Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2025/1455
Site Address: Unit 5 Bridge Court Greasbrough Road Rotherham 0005
Description: Change of use of part of garage to M.O.T area (Use Class B2 )
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 29 January 2026
Decision Date: 29 January 2026
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans: Existing and Proposed Fence Elevations, received 13/01/2026 Proposed Site Plan, received 06/11/2025 Proposed Vehicle Routes, received 08/01/2026 Reason To define the permission and for the avoidance of doubt. 03 Before the development is brought into use the car parking area shown on the submitted plan (Proposed Vehicle Routes, received 08/01/2026) shall be provided, marked out and thereafter maintained for car parking. Reason In the interests of road safety. 04 The MOT shall only operate from 08:00hrs until 18:00hrs Mondays to Saturdays. No operations shall take place on Sundays. Reason To safeguard the amenities of the occupiers of nearby properties in accordance with RMBC Policy SP52 and part 15 of the NPPF. 05 The garage forecourt area not identified for parking, shall remain free from materials / obstructions, in order to ensure that a turning area for vehicles within the site, is provided. Reason In the interests of road safety. 06 The development hereby granted shall not be begin until details of the surface water and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development. Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan. Informative 1. Records indicate site to be in Environment Agency Flood Warning Area Zone 3 2. Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84. 3. Developments should have floor levels set higher than the recorded flood level or a minimum of 300mm above proposed ground level. 4 The applicant should provide a Flood Evacuation Plan which outlines: • The flood warning procedure. • A safe point of extraction. • How users can safely evacuate the site upon receipt of a flood warning. • The areas of responsibility for those participating in the plan. • The procedures for implementing the Plan. • How users will be made aware of the flood risk. • How users will be made aware of flood resilience. • Who will update the flood evacuation plan? • Measures to contain or prevent pollution to nearby rivers/watercourses in the event of a catastrophic fire. Further advice can be obtained with regards to how to prepare a flood plan and what the EA flood warnings mean at https://flood-warning-information.service.gov.uk/warnings 5 Surface Water Discharge From Brownfield Site: There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased. A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off rate. 6 On Site Surface Water Management: The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land. The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated. Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway. Guidance on flood pathways can be found in BS EN 752. 7 A Flood Risk Assessment (FRA) should be provided for the proposed development site, in accordance with the NPPF. Where the site is at risk of flooding (Fluvial and Pluvial), details of place of refuge/evacuation should be considered and sign up to the Environment Agency Flood Warning Service. 8 No part of the proposed development shall be constructed within 5-8m of an ordinary watercourse and a minimum 3 m for a culverted watercourse (increases with size of culvert) 9 The applicant may require written consent from the Environment Agency, for any proposed discharge to “controlled waters” (main river/watercourse) 10 If the development is proposing to make a new highway drainage connection to an existing highway drainage system, detailed CCTV surveys and modelling of the existing highway drainage system will be required to determine the capability to accept additional flow. Discharge will be limited to greenfield run-off rates. 11 Whereby a private maintenance arrangement is proposed and the development is unlikely to remain under single ownership or within a single curtilage over its lifetime a condition will require a satisfactory legal agreement to be drawn up to provide for inspection and maintenance of the proposed surface water drainage scheme. This legal agreement is required BEFORE the first occupation of any dwelling or building on the site. Over the lifetime of the development an agreement must include the following: a) A detailed operational maintenance plan; b) Physical access arrangements for maintenance, and establishment of legal rights of access in perpetuity, prior to the commencement of any phase of the development; c) A financial revenue plan clearly setting out how funding for maintenance is to be raised over the lifetime of the development; d) A whole life cost analysis for capital maintenance over the lifetime of the development. Any values should be based on the current HM Treasury Present Value (PV) Discount Rate. Assumptions about the expected useful life of materials should be included in any such analysis; and e) Details of financial surety to ensure long-term maintenance and capital maintenance costs of apparatus. It is for the developer to demonstrate that a suitable financial underwriting arrangement is in place. Positive and Proactive Statement During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen