and for the avoidance of doubt.
03
No development above ground level shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The walls shall be constructed of natural coursed stone with the roof being covered in natural slate, unless otherwise agreed in writing with the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policies CS28 and Local Plan Policy SP41.
04
Details of the windows and doors including their colour treatment shall be submitted to and approved in writing with the Local Planning Authority. The windows shall be painted aluminium, unless otherwise agreed in writing with the Local Planning Authority. The development shall proceed in accordance with the approved details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policies CS28 and Local Plan Policy SP41.
05
The rainwater goods shall be constructed of cast iron or cast aluminium, painted black with the gutters hung on rise and fall gutter brackets, unless otherwise agreed in writing with the Local Planning Authority.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policies CS28 and Local Plan Policy SP41.
06
If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment.
Reasons
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 187, 196 and 197 of the National Planning Policy Framework, December 2024.
07
If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment.
Reasons
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 187, 196 and 197 of the National Planning Policy Framework, December 2024.
08
Prior to the commencement of development, a tree protection plan, to minimum scale of 1:200 in accordance with BS5837, detailing all methods of protection, including but not restricted to: locations of construction exclusion zones, root protection areas, fit for purpose fencing and ground protection, service routes, works access space, material/machinery/waste storage and permanent & temporary hard surfaces shall be produced and agreed with the Local Planning Authority.
Reason In the interests of visual amenity in accordance with Policy SP33 ‘Conserving and Enhancing the Natural Environment.’
09
A suitable scheme of proposed tree planting, including tree size and species as well as specification of planting pits and five years post planting maintenance shall be submitted to and approved by the Local Planning Authority prior to the first use of the development hereby approved. The planting shall be undertaken in accordance with the approved details and timescales agreed with the Local Planning Authority.
Reason
In the interests of visual amenity in accordance with Policy SP33 ‘Conserving and Enhancing the Natural Environment.’
10
The dwelling hereby approved shall not be occupied until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before the dwellings are occupied. Reason In the interests of neighbouring amenity and the visual amenity of the area.
11
Prior to the occupation of the dwellings, details of a vehicle charging point shall be submitted to and approved by the local planning authority. The development shall not be occupied until the charging point has been provided, and it shall thereafter be retained.
Reason
In the interests of sustainable development and air quality.
12
The vehicular access drive shall not exceed a gradient of 5 % for a distance of 5 metres measured from the highway boundary and 10 % thereafter.
Reason
To ensure that the approved dwelling can be safely accessed.
13
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that the dwelling hereby approved can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
14
The development hereby granted shall not be occupied until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
Reason
To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan.
Informative
01. Drainage Informative:
1. Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84.
2. Developments should have floor levels set higher than the recorded flood level or a minimum of 300mm above proposed ground level due to surface water flooding.
3. Surface water drainage plans should include the following:
? Rainwater pipes, gullies and drainage channels including cover levels.
? Inspection chambers, manholes and silt traps including cover and invert levels.
? Pipe sizes, pipe materials, gradients and flow directions.
? Soakaways, including size and material.
? Typical inspection chamber / soakaway / silt trap and SW attenuation details.
? Site ground levels and finished floor levels.
4. Surface Water Discharge From Brownfield Site:
There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased.
A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off rate.
5. On Site Surface Water Management:
The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land.
The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated.
Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway.
Guidance on flood pathways can be found in BS EN 752.
6. The applicant may require written consent from the Environment Agency, for any proposed discharge to “controlled waters” (main river/watercourse)
7. If the development is proposing to make a new highway drainage connection to an existing highway drainage system, detailed CCTV surveys and modelling of the existing highway drainage system will be required to determine the capability to accept additional flow. Discharge will be limited to greenfield run-off rates.
0.2 Control of working practices during construction phase (Close to residential)
You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway.
POSITIVE AND PROACTIVE STATEMENT
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|