Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2025/0135
Site Address: land rear of 3 Rockingham Road Swinton 9999
Description: Erection of 3 detached dwellings
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 04 August 2025
Decision Date: 04 August 2025
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2B)
Conditions / Reason for Refusal: 001 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) (Drawing numbers Location Plan PL01 Site plan PL04 Rev G House type 1 Elevations and floorplans PL14 Rev C House type 2 Elevations and floorplans PL15 Rev B received 11.02.25 and 15.07.25). Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing nos. elevations (ref Elevations PL14 Rev C and PL15 Rev B). The development shall thereafter be carried out in accordance with these details. Reason In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design. 04 Before the development is brought into use the sight lines indicated on the plan PL04G shall be rendered effective by removing or reducing the height of anything existing on the land between the sight line and the highway which obstructs visibility at any height greater than 900mm above the level of the nearside channel of the adjacent carriageway and the visibility thus provided shall be maintained. Reason In the interests of satisfactory visibility and road safety 05 Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety. Environmental Health 06 Glazing and Ventilation Prior to the occupation of the first unit, the glazing and trickle ventilation shall be installed as specified in Table 4 of Section 4.2 and Figure 6 of Section 4.1 of the Residential Noise Assessment, undertaken by Nova Acoustics Limited (Project Ref No: NP-009274), dated 10 May 2023. Reason In order to protect the amenity of future residents. Yorkshire Water 07 The development shall be carried out in accordance with the details shown on the submitted plan, "'Drainage Report' prepared by RAB, dated 13/05/25", unless otherwise agreed in writing with the Local Planning Authority. Reason In the interest of satisfactory and sustainable drainage. 08 Prior to the occupation of the first dwelling the approved boundary plan (ref PL07 Rev C) indicating the positions, design, materials and type of boundary treatment to be erected shall be completed. Reason In the interests of the visual amenity of the area and the amenity of neighbouring residents. Landscaping 09 Before the development is brought into use, the approved Landscape scheme (ref PL07 Rev C) shall be implemented in accordance with RMBC Landscape Design Guide (April 2014) in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season. Reason To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity and in accordance with Local Plan Policies. Tree Conditions 10 All onsite works shall be carried out in accordance within the approved Arboricultural Method Statement (ref Selwyn Trees, 0355 Rev B dated 16.06.25, Planting Plan 1:250). All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change in accordance with Rotherham’s Core Strategy Policies CS3: Location of New Development, CS19Green Infrastructure, CS20 Biodiversity and Geodiversity, Policy CS21 Landscape, CS28 Sustainable Design. Biodiversity 11 Prior to the completion of the final dwelling a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog homes and holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented prior to the first dwelling being occupied and thereafter retained and maintained for their designed purpose in accordance with the approved scheme. The scheme shall include, but not limited to, the following details: i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken; ii. Materials and construction to ensure long lifespan of the feature/measure; iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken. iv. When the features or measures will be installed within the construction, occupation, or phase of the development. Reason To ensure no net loss in biodiversity across the site. Removal of Permitted Development Rights 12 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), no extensions or alterations otherwise Permitted under Part One Classes A (rear extensions), B (additions etc to the roof of a dwellinghouse) and E (outbuildings) shall be carried out to the approved dwelling. Reason In the interests of the amenities of the occupiers of adjoining properties in accordance with the SYRDG. Informatives Biodiversity Net Gain 01 Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days). Biodiversity Gain Plan The biodiversity gain plan must include/accompanied by: (a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat; (b) the pre-development biodiversity value of the onsite habitat; (c) the post-development biodiversity value of the onsite habitat; (d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development; (e) any biodiversity credits purchased for the development; (f) any information relating to irreplaceable habitat making up onsite habitat (g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline. (h) any additional information requirements stipulated by the secretary of state. The effect of section 73D of the Town and Country Planning Act 1990 If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted. Those circumstances are that the conditions subject to which the section 73 permission is granted: 1. do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and 2. in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan. - Listed exemptions from Statutory BNG and transitional arrangements can be found at Biodiversity net gain: exempt developments - GOV.UK (www.gov.uk) - The Statutory Biodiversity Gain Plan template can be found at https://www.gov.uk/government/publications/biodiversity-gain-plan - Minimum legal requirements for the Biodiversity Gain plan can be found at https://www.legislation.gov.uk/ukpga/2021/30/schedule/14#:~:text=paragraph%2015).-,Biodiversity%20gain%20plan,-14 - Irreplaceable habitats for the purposed of Biodiversity Net Gain are defined by Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024. A full list of irreplaceable habitats can be found at https://www.legislation.gov.uk/uksi/2024/48/schedule/made - Additional information required is outlined by Articles 37C(2) [Non Phased] 37C(4) [Phased] of The Town and Country Planning (Development Management Procedure) (England) Order 2015 and may be subject to the nature of your application https://www.legislation.gov.uk/uksi/2015/595#:~:text=Additional%20content%20of%20plan - Where a Habitat Management and Monitoring Plan is required: https://publications.naturalengland.org.uk/publication/5813530037846016 Noise 01 Mechanical Extract Ventilation System A continuous mechanical extract ventilation (MEV) system shall be installed to each dwelling to provide ‘Whole Dwelling Ventilation’ in accordance with the Building Regulations Approved Document F. Consideration shall be given to 1.5 to 1.7 of Approved Document F to assist in the design of the ventilation system and to ensure the self-generated noise levels from the MEV extract fans to not exceed the specified criteria as detailed in BS8233:2014. Wildlife Legislation 02 Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted. POSITIVE AND PROACTIVE STATEMENT Whilst the applicant did not enter into any formal pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and following clarifications and additional information did not require any alterations or modification.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen