Planning Application Number: RB2025/0317
Site Address: land rear of 69 Main Street North Anston 0069
Description: Demolition of detached garage and section of boundary wall to form new access and erection of detached dwelling and detached garage
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 08 May 2025
Decision Date: 08 May 2025
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: General 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) Location Plan, received 06 March 2025 5/19/03, received 06 March 2025 5/19/04, received 06 March 2025 5/19/05, received 06 March 2025 5/19/08, received 06 March 2025 5/19/09, received 06 March 2025 5/19/10 received 17 March 2025 Reason To define the permission and for the avoidance of doubt. 03 No development above ground level shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples. Reason In order to ensure a satisfactory appearance in the interests of visual amenity. 04 Prior to the occupation of the dwelling hereby approved, details of the windows, including their materials and colour treatment shall be submitted to and approved in writing with the Local Planning Authority. The development shall proceed in accordance with the approved details. Reason To protect the character and appearance of the North Anston Conservation Area in accordance with Local Plan Policy, SP41 ‘Conservation Areas.’ 05 Prior to the occupation of the dwelling hereby approved a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before the development is brought into use. Reason In the interests of the visual amenity of the area. Highways 06 When the proposed access has been brought into use, the existing access to 69 Main Street shall be permanently closed and the wall reinstated in accordance with details shown on the approved plans. Reason In the interests of road safety. 07 A vehicular turning space for a car shall be provided within the site curtilage in accordance with the approved plans and the development shall not be brought into use until such turning space has been provided. Reason To enable a vehicle to enter and leave the highway in a forward gear in the interests of road safety. 08 Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either; a/ a permeable surface and associated water retention/collection drainage, or; b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity. 09 Before the construction of the new access commences, road sections, constructional and drainage details including a new kerbline and surfacing works fronting the site shall be submitted to and approved by the Local Planning Authority, and the approved details shall be implemented before the development is completed. Reason No details having been submitted they are reserved for approval. 10 Prior to the occupation of the dwelling hereby approved, details of a vehicle charging point shall have been submitted to and approved by the Local Planning Authority. The development shall not be occupied until the approved charging point has been provided, and it shall thereafter be retained. Reason In the interests of sustainable development and air quality. Trees / Landscapes 11 No operations (including initial site clearance) shall commence on site in connection with development hereby approved until a suitable scheme (Arboricultural Method Statement) for the protection of existing trees and hedgerows has been submitted and its installation on site has been approved in writing by the Local Planning Authority. All protection measures must fully detail each phase of the development process taking into account demolition/site clearance works, all construction works and hard and soft landscaping works. Details shall include the following: Full survey of all trees on site and those within influencing distance on adjacent sites in accordance with BS5837*, with tree works proposals. All trees must be plotted on a site plan**, clearly and accurately depicting trunk locations, root protection areas and canopy spreads. A plan** detailing all trees and hedgerows planned for retention and removal. A schedule of tree works for all the retained trees specifying pruning and other remedial or preventative work, whether for physiological, hazard abatement, aesthetic or operational reasons. All tree works shall be carried out in accordance with BS 3998. Soil assessments/survey Timing and phasing of works Site specific demolition and hard surface removal specifications Site specific construction specifications (e.g. in connection with foundations, bridging, water features, surfacing) Access arrangements and car parking Level changes Landscaping proposals A Tree protection plan** in accordance with BS5837* detailing all methods of protection, including but not restricted to: locations of construction exclusion zones, root protection areas, fit for purpose fencing and ground protection, service routes, works access space, material/machinery/waste storage and permanent & temporary hard surfaces. Soil remediation plans, where unauthorised access has damaged root protection areas in the construction exclusion zones. Details of the arboricultural supervision schedule. All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. *Using the most recent revision the of the Standard ** Plans must be of a minimum scale of 1:200 (unless otherwise agreed by the Local Planning Authority) Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change. 12 Before the development is brought into use, a Landscape scheme, showing location and types of landscape treatment shall be submitted for approval by the Local Planning Authority. The Landscape scheme should be prepared in accordance with RMBC landscape guidance document and shall be implemented in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season. Reason In the interests of the visual amenities of the area. Land Contamination 13 In the event that during development works unexpected significant contamination is encountered at any stage of the process, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. 14 If subsoils / topsoils are required to be imported to site for garden or soft landscaping areas, then these soils will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination. The results of testing will need to be presented in the format of a Validation Report. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. Ecology 15 No removal of hedgerows, trees, shrubs, brambles, ivy, other climbing plants or works to or demolition of buildings or structures that may be used by breeding birds shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority. Reason To protect species protected by law. 16 Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme. The scheme shall include, but not limited to, the following details: i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken; ii. Materials and construction to ensure long lifespan of the feature/measure iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken. iv. When the features or measures will be installed within the construction, occupation, or phase of the development. Reason To ensure appropriate biodiversity enhancement at the site in accordance with Policy SP 33: Conserving and Enhancing the Natural Environment. The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Condition numbered 11 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition number 11 is fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ Informative(s) Ecology 01 Biodiversity Net Gain Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days). Biodiversity Gain Plan The biodiversity gain plan must include/accompanied by: (a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat; (b) the pre-development biodiversity value of the onsite habitat; (c) the post-development biodiversity value of the onsite habitat; (d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development; (e) any biodiversity credits purchased for the development; (f) any information relating to irreplaceable habitat making up onsite habitat (g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline. (h) any additional information requirements stipulated by the secretary of state. 02 Bats If a bat or evidence of bats using a feature on site is discovered prior to or during development all work should stop immediately. A licensed bat consultant or Natural England must be contacted and works implemented only in accordance with methods advised by them. This advice note should be provided to any persons/contractors carrying out the development along with the contact details of a relevant ecological consultant. 03 Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted. Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged. Environmental Health 04 You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway. Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. Best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Local Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. Trees 05 It is advised that the replacement trees required as part of condition 11 should include native bushes and trees. In addition, bat and/or bird boxes could be erected on the new and existing buildings to help with biodiversity enhancements. Gigabit Broadband 06 The dwelling hereby approved should include measures to facilitate the provision of gigabit-capable full fibre broadband. Please contact SFSY (Super Fast South Yorkshire) at hello@superfastsouthyorkshire.co.uk PO Box 634, Barnsley, South Yorkshire S70 9GG, 01226 772215 for further information in this respect. POSITIVE AND PROACTIVE STATEMENT Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.