| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans
023011 WBD 01 00 DR A 2001 Rev P01 – Site Location Plan
023011 WBD 01 GF DR A 2009 Rev P01 – Proposed Site Plan
023011 WBD 01 ZZ DR A 2008 Rev P01 – Proposed Elevations
023011 WBD 01 GF DR A 2006 Rev P01 – Proposed Floor Plan
023011 WBD 01 02 DR A 2007 Rev P01 – Proposed Roof Plan
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
Construction Restrictions
04
Except in case of emergency, no construction operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no construction working on Sundays or Public Holidays. At times when construction operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided.
Reason
To safeguard the amenities of the occupiers of nearby properties.
05
All construction machinery and construction vehicles employed on the site during the construction phase shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in British Standard 5228 Code of Practice; 'Noise Control on Construction and Open Sites', and Minerals Planning Guidance Note 11 (1993) 'The Control of Noise at Surface Mineral Workings'.
Reason
To safeguard the amenities of the occupiers of nearby properties.
06
At all times during the carrying out of construction operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption.
Reason
To safeguard the amenities of the occupiers of nearby properties.
07
Effective steps during the construction phase shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site during the construction phase. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway during the construction phase shall be removed immediately by the developer.
Reason
To safeguard the amenities of the occupiers of nearby properties.
General Amenity
08
No noise generating fixed plant including mechanical ventilation, air conditioning / refrigeration compressor units or extraction plant shall be installed in any part of the development until full and precise details have been submitted to and approved in writing by the Local Planning Authority. The details shall include a BS4142:2014+A1:2019 noise assessment and 1/3 octave frequency analysis with appropriate corrections for acoustic features and shall detail any mitigation measures, physical or operational to achieve a maximum cumulative plant Noise Rating Level of no more than 3dB(A) below the prevailing background levels, outside the boundary of the nearest noise sensitive property during the quietest measured period.
Reason
To safeguard the amenities of the occupiers of nearby properties.
Operating Restrictions
09
There shall be no deliveries to the building hereby approved outside of the hours of 0600-2200 Mondays to Fridays.
Reason
In the interests of residential amenity.
Ecology
10
Prior to any external lighting on the building or at the site being installed details of shall be submitted to and approved in writing by the Local Planning Authority. The details shall clearly demonstrate that lighting will not cause excessive light pollution or disturb or prevent bats or other species using key corridors, foraging habitat features or accessing roost sites. The details shall include, but not limited to, the following:
a) A drawing showing sensitive areas and/or dark corridor safeguarding areas;
b) Technical description, design or specification of external lighting to be installed including shields, cowls or blinds where appropriate;
c) A description of the luminosity of lights and their light colour;
d) A drawing(s) showing the location and where appropriate the elevation and height of the light fixings;
e) Methods to control lighting control (e.g. timer operation, passive infrared sensor (PIR));
f) Lighting contour plans both horizontal and vertical where appropriate and taking into account hard landscaping, etc.
All external/internal lighting shall be installed in accordance with the specifications and locations set out in the approved details. These shall be maintained thereafter in accordance with these details. Under no circumstances shall any other external lighting be installed.
Reason
To minimise light pollution and reduce the impact on wildlife.
11
Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure
iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken.
iv. When the features or measures will be installed within the construction, occupation, or phase of the development.
Reason
In the interests of biodiversity enhancement.
BREEAM
12
Any building hereby approved that exceeds a floor area of 1,000 sq.m shall be designed to achieve BREEAM Very Good rating as a minimum. Prior to the commencement of the development of each building a BREEAM Assessors report shall be submitted to and approved in writing by the Local Planning Authority. The building shall subsequently be developed in accordance with the approved details.
Reason
To achieve a sustainable form of development in accordance with the NPPF.
Land Contamination
13
If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment.
Reason
To ensure the safe occupation of the site.
14
If subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment.
Reason
To ensure the safe occupation of the site.
15
Suitable water supply pipes will need to be specified for the site which are considered capable of resisting chemical attack from residual contaminants remaining within the made ground. The use of these approved water supply pipes will need to be evidenced.
Reason
To ensure the safe occupation of the site.
Highways
16
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety.
Informative(s)
01
You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway.
02
Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted.
Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged.
POSITIVE AND PROACTIVE STATEMENT
Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.
|