Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2024/1722
Site Address: Thrybergh Reservoir Café Doncaster Road Thrybergh 9999
Description: Refurbishment of existing café building with new external access ramp and formation of hardstanding for external seating area with fixed canopy and landscaping
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 31 January 2025
Decision Date: 31 January 2025
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below) except as shall be otherwise agreed in writing by the Local Planning Authority. Drawing numbers 005/003/066/ BS001/ BS002/ BS101/BS102/ BS003 Drawing numbers / Lighting Plan LS4066930b (received 27/11/2024) Reason To define the permission and for the avoidance of doubt. 03 Notwithstanding the approved details, before above ground works commence details of external lighting shall be submitted to and approved in writing by the Local Planning Authority. The details shall clearly demonstrate that lighting will not cause excessive light pollution or disturb or prevent bats or other species using key corridors, foraging habitat features or accessing roost sites. The details shall include, but not limited to, the following: a) A drawing showing sensitive areas and/or dark corridor safeguarding areas; b) Technical description, design or specification of external lighting to be installed including shields, cowls or blinds where appropriate; c) A description of the luminosity of lights and their light colour; d) A drawing(s) showing the location and where appropriate the elevation and height of the light fixings; e) Methods to control lighting control (e.g. timer operation, passive infrared sensor (PIR)); f) Lighting contour plans both horizontal and vertical where appropriate and taking into account hard landscaping, etc. All external/internal lighting shall be installed in accordance with the specifications and locations set out in the approved details. These shall be maintained thereafter in accordance with these details. Under no circumstances shall any other external lighting be installed Reason To protect species protected by law. 04 No removal of hedgerows, trees or shrubs or works to or demolition of buildings or structures that may be used by breeding birds shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority. Reason To protect species protected by law. 05 Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme. The scheme shall include, but not limited to, the following details: i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken; ii. Materials and construction to ensure long lifespan of the feature/measure iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken. iv. When the features or measures will be installed within the construction, occupation, or phase of the development. 06 The development shall not commence until a Habitat Management and Monitoring Plan (HMMP) has been submitted prepared in accordance with the approved Biodiversity Gain Plan and including: a) a non-technical summary; b) the roles and responsibilities of the people or organisation(s) delivering the [HMMP]; c) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan; d) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and e) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority, has been submitted to, and approved in writing by, the local planning authority Reason In order to ensure that the required levels of BNG are provided on site. 07 Prior to commencement of development, a detailed landscape scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary: -The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove. -The extent of any changes to existing ground levels, where these are proposed. -Any constraints in the form of existing or proposed site services, or visibility requirements. -Areas of structural and ornamental planting that are to be carried out. -The positions, design, materials and type of any boundary treatment to be erected. -A planting plan and schedule detailing the proposed species, siting, quality and size specification, and planting distances. -A written specification for ground preparation and soft landscape works. -The programme for implementation. -Written details of the responsibility for maintenance and a schedule of operations, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme. The scheme shall thereafter be implemented in accordance with the approved landscape scheme within a timescale agreed, in writing, by the Local Planning Authority. Reason To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity and in accordance with SP32 ‘Green Infrastructure and Landscape’ 08 No development above ground level shall take place until details of the materials to be used in the construction of the external surfaces of the development, including the ramp, hereby approved have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples. Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with SP55 ‘Design Principles.’ INFORMATIVE 01 Biodiversity Net Gain Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days). Biodiversity Gain Plan The biodiversity gain plan must include/accompanied by: (a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat; (b) the pre-development biodiversity value of the onsite habitat; (c) the post-development biodiversity value of the onsite habitat; (d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development; (e) any biodiversity credits purchased for the development; (f) any information relating to irreplaceable habitat making up onsite habitat (g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline. (h) any additional information requirements stipulated by the secretary of state. The effect of section 73D of the Town and Country Planning Act 1990 If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted. Those circumstances are that the conditions subject to which the section 73 permission is granted: 1. do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and 2. in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan. - Listed exemptions from Statutory BNG and transitional arrangements can be found at Biodiversity net gain: exempt developments - GOV.UK (www.gov.uk) - The Statutory Biodiversity Gain Plan template can be found at https://www.gov.uk/government/publications/biodiversity-gain-plan - Minimum legal requirements for the Biodiversity Gain plan can be found at https://www.legislation.gov.uk/ukpga/2021/30/schedule/14#:~:text=paragraph%2015).-,Biodiversity%20gain%20plan,-14 - Irreplaceable habitats for the purposed of Biodiversity Net Gain are defined by Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024. A full list of irreplaceable habitats can be found at https://www.legislation.gov.uk/uksi/2024/48/schedule/made - Additional information required is outlined by Articles 37C(2) [Non Phased] 37C(4) [Phased] of The Town and Country Planning (Development Management Procedure) (England) Order 2015 and may be subject to the nature of your application https://www.legislation.gov.uk/uksi/2015/595#:~:text=Additional%20content%20of%20plan - Where a Habitat Management and Monitoring Plan is required: https://publications.naturalengland.org.uk/publication/5813530037846016 Please note that Informative 1 relates to Biodiversity Net Gain, and notes that this permission is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The Informative adds that failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days). 02 Additional Ecology Informatives: Guidance regarding lighting issues can be found in the ‘Guidance Note 08/23: Bats and Artificial Lighting At Night’ Institute of Lighting Professionals, 2023. In order to discharge Condition 05 relating to biodiversity enhancements. The following should be included: • 1 bird box integrated into the building on a northerly aspect/orientation (north, north-east and north-west). Example specification includes the Schwegler Brick Box Type 24, Woodstone Sparrow Nest Box or an equivalent suitable for tits, sparrows or starlings. The boxes should be located between two to four metres high, ideally at the gable apex or at eaves. The box can be installed flush with the outside wall and can be rendered or covered so that only the entrance hole is visible. • 1 bat boxes should be integrated into buildings on a southerly aspect / orientation (south, south west, and south-east). Boxes should be located a minimum of 2 metres, but ideally 5-7 metres above ground, in a position near the eaves or gable apex. Placement should avoid windows, doors and wall climbing plants. Positive and Proactive Statement The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.