| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby permitted shall relate to the area shown outlined in red on the approved Location Plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below)
Drawing numbers:
• Location Plan (no drawing number)
• Site Plans (drawing number 103)
• General Arrangement As Existing (drawing number 100 REV A, amended plan received on 16.10.2025)
• General Arrangement As Proposed (drawing number 101 REV B, amended plan received on 06.11.2025)
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
Positive and Proactive Statement
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
|