| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
• Proposed Site Plan PL002 Rev C
• Visibility Splay PL006
• Proposed Plans and Elevations PL001 Rev A
• Proposed Levels and Streetscene PL005
• Proposed Levels PL004
Reason
To define the permission and for the avoidance of doubt.
03
The above ground construction of the dwelling shall not take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and the details have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
04
Prior to the commencement of any above ground development details of the design and location of boundary treatment to be provided on site shall be submitted to and approved by the Local Planning Authority. The boundary treatment shall be provided on site prior to the occupation of each dwelling.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
05
Prior to the occupation of each dwelling, the bin store shall be provided for use on site.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
TRANSPORTATION
06
No above ground development shall take place until a scheme for the improvement of Southwell Road from its junction with Osbert Street to the southernmost point of the proposed development has been submitted to and approved in writing by the Local Planning Authority, and the approved scheme shall be completed on site prior to the first occupation of any dwelling.
Reason
In the interest of Highway Safety
07
No above ground development shall take place until details of a bollard in the location shown on the approved plan in Southwell Road has been submitted and approved. No dwelling shall be occupied until the approved bollard has been provided on site and it shall thereafter be retained for the lifetime of the development.
Reason
In the interest of Highway Safety
08
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
09
Prior to the commencement of any above ground development hereby approved, a scheme shall be submitted to and approved in writing by the Local Planning Authority detailing how the use of sustainable/public transport will be encouraged. This may take the form of a leaflet setting out where local cycle routes are available, bus timetables, location of local doctors, schools, supermarkets etc. The agreed details shall be implemented in accordance with a timescale to be agreed by the Local Planning Authority
Reason
To promote sustainable transport modes at the site
10
Prior to the occupation of the dwellings, details of one vehicle charging point per dwelling shall be submitted to and approved by the local planning authority. The dwellings shall not be occupied until the charging point has been provided and shall thereafter be retained.
Reason
In the interests of sustainable development and air quality
DRAINAGE
11
The development shall be carried out in accordance with the details shown on the
submitted plan, "'Drainage Statement' prepared by CMLC, dated 11 June 2025", unless otherwise agreed in writing with the Local Planning Authority.
Reason
In the interest of satisfactory and sustainable drainage
LANDSCAPE, TREES & ECOLOGY
12
Before the development is brought into use, a Landscape scheme, showing location and types of landscape treatment, shall be submitted for approval by the Local Planning Authority. The Landscape scheme should be prepared in accordance with RMBC Landscape Design Guide (April 2014) and shall be implemented in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season.
Reason
To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity and in accordance with Local Plan Policy.
13
The development shall be carried out in full accordance with the submitted Arboricultural Method Statement and Tree Protection Plan by Wharncliffe Trees and Woodland Consultancy (dated March 2025). The protective fencing shall be installed prior to the commencement of any development or groundworks and retained throughout the duration of the construction period.
Evidence shall be submitted to the Local Planning Authority to demonstrate that the development is being carried out in accordance with the approved arboricultural method statement and tree protection plan. This should include a written record of the project arboriculturist’s site visits and a set of photographs showing the tree protection fencing in place during key stages of the development.
Reason
To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change in accordance with Rotherham’s Core Strategy Policies CS3: Location of New Development, CS19: Green Infrastructure, CS20 Biodiversity and Geodiversity, Policy CS21 Landscape, Policy CS28 Sustainable Design.
14
No removal of hedgerows, trees or shrubs shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the Local Planning Authority.
Reason
In the interest of biodiversity of the site
15
Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be
undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure
iii. A drawing(s) showing the location and where appropriate the elevation of the
features or measures to be installed or undertaken.
Iv. When the features or measures will be installed within the construction,
occupation, or phase of the development.
Reason
In the interest of enhancing biodiversity at the site.
LAND CONTAMINATION
16
Prior to above ground works commencing, a Phase II Intrusive Site Investigation shall be undertaken to assess the geotechnical and geo-environmental constraints at the site. A detailed scope of works including the methodology for investigation shall be submitted to and approved in writing by the Local Authority prior to any site investigation works commencing.
The site investigation shall thereafter be undertaken in accordance with the approved details. The investigation and subsequent risk assessment must be undertaken by competent persons and a written report of the findings must be produced and will be subject to approval in writing by this Local Planning Authority.
The above should be conducted in accordance with the new guidance document ‘Land
Contamination Risk Management’ (October 2020) and predecessor guidance ‘Model
Procedures for the Management of Land Contamination, CLR 11 (Environment Agency, 2004) and BS10175:2011+A2 2017 (BSI, 2017)
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 189 and 190 of the National Planning Policy Framework
17
Subject to the findings of condition 16 above and prior to above ground works commencing, a Remediation Method Statement shall be provided for the approval of this Local Planning Authority prior to any remediation/ground improvement works commencing on site. The works shall be of such a nature as to render harmless any possible identified contamination given the proposed end- use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. The approved Remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The Local Authority must be given two weeks written notification of commencement of the remediation scheme works.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 189 and 190 of the National Planning Policy Framework
18
If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Planning Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 189 and 190 of the National Planning Policy Framework
19
If during development works unexpected significant contamination is encountered, the Local Planning Authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 189 and 190 of the National Planning Policy Framework
20
Following completion of any required remedial/ground preparation works a Verification Report should be forwarded to the Local Planning Authority for review and comment. The Verification Report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the Verification Report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the Local Planning Authority.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 189 and 190 of the National Planning Policy Framework
Informative(s):
01
Biodiversity Net Gain
Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days).
Biodiversity Gain Plan
The biodiversity gain plan must include/accompanied by:
(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat;
(b) the pre-development biodiversity value of the onsite habitat;
© the post-development biodiversity value of the onsite habitat;
(d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development;
(e) any biodiversity credits purchased for the development;
(f) any information relating to irreplaceable habitat making up onsite habitat
(g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline.
(h) any additional information requirements stipulated by the secretary of state.
The effect of section 73D of the Town and Country Planning Act 1990
If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted.
Those circumstances are that the conditions subject to which the section 73 permission is granted:
1. do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and
2. in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
- Listed exemptions from Statutory BNG and transitional arrangements can be found at Biodiversity net gain: exempt developments - GOV.UK (www.gov.uk)
- The Statutory Biodiversity Gain Plan template can be found at https://www.gov.uk/government/publications/biodiversity-gain-plan
- Minimum legal requirements for the Biodiversity Gain plan can be found at https://www.legislation.gov.uk/ukpga/2021/30/schedule/14#:~:text=paragraph%2015).-,Biodiversity%20gain%20plan,-14
- Irreplaceable habitats for the purposed of Biodiversity Net Gain are defined by Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024. A full list of irreplaceable habitats can be found at https://www.legislation.gov.uk/uksi/2024/48/schedule/made
- Additional information required is outlined by Articles 37C(2) [Non Phased] 37C(4) [Phased] of The Town and Country Planning (Development Management Procedure) (England) Order 2015 and may be subject to the nature of your application https://www.legislation.gov.uk/uksi/2015/595#:~:text=Additional%20content%20of%20plan
- Where a Habitat Management and Monitoring Plan is required: https://publications.naturalengland.org.uk/publication/5813530037846016
02 – Ecological Enhancements
The site will require some biodiversity enhancements on-site in the form of bat roosting
features, bird nesting boxes and hedgehog holes. This is in line with the National Planning Policy Framework Paragraph 180 (d) stating that opportunities to improve biodiversity in and around development should be integrated as part of their design.
This should include the below (where appropriate for the development):
• 1 bird brick integrated into the building on a northerly aspect/orientation
(north, north-east and north-west). Example specification includes the Schwegler Brick Box Type 24, Woodstone Sparrow Nest Box or an equivalent suitable for tits, sparrows or starlings. The boxes should be located between two to four metres high, ideally at the gable apex or at eaves. The brick can be installed flush with the outside wall and can be rendered or covered so that only the entrance hole is visible.
• 3 swift bricks integrated into the building on any elevation but ideally undershadecasting eaves. They should be installed in groups of three, at a height above 5m and preferably with a 5m clearance between the host building and other buildings or obstructions. Swift bricks should be used unless these are not practical due to the nature of construction, in which case alternative designs of suitable swift boxes should be provided in their place. Example specification includes the Manthrope ‘GSWB’ Swift brick or the Vivara Pro Cambridge Brick Faced Swift Nest Box.
• 1 bat bricks should be integrated into buildings on a southerly aspect / orientation (south, south west, and south-east). Boxes should be located a minimum of 2 metres, but ideally 5-7 metres above ground, in a position near the eaves or gable apex. Placement should avoid windows, doors and wall climbing plants. Example specification includes Verona Build-In Woodstone Bat Box, Segovia Build-in WoodStone Bat Box and WoodStone Build-in Bat Tube
• Hedgehog holes between any fencing, railings, wall and gates to ensure the development is permeable to hedgehogs. These can be created by 13cmX13cm holes at ground level within fences or by leaving a sufficient gap beneath gates and/or leaving brick spaces at the base of brick walls. To ensure holes are kept open ‘Hedgehog Highway’ signage should be provided and secured above the holes
03 – Construction Phase
Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided.
All machinery and vehicles employed on the site shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in BS5228:2009 'Noise Control on Construction and Open Sites', and Minerals Planning Guidance Note 11 (1993) 'The Control of Noise at Surface Mineral Workings'.
At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Local Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was further amended during the application process. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|