| Conditions / Reason for Refusal: |
The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 05/06/09/15 & 20 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because:
i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination.
ii. The details required under condition numbers 05/06/09/15 & 20 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below)
Drawing Numbers (717-021-002-L002/717021002-PM_40_40-X100-D-A-001 Rev P01/ 0002-P01/ 0003-P01/004-P01/0015-P01/0102/0151-P01/0161-P01/ 771-005-149-001/101/200/717021002-RMBC-PM_40_40_18-XZZ-D-A-0160 Rev P01)(Received 24/01/2025)
Drawing Numbers, 717021002-RMBC-PM_40_40 – XRF – D – A – 0132 -P03 (Received 18/03/2025)
717021002-RMBC-PM_40_40 – XZZ-D-A-0102- Rev P04/0150 Rev P05(09/05/2025)
Reason
To define the permission and for the avoidance of doubt.
03
No development above ground level shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples.
Reason
To protect the special character and appearance of the Grade II Listed Building in accordance with Policy SP40 ‘Listed Buildings.’
04
No noise generating fixed plant including (but not limited to) mechanical ventilation, air conditioning / refrigeration compressor units shall be installed in any part of the development until full and precise details have been submitted to and approved in writing by the Local Planning Authority. The details shall include a BS4142:2014+A1:2019 noise assessment which has been carried out by a competent person and include 1/3 octave frequency analysis with appropriate corrections for acoustic features and shall detail any mitigation measures, physical or operational to achieve a maximum cumulative plant Noise
Rating Level of no more than 0dB(A) above the prevailing background levels, outside the boundary of the nearest noise sensitive property.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with
RMBC Policy SP52 and parts 12 & 15 of the NPPF.
05
Prior to the commencement of any works (including demolition) on site, a Construction Environmental Management Plan (CEMP) shall be provided to the Local Planning Authority. The plan shall describe in detail the actions that will be taken to minimise adverse impacts on occupiers of nearby properties by effectively controlling:
• Noise & vibration arising from all construction and demolition related activities - Contractors and site staff are expected to use the best practical means to minimise noise on site. Regard shall be had to the guidance detailed in BS5228 2009: ‘Noise and Vibration Control on Construction Sites’.
• Dust arising from all construction and demolition related activities - Contractors and site staff are expected to use the best practical means to minimise dust on site. Regard shall be had to the guidance detailed in Institute of Air Quality Management- Guidance of the assessment of dust from demolition and construction 2014.
• Artificial lighting used in connection with all construction related activities and security of the construction site - Contractors and site staff are expected to use the best practical means to minimise light nuisance on site. Regard shall be had to the guidance detailed in the Institute of Lighting Professionals - Guidance Note 01/21 – Reduction of Obtrusive Light.
The CEMP to be submitted shall be in report format and as a minimum is to include the following details as specified in the subheadings below:
• Program and Phasing Details
- Site layout
- Operational hours
- Expected duration of demolition and construction work phases
• Site Management
- Contact details of site manager for public liaison purposes
- Complaints procedure
- Roles and responsibilities
• Routes for Construction Traffic
- Routes to be used for access onto site and egress
- One way systems
- Haul routes (onsite and delivery)
• Site Access, Storage and Movement of Materials
- Delivery access point details
- Location details of storage areas
- Delivery times of materials and plant
• Dust, Debris and Mud
- Screening and hoarding
- Preventative measures
- Dust suppression measures -General and machinery
- Wheel wash facilities
- Road sweeping facilities
- Covering of dusty stockpiles
- Vehicles carrying dusty loads
- Dust monitoring
- Boundary checks
- Monitoring of weather including wind speed and direction, dry conditions etc
• Noise and Vibration Control
- Silencing of vehicles, plant and machinery
- Mitigation measures for noisy operations
- Operational hours
- One way systems
- Vehicle reverse alarms
- Leaflet drops to noise sensitive premises
• Artificial Lighting
- Hours of operation of the lighting
- Location and specification of all of the luminaires
- Level of maintained average horizontal illuminance for the areas that needs to be
illuminated
- Predicted vertical illuminance that will be caused by the proposed lighting when
measured at windows of any properties in the vicinity
- Measures that will be taken to minimise or eliminate glare and stray light arising from the use of the lighting that is caused beyond the boundary of the site
• Waste Management
- Waste storage
- Waste collection
- Recycling
- Waste removal
Reason:
To safeguard the amenities of the occupiers of nearby properties and promote sustainable development in accordance with Part 15 of the NPPF and RMBC Policy SP52.
06
Part A (pre-commencement)
No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of
Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include:
• The programme and method of site investigation and recording.
• The requirement to seek preservation in situ of identified features of importance.
• The programme for post-investigation assessment.
• The provision to be made for analysis and reporting.
• The provision to be made for publication and dissemination of the results.
• The provision to be made for deposition of the archive created.
• Nomination of a competent person/persons or organisation to undertake the works.
• The timetable for completion of all site investigation and post-investigation works.
Part B (pre-occupation/use)
Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.
Reason
To ensure that any archaeological remains present, whether buried or part of a standing building, are investigated and a proper understanding of their nature, date, extent and significance gained, before those remains are damaged or destroyed and that knowledge gained is then disseminated. In accordance with Local Plan SP 43 ‘Conserving and Recording the Historic Environment.’
Trees and Landscaping
07
Prior to any above ground development taking place a detailed landscape scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary:
• The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove.
• The extent of any changes to existing ground levels, where these are proposed.
• Any constraints in the form of existing or proposed site services, or visibility requirements.
• Areas of structural and ornamental planting that are to be carried out.
• The positions, design, materials and type of any fencing, gates and boundary treatment to be erected.
• A planting plan and schedule detailing the proposed species, siting, quality and size specification, and planting distances.
• A written specification for ground preparation and soft landscape works. - The programme for implementation.
• A replacement tree plan and schedule detailing the proposed species, siting, quality and size specification, and planting distances.
• Any plants or trees which within a period of 5 years from completion of planting die, are removed or damaged, or that fail to thrive shall be replaced. Assessment of requirements for replacement planting shall be carried out on an annual basis in September of each year and any defective work or materials discovered shall be rectified before 31st December of that year.
• Written details of the responsibility for ongoing maintenance and a schedule of operations for the lifetime of the development.
The scheme shall thereafter be implemented in accordance with the approved landscape scheme and in accordance with the appropriate standards and codes of practice within a timescale agreed, in writing, by the Local Planning Authority.
Reason
To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity and in accordance with SP32 ‘Green Infrastructure and Landscape’
08
No work or storage on the site shall commence until all the trees/shrubs to be retained have been protected by the tree protection measures, set out in the approved Phase 2 Pre-Development Arboricultural Report and Method Statement and Tree Protection Plan, dated 04 November 2024. These protection measures shall be fully adhered to until all development has been completed and machinery and surplus materials have been removed from the site, unless otherwise agreed with the Local Planning Authority.
Reason
To ensure appropriate tree protection in the interests of protecting the visual amenity of the area in accordance with policy SP32 Green Infrastructure and Landscape.
Ecology
09
Notwithstanding the submitted details, before development is brought into use details of external lighting shall be submitted to and approved in writing by the Local Planning Authority. The details shall clearly demonstrate that lighting will not cause excessive light pollution or disturb or prevent bats or other species using key corridors, foraging habitat features or accessing roost sites. The details shall include, but not limited to, the following:
All external/internal lighting shall be installed in accordance with the specifications and locations set out in the approved details. These shall be maintained thereafter in accordance with these details. Under no circumstances shall any other external lighting be installed.
Reason
To protect species protected by law.
10
No removal of hedgerows, trees or shrubs shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority.
Reason
In the interests of ecology.
11
Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
• Description, design or specification of the type of feature(s) or measure(s) to be undertaken;
• Materials and construction to ensure long lifespan of the feature/measure
• A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken.
• When the features or measures will be installed within the construction, occupation, or phase of the development.
Reason
In the interests of ecology.
12
Prior to the commencement of development, a construction environmental management plan (CEMP: Biodiversity) shall have been submitted to and approved in writing by the local planning authority.
The CEMP (Biodiversity) shall include the following.
a) Risk assessment of potentially damaging construction activities.
b) Identification of “biodiversity protection zones”.
c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements).
d) The location and timing of sensitive works to avoid harm to biodiversity features.
e) The times during construction when specialist ecologists need to be present on site to oversee works.
f) Responsible persons and lines of communication.
g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person.
h) Use of protective fences, exclusion barriers and warning signs.
The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority.
Reason
In the interests of ecology.
Highways
13
Before the development is brought into use, the eastern access shall be signed or marked ‘In Only’ in accordance with details to be submitted to and approved by the Local Planning Authority. The access shall thereafter be used as a one-way system only.
Reason
In the interests of road safety.
14
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety.
15
Before the development is brought into use the car parking area shown on the submitted plan shall be provided, marked out and thereafter maintained for car parking.
Reason
To ensure the provision of satisfactory garage/parking space and avoid the necessity for the parking of vehicles on the highway in the interests of road safety.
16
Before the proposed development is brought into use, a Travel Plan shall have been submitted to and approved by the Local Planning Authority. The plan shall include clear and unambiguous objectives, modal split targets together with a time bound programme of implementation, monitoring and regular review and improvement. The Local Planning Authority shall be informed of and give prior approval in writing to any subsequent improvements or modifications to the Travel Plan following submission of progress performance reports as timetabled in the programme of implementation.
Reason
In order to promote sustainable transport choices.
17
The development shall not be commenced until details of the proposed alterations in the highway at vehicle access to the site from East Bawtry Road service road, indicated on plan reference 1863/06/SK06, (swept path analysis) have been submitted to and approved by the Local Planning Authority and the approved details shall be implemented before the development is brought into use.
Reason
In the interest of road safety.
Informative(s)
01
Biodiversity Net Gain
Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days).
Biodiversity Gain Plan
The biodiversity gain plan must include/accompanied by:
(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat;
(b) the pre-development biodiversity value of the onsite habitat;
(c) the post-development biodiversity value of the onsite habitat;
(d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development;
(e) any biodiversity credits purchased for the development;
(f) any information relating to irreplaceable habitat making up onsite habitat
(g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline.
(h) any additional information requirements stipulated by the secretary of state.
The effect of section 73D of the Town and Country Planning Act 1990
If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted.
Those circumstances are that the conditions subject to which the section 73 permission is granted:
1. do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and
2. in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
- Listed exemptions from Statutory BNG and transitional arrangements can be found at Biodiversity net gain: exempt developments - GOV.UK (www.gov.uk)
- The Statutory Biodiversity Gain Plan template can be found at https://www.gov.uk/government/publications/biodiversity-gain-plan
- Minimum legal requirements for the Biodiversity Gain plan can be found at https://www.legislation.gov.uk/ukpga/2021/30/schedule/14#:~:text=paragraph%2015).-,Biodiversity%20gain%20plan,-14
- Irreplaceable habitats for the purposed of Biodiversity Net Gain are defined by Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024. A full list of irreplaceable habitats can be found at https://www.legislation.gov.uk/uksi/2024/48/schedule/made
- Additional information required is outlined by Articles 37C(2) [Non Phased] 37C(4) [Phased] of The Town and Country Planning (Development Management Procedure) (England) Order 2015 and may be subject to the nature of your application https://www.legislation.gov.uk/uksi/2015/595#:~:text=Additional%20content%20of%20plan
- Where a Habitat Management and Monitoring Plan is required: https://publications.naturalengland.org.uk/publication/5813530037846016
02
Please note that the highway works will require an Agreement under S278 Highways Act, 1980 and involve the provision of an amended kerbline fronting East Bawtry Road service road and the provision of tactile paving. Contact should be made with David Phillips via david.phillips@rotherham.gov.uk in order to commence the legal process as soon as is practicable.
POSITIVE AND PROACTIVE STATEMENT
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|