Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2024/1757
Site Address: 28 Domine Lane Rotherham Town Centre 0028
Description: Demolition of building and erection of 6 storey building to provide 16 apartments
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 05 August 2025
Decision Date: 05 August 2025
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved and/or carried out before development can start. Conditions number 4 of this permission requires matters to be approved and/or carried out before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition number 4 is fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured, or matters carried out.’ General 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans 666/01/01 – Site Location Plan 666/01/02 – Block Plan 666/02/00 Rev B – Ground Floor Plan 666/02/01 Rev C – First Floor Plan 666/02/02 Rev C – Second Floor Plan 666/02/03 Rev C – Third Floor Plan 666/02/04 Rev C – Fourth Floor Plan 666/02/05 Rev B – Fifth Floor Plan 666/02/06 Rev B – Roof Plan 666/04/10 Rev C – Proposed West Elevations 666/04/11 Rev D – Proposed North Elevations 666/04/12 Rev C – Proposed East Elevations 666/04/13 Rev A – Proposed South Elevation 666/90/01 – Landscaping Reason To define the permission and for the avoidance of doubt. 03 Prior to construction works commencing above ground level, details of the materials to be used in the construction of the external surfaces of the development numbered 1 to 9 on drawing numbers 666/04/10 Rev C, 666/04/11 Rev D, 666/04/12 Rev C and 666/04/13 Rev A, hereby permitted shall be submitted to the Local Planning Authority or samples of the materials shall be left on site, and the development shall thereafter be carried out in accordance with the approved details/samples. Reason In order to ensure a satisfactory appearance in the interests of visual amenity. Construction Environment Management Plan 04 Prior to any works commencing on site (including demolition) a Construction Environment Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall describe in detail the actions that will be taken to minimise adverse impacts on occupiers of nearby properties by effectively controlling: • Noise & vibration arising from all construction and demolition related activities - Contractors and site staff are expected to use the best practical means to minimise noise on site. Regard shall be had to the guidance detailed in BS5228 2009: ‘Noise and Vibration Control on Construction Sites’. • Dust arising from all construction and demolition related activities - Contractors and site staff are expected to use the best practical means to minimise dust on site. Regard shall be had to the guidance detailed in Institute of Air Quality Management- Guidance of the assessment of dust from demolition and construction 2014. • Artificial lighting used in connection with all construction related activities and security of the construction site - Contractors and site staff are expected to use the best practical means to minimise light nuisance on site. Regard shall be had to the guidance detailed in the Institute of Lighting Professionals - Guidance Note 01/21 – Reduction of Obtrusive Light. The CEMP to be submitted shall be in report format and as a minimum is to include the following details as specified in the subheadings below: • Program and Phasing Details o Site layout o Operational hours o Expected duration of demolition and construction work phases • Site Management o Contact details of site manager for public liaison purposes o Complaints procedure - Roles and responsibilities • Routes for Construction Traffic o Routes to be used for access onto site and egress o One way systems o Haul routes (onsite and delivery) • Site Access, Storage and Movement of Materials o Delivery access point details o Location details of storage / loading / unloading of materials / plant areas o Car Parking facilities for construction staff o Delivery times of materials and plant o Reference to how the development will legally take access from the adjacent highway i.e. s278 or s184 agreement • Dust, Debris and Mud o Screening and hoarding o Preventative measures o Dust suppression measures o General and machinery o Wheel wash facilities o Road sweeping facilities o Covering of dusty stockpiles o Vehicles carrying dusty loads o Dust monitoring o Boundary checks o Monitoring of weather including wind speed and direction, dry conditions etc • Noise and Vibration Control o Silencing of vehicles, plant and machinery o Mitigation measures for noisy operations o Operational hours o One way systems o Vehicle reverse alarms o Leaflet drops to noise sensitive premises • Artificial Lighting o Hours of operation of the lighting o Location and specification of all of the luminaires o Level of maintained average horizontal illuminance for the areas that needs to be illuminated o Predicted vertical illuminance that will be caused by the proposed lighting when measured at windows of any properties in the vicinity o Measures that will be taken to minimise or eliminate glare and stray light arising from the use of the lighting that is caused beyond the boundary of the site • Waste Management o Waste storage o Waste collection o Recycling o Waste removal Reason To safeguard the amenities of the occupiers of nearby properties and promote sustainable development. General Amenity 05 A scheme of sound insulation including glazing and Mechanical Ventilation with Heat Recovery (MVHR) shall be installed in accordance with the criteria and specifications as detailed in Section 4.2 of the Noise Impact Assessment carried out by Environmental Noise Solutions Limited, dated 27th November 2024, (Ref: NIA-11751-24-11984-V1-Domine Lane (final)). Internal noise levels due to mechanical ventilation plant should not exceed 26 dB(A) in bedrooms and 30dB(A) in living rooms. Reason To safeguard the amenities of the occupiers of the proposed development. Ecology and Biodiversity 06 Notwithstanding the submitted details, before above ground construction works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme. The scheme shall include, but not limited to, the following details: i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken; ii. Materials and construction to ensure long lifespan of the feature/measure iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken. iv. When the features or measures will be installed within the construction, occupation, or phase of the development. Reason In the interests of biodiversity and ecology. Drainage 07 The development hereby granted shall not be occupied until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development. Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin. 08 The development shall be carried out in accordance with the details shown on the submitted plan, 'K019-CHG-Z0-00-DR-C-50' (revision P01) dated 12/05/2025 that has been prepared by Collins Hall Green Ltd. Reason In the interest of satisfactory and sustainable drainage. Land Contamination 09 If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment. Reason To ensure the safe occupation of the site. 10 If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment. Reason To ensure the safe occupation of the site. Local Labour Agreement (Construction Phase) 11 Prior to the commencement of construction works (excluding demolition), the attached Local labour Agreement pro forma for the construction phase of the development shall be completed in its entirety and submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved Agreement and within 3 months of completion of the approved development, data shall be submitted to the Local Planning Authority demonstrating how the indicators were met. Reason To improve skills in all of Rotherham’s communities through the promotion of access to training, education and local employment opportunities, in accordance with Policy CS10 ‘Improving Skills and Employment Opportunities’. Waste Management Plan 12 Prior to the development being first occupied a Waste Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan will need to include: • information on the amount and type of waste that will be generated from the site; • measures to reduce, re-use and recycle waste within the development, including the provision of on-site separation and treatment facilities (using fixed or mobile plants where appropriate); • an assessment of the potential to re-use or adapt existing buildings on the site (if demolished it must explain why it is not possible to retain them); • design and layouts that allow effective sorting and storing of recyclables and recycling and composting of waste and facilitate waste collection operations during the lifetime of the development; • measures to minimise the use of raw materials and minimise pollution of any waste; • details on how residual waste will be disposed in an environmentally responsible manner and transported during the construction process and beyond; • construction and design measures that minimise the use of raw materials and encourage the re-use of recycled or secondary resources (particularly building materials) and also ensure maximum waste recovery once the development is completed; and • details on how the development will be monitored following its completion. The agreed details shall be implemented and thereafter maintained. Reason To minimise the amount of waste used during the construction and lifetime of the project and to encourage the re-use and recycling of waste materials on site. Informative(s) 01 It is advised that the development is built to Secured by Design. The Designing Out Crime Officer at South Yorkshire Police has recommended the following: Lighting The entrance into the development should be well lit and offer as much natural surveillance to the street scene as possible. Also the communal stairwell should be lit 24/7 Security of Dwelling The communal door into the central stairwell for the flats should comply with standard LPS 1175 SR 2 or better and all apartment doors should be to standard PAS 24 of 2022 which is the enhanced security standard approved by Secure by Design and is the standard for approved document Q. Each flat should have audio-visual access control for the communal door to allow for visitors. 02 Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84. Developments should have floor levels set higher than the recorded flood level or a minimum of 300mm above proposed ground level. • Surface water drainage plans should include the following: • Rainwater pipes, gullies and drainage channels including cover levels. • Inspection chambers, manholes and silt traps including cover and invert levels. • Pipe sizes, pipe materials, gradients and flow directions. • Soakaways, including size and material. • Typical inspection chamber / soakaway / silt trap and SW attenuation details. • Site ground levels and finished floor levels. Surface Water Discharge From Brownfield Site: There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased. A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off rate. On Site Surface Water Management: The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land. The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated. Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway. Guidance on flood pathways can be found in BS EN 752. If infiltration systems are to be used for surface water disposal, the following information must be provided: • Ground percolation tests to BRE 365. • Ground water levels records. Minimum 1m clearance from maximum seasonal groundwater level to base of infiltration compound. This should include assessment of relevant groundwater borehole records, maps and on-site monitoring in wells. • Soil / rock descriptions in accordance with BS EN ISO 14688-1:2002 or BS EN ISO 14689-1:2003 • Volume design calculations to 1-in 100-year rainfall + 40% climate change standard. An appropriate factor of safety should be applied to the design in accordance with CIRIA C753 – Table 25.2. • Location plans indicating position (Soakaways serving more than one property must be located in an accessible position for maintenance). Soakaways should not be used within 5m of buildings or the highway or any other structure. • Drawing details including sizes and material. • Details of a sedimentation chamber (silt trap) upstream of the inlet should be included. Soakaway detailed design guidance is given in CIRIA Report 753, CIRIA Report 156 and BRE Digest 365. Watercourse consent may be required by the applicant from RMBC Flood Risk Team OR the Local Internal Drainage Board for any works on the watercourses adjacent to / crossing the site. Written evidence is required from the LLFA / sewerage undertaker / Internal Drainage Board / Environment Agency to confirm any adoption agreements and discharge rates. The applicant may require written consent from the Environment Agency, for any proposed discharge to “controlled waters” (main river/watercourse). If the development is proposing to make a new highway drainage connection to an existing highway drainage system, detailed CCTV surveys and modelling of the existing highway drainage system will be required to determine the capability to accept additional flow. Discharge will be limited to greenfield run-off rates. Whereby a private maintenance arrangement is proposed and the development is unlikely to remain under single ownership or within a single curtilage over its lifetime a condition will require a satisfactory legal agreement to be drawn up to provide for inspection and maintenance of the proposed surface water drainage scheme. This legal agreement is required BEFORE the first occupation of any dwelling or building on the site. Over the lifetime of the development an agreement must include the following: • A detailed operational maintenance plan; • Physical access arrangements for maintenance, and establishment of legal rights of access in perpetuity, prior to the commencement of any phase of the development; • A financial revenue plan clearly setting out how funding for maintenance is to be raised over the lifetime of the development; • A whole life cost analysis for capital maintenance over the lifetime of the development. Any values should be based on the current HM Treasury Present Value (PV) Discount Rate. Assumptions about the expected useful life of materials should be included in any such analysis; and • Details of financial surety to ensure long-term maintenance and capital maintenance costs of apparatus. It is for the developer to demonstrate that a suitable financial underwriting arrangement is in place. 03 You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway. 04 Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted. POSITIVE AND PROACTIVE STATEMENT During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.