| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans –
• Location Plan 14668-2 THPW XX XX DR A 100 Rev P02
• Site Plan 14668-2 THPW XX XX DR A 111 Rev P03
• Proposed GA Plan 14668-2 THPW XX XX DR A 112 Rev P01
• Proposed Elevations 14668 THPW XX XX DR A 113 Rev P03
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on the approved plan. The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
TRANSPORTATION
04
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either
a/ a permeable surface and associated water retention/collection drainage, or
b/ an impermeable surface with water collected and taken to a separately
constructed water retention / discharge system within the site. All to the
satisfaction of the Local Planning Authority and shall thereafter be maintained
in a working condition.
Reason
In the interest of Highway Safety
05
Before the development is brought into use the car parking area shown on the approved plan shall be provided, marked out and thereafter maintained for car parking.
Reason
In the interest of Highway Safety
ENVIRONMENTAL
06
No new noise generating fixed plant including mechanical ventilation, air conditioning/ refrigeration compressor units or extraction plant shall be installed in any part of the development until full and precise details have been submitted to and approved in writing by the Local Planning Authority. The details shall include a BS4142:2014+A1:2019 noise assessment and 1/3 octave frequency analysis with appropriate corrections for acoustic features and shall detail any mitigation measures, physical or operational to achieve a maximum cumulative plant Noise Rating Level of no more than 0dB(A) above the prevailing background levels, outside the boundary of the nearest noise sensitive premises.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with
RMBC Policy SP52 and parts 12 & 15 of the NPPF
07
No part of the land other than that occupied by buildings shall be used for the permanent storage of goods, components, parts, waste materials or equipment without the prior written approval of the Local Planning Authority.
Reason
To prevent the land from becoming unsightly in the interests of visual amenity and in
accordance with Policy CS28 Sustainable Design.
CONSTRUCTION PHASE
08
Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance
with RMBC Policy SP52 and Part 15 of the NPPF.
09
All machinery and vehicles employed on the site shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in British Standard 5228 Code of Practice; 'Noise Control on Construction and Open Sites', and Minerals Planning Guidance Note 11 (1993) 'The Control of Noise at Surface Mineral Workings'.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance
with RMBC Policy SP52 and Part 15 of the NPPF.
10
At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance
with RMBC Policy SP52 and Part 15 of the NPPF.
11
Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance
with RMBC Policy SP52 and Part 15 of the NPPF.
Informatives
01
This development is not subject to the statutory Biodiversity Gain Plan condition because of the declaration on the application form that the development was exempt
(because the impact on habitat is de-minimis)
02
Competent Person – Footnote for condition 06
All noise assessments should be carried out by a competent person. Developers may wish to contact the Association of Noise Consultants http://www.association-of-noise-consultants.co.uk/ (020 8253 4518) or the Institute of Acoustics http://www.ioa.org.uk (0300 999 9675) for a list of members.
03
The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to the Mining Remediation Authority on 0345 762 6846 or if a hazard is encountered on site call the emergency line 0800 288 4242. Further information is also available on the Mining Remediation Authority website at: Mining Remediation Authority - GOV.UK
Positive and Proactive Statement
Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.
|