Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2025/0180
Site Address: Land Adjacent Dell Cottage Ladyfield Road Kiveton Park 9999
Description: Erection of self build bungalow
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 26 June 2025
Decision Date: 26 June 2025
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 04 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 04 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans Drawings numbered 25-01, 25-02, 25-03, 25-04 and 25-05 received 6 February 2025. Reason To define the permission and for the avoidance of doubt. 03 Prior to any above ground development the details of the materials to be used in the construction of the external surfaces of the development hereby permitted shall be submitted or samples of the materials shall be left on site, for approval in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples. Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity. 04 The development hereby granted shall not begin until details of the foul and surface water drainage for the site have been submitted to and approved by the Local Planning Authority. The approved works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the dwelling. Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan. 05 Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either; a/ a permeable surface and associated water retention/collection drainage, or; b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity 06 Prior to the development being brought into use, off street parking for shall be provided for Dell Cottage in accordance with the Councils parking standards. Reason To ensure there is an adequate parking space clear of the highway in the interests of road safety. 07 If during development works unexpected significant contamination is encountered, the Local Planning Authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. Reason To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 189 and 190 of the National Planning Policy Framework, December 2023 08 If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Planning Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment. Reason To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph numbers 189 and 190 of the National Planning Policy Framework, December 2023 09 No removal of hedgerows, trees or shrubs shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the Local Planning Authority. Reason To ensure the protection of the local wildlife. 10 Prior to the occupation of the dwelling, details of an Electric Vehicle Charging connection point shall be submitted to and approved by the Local Planning Authority. The dwelling shall not be occupied until the approved charger has been provided, and it shall thereafter be retained. Reason In the interests of air quality and to provide appropriate facilities for electric vehicles. 11 No boundary treatment shall erected until details have been submitted to and approved in writing by the Local Planning Authority. Reason In the interests of the visual amenity of the area 12 Notwithstanding the provisions of The Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order with or without modification) no enlargement of the dwellinghouse, permitted under Part 1, Classes AA and B and C of The Town and Country Planning (General Permitted Development) Order 2015 shall be carried out to the dwelling without the prior written approval of the Local Planning Authority. Reason So that further alterations and extensions can be controlled by the Local Planning Authority in order to maintain the visual amenity of the streetscene and the openness and appearance of the adjacent Green Belt. 13 The dwelling hereby approved shall be constructed as a self-build/custom build property, as defined in section 1(A1) of the Self-build and Custom Housebuilding Act 2015. The dwelling shall only be occupied as a self-build/custom build dwelling in accordance with Section 1(A1) of the Self-build and Custom Housebuilding Act 2015 for a period of at least 3 years from the date of the first occupation of the dwelling in accordance with the details outlined in the submitted Unilateral Agreement. Reason Exemption from biodiversity net gain has been obtained because the dwelling is a self-build/custom build property. Informatives 01 This development is not subject to the statutory Biodiversity Gain Plan condition because of the declaration on the application form that the development was exempt (as a self build/ custom build property). 02 Drainage Informatives: a) Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84. b). Developments should have floor levels set higher than the recorded flood level or a minimum of 300mm above proposed ground level. c) Surface water drainage plans should include the following: ? Rainwater pipes, gullies and drainage channels including cover levels. ? Inspection chambers, manholes and silt traps including cover and invert levels. ? Pipe sizes, pipe materials, gradients and flow directions. ? Soakaways, including size and material. ? Typical inspection chamber / soakaway / silt trap and SW attenuation details. ? Site ground levels and finished floor levels. d). Surface Water Discharge From Greenfield Site: The total surface water discharge from greenfield sites should be limited to green field run- off rates - up to 1 in 100 years storm + climate change. On site surface water attenuation will be required. If the greenfield run-off for a site is calculated at less than 2 l/s/ha then a minimum of 2 l/s can be used (subject to approval from the LPA) e). On Site Surface Water Management: The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land. The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated. Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway. Guidance on flood pathways can be found in BS EN 752. 03 It is recommended that the following advice is followed to prevent a nuisance/ loss of amenity to local residential areas. Please note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in an unlimited fine upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to the below recommendations and to the steps that may be required to prevent a noise nuisance from being created. (i) Except in case of emergency, operations should not take place on site other than between the hours of 08:00 - 18:00 Monday to Friday and between 09:00 - 13:00 on Saturdays. There should be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Local Planning Authority should be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided. (ii) Heavy goods vehicles should only enter or leave the site between the hours of 08:00 - 18:00 on weekdays and 09:00 - 13:00 Saturdays and no such movements should take place on or off the site on Sundays or Public Holidays (this excludes the movement of private vehicles for personal transport). (iii) Best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Local Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. (iv) Effective steps should be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. 04 The planning permission is subject to a Legal Agreement (Obligation) under Section 106 of the Town and Country Planning Act 1990. The S106 Agreement is legally binding and is registered as a Local Land Charge. It is normally enforceable against the people entering into the agreement and any subsequent owner of the site. Positive and Proactive Statement During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen