| Conditions / Reason for Refusal: |
General
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans
AES-0590-1B – Location Plan
AES-0590-102 rev 2 – Site Block Plan
AES-0590-121 – Proposed Elevations Plots 1-4
AES-0590-122 – Proposed Ground Floor Plans Plots 1-4
AES-0590-123 – Proposed First Floor Plans Plots 1-4
AES-0590-124 rev 1 – Streetscene and Materials
AES-0590-125 rev 3 – Proposed Landscape Plan
AES-0590-126 rev 2 – Proposed Drainage Scheme
AES-0590-130 – Proposed Elevations Plots 5-7
AES-0590-131 – Proposed Ground Floor Plans Plots 5-7
AES-0590-132 – Proposed First Floor Plans Plots 5-7
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form and shown on drawing no AES-0590-124 rev 1. The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
Construction Practices
04
Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided.
Reason
In the interests of highway safety and residential amenity.
05
All machinery and vehicles employed on the site shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in British Standard 5228 Code of Practice; 'Noise Control on Construction and Open Sites', and Minerals Planning Guidance Note 11 (1993) 'The Control of Noise at Surface Mineral Workings'
Reason
In the interests of highway safety and residential amenity.
06
At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
Reason
In the interests of highway safety and residential amenity.
07
Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
Reason
In the interests of highway safety and residential amenity.
Highways
08
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either
a/ a permeable surface and associated water retention/collection drainage, or
b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site.
All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
09
When the proposed access has been brought into use, the existing accesses shall be permanently closed and the footpath / kerbline reinstated in accordance with details to be submitted to and approved by the Local Planning Authority.
Reason
In the interests of road safety.
10
Prior to the first dwelling being occupied, a scheme shall be submitted to and approved in writing by the Local Planning Authority detailing how the use of sustainable/public transport will be encouraged. The agreed details shall be implemented in accordance with a timescale to be agreed by the Local Planning Authority.
Reason
In order to promote sustainable transport choices.
EV Charging Points
11
The development shall be completed in accordance with the approved electric vehicle charging details shown on plan ref: AES-0590-102 rev 2 and retained in perpetuity. Each dwelling shall not be occupied until the charging point is provided.
Reason
In the interests of sustainable development and air quality in accordance with the Local Plan and the NPPF.
Ecology and BNG
12
No removal of hedgerows, trees, shrubs, brambles, ivy or works to or demolition of
buildings or structures that may be used by breeding birds shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority.
Reason
In order not to disturb any bats or birds and to make adequate provision for species protected by the Wildlife & Countryside Act 1981.
13
Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure
iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken.
iv. When the features or measures will be installed within the construction, occupation, or phase of the development.
Reason
In the interests of biodiversity and ecology.
Drainage
14
No building hereby permitted shall be occupied until the drainage scheme for the site has been completed in accordance with the submitted details shown on AES-0590-126 rev 2. The sustainable drainage scheme shall be designed, managed and maintained in accordance with the Non-statutory technical standards and local standards.
Reason
To ensure the site can be appropriately drained.
Land Contamination
15
Prior to above ground works commencing and post site clearance of all fly tipped waste, a targeted Phase II Intrusive Site Investigation should be undertaken to assess the geotechnical and geo-environmental conditions at the site. The investigation and subsequent risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority.
The above works shall be conducted in line with guidance document ‘Land Contamination Risk Management’ (October 2020) and predecessor guidance ‘Model Procedures for the Management of Land Contamination, CLR 11 (Environment Agency, 2004) and BS10175:2011+A2 2017 (BSI, 2017).
Reason
To ensure the safe occupation of the site.
16
Prior to above ground works commencing and subject to the findings of condition 15, a Remediation Method Statement shall be provided and approved by this Local Authority prior to any remediation works commencing on site. The approved Remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The Local Authority must be given two weeks written notification of commencement of the remediation scheme works.
Reason
To ensure the safe occupation of the site.
17
If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement.
Reason
To ensure the safe occupation of the site.
18
If subsoil/topsoil is required to be imported to site for gardens and areas of soft landscaping, then these soils will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination.
Reason
To ensure the safe occupation of the site.
19
Following completion of any remedial/mitigation works a Validation Report should be forwarded to the Local Authority for review and comment. The Validation Report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the validation report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all validation data has been approved by the Local Authority.
Reason
To ensure the safe occupation of the site.
Landscapes
20
Before the development is brought into use, the approved Landscape scheme as indicated on Dwg No AES-0590-125 rev 3 shall be implemented in accordance with RMBC Landscape Design Guide (April 2014) in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season.
Reason
To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity.
21
Any plants or trees which within a period of 5 years from completion of planting die, are removed or damaged, or that fail to thrive shall be replaced. Assessment of requirements for replacement planting shall be carried out on an annual basis in September of each year and any defective work or materials discovered shall be rectified before 31st December of that year.
Reason
To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity.
Informative(s)
01
Biodiversity Net Gain
Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days).
Biodiversity Gain Plan
The biodiversity gain plan must include/accompanied by:
(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat;
(b) the pre-development biodiversity value of the onsite habitat;
(c) the post-development biodiversity value of the onsite habitat;
(d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development;
(e) any biodiversity credits purchased for the development;
(f) any information relating to irreplaceable habitat making up onsite habitat
(g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline.
(h) any additional information requirements stipulated by the secretary of state.
The effect of section 73D of the Town and Country Planning Act 1990
If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted.
Those circumstances are that the conditions subject to which the section 73 permission is granted:
1. do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and
2. in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
- Listed exemptions from Statutory BNG and transitional arrangements can be found at Biodiversity net gain: exempt developments - GOV.UK (www.gov.uk)
- The Statutory Biodiversity Gain Plan template can be found at https://www.gov.uk/government/publications/biodiversity-gain-plan
- Minimum legal requirements for the Biodiversity Gain plan can be found at https://www.legislation.gov.uk/ukpga/2021/30/schedule/14#:~:text=paragraph%2015).-,Biodiversity%20gain%20plan,-14
- Irreplaceable habitats for the purposed of Biodiversity Net Gain are defined by Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024. A full list of irreplaceable habitats can be found at https://www.legislation.gov.uk/uksi/2024/48/schedule/made
- Additional information required is outlined by Articles 37C(2) [Non Phased] 37C(4) [Phased] of The Town and Country Planning (Development Management Procedure) (England) Order 2015 and may be subject to the nature of your application https://www.legislation.gov.uk/uksi/2015/595#:~:text=Additional%20content%20of%20plan
- Where a Habitat Management and Monitoring Plan is required: https://publications.naturalengland.org.uk/publication/5813530037846016
02
You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway.
03
Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted.
Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged.
04
There is an existing lighting column on the site frontage. Should the proposed formation of any of the proposed driveways affect this lighting column, then contact should be made with Rotherham MBC’s Streetpride Department in order for arrangements to be agreed to relocate the lighting column at the applicant’s expense.
05
There is an existing radius vehicle access crossing and a dropped kerb crossing within the red line boundary along the site frontage. Should these accesses not form part of the proposed vehicle accesses to dwellings (the radius layout appears not to), then these should be closed and reinstated to footway, as part of the proposals.
06
The South Yorkshire Police Designing Out Crime Officer recommends that the development is designed and built to Secured by Design. The following are recommended in the build out of the scheme:
Defensible Space
Each dwelling should have a front boundary to a height of one metre to allow for visible surveillance into and from the dwellings in question.
Boundary Treatment
All rear gardens should be secured with a min 1.8m high fence. A 1.8m lockable gate should be fitted as close the front boundary line as possible to secure the rear of the dwellings.
Surveillance
Any landscaping and front boundaries should be kept low at no more than one metre high and any trees to have no foliage below 2m to aid natural surveillance. Positioning of trees should be careful not to mask any Lighting Column’s.
Lighting
All external paths and car parking areas should be well lit with an LED lighting scheme to standard BS5489 with no dark areas. All front and rear doors should be lit with a wall mounted luminaire to provide lighting in line with standard BS5489 which should operate on a dusk to dawn sensor and spread the light downward.
Security of Dwellings
In line with SBD standards, all front / rear doors and ground floor windows should comply with PAS 24:2022.
POSITIVE AND PROACTIVE STATEMENT
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|