Conditions / Reason for Refusal: |
01
a. Application for approval of reserved matters must be made within three years of the date of this permission.
b. The development hereby approved must be begun not later than whichever is the later of the following dates:
I. The expiration of five years from the date of this permission; OR
II. The expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
Before the commencement of the development, details of the scale, appearance and landscaping of the site shall be submitted to and approved by the Local Planning Authority and the development shall be carried out in accordance with the approved details.
Reason
No details of the matters referred to having been submitted, they are reserved for the subsequent approval of the Local Planning Authority.
03
No development above ground level shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples.
Reason
To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design.
04
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity and in accordance with Local Plan Policy..
05
Before the development is brought into use the sight lines indicated on the submitted plan shall be rendered effective by removing or reducing the height of anything existing on the land between the sight line and the highway which obstructs visibility at any height greater than 600mm above the level of the adjacent footway and the visibility thus provided shall be maintained.
Reason
In the interest of highway safety.
06
The reserved matters application to be submitted in accordance with this outline permission shall include a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall include hedgehog holes to allow wildlife to pass through. The approved boundary treatment shall be completed before the dwelling is occupied.
Reason
In the interests of neighbouring amenity.
07
Prior to the occupation of the dwelling, details of one vehicle charging point shall be
submitted to and approved by the Local Planning Authority. The dwelling shall not be
occupied until the charging point has been provided, and shall thereafter be retained.
Reason
In the interests of sustainable development and air quality.
08
The existing mature perimeter hedge (except for the access point) shall be retained as part of the reserved matters landscaping plan and shall be retained in perpetuity.
Reason
In the interest of the character of the area and biodiversity.
09
No tree shall be cut down, uprooted or destroyed nor shall any tree be pruned other than in accordance with the approved plans and particulars, without the written approval of the Local Planning Authority. Any pruning works approved shall be carried out in accordance with British Standard 3998 (Tree Work). If any tree is removed, uprooted or destroyed or dies, another tree shall be planted in the immediate area and that tree shall be of such size and species, and shall be planted at such time, as may be specified in writing by the Local Planning Authority.
Reason
In the interests of the visual amenities of the area.
10
No work or storage on the site shall commence until all the trees/shrubs to be retained have been protected by the erection of a strong durable 2 metre high barrier fence in accordance with BS 5837:2012 Trees in Relation to Design, Demolition and Construction - Recommendations This shall be positioned in accordance with the AWA Arboricultural Method Statement. The protective fencing shall be properly maintained and shall not be removed without the written approval of the Local Planning Authority until the development is completed. There shall be no alterations in ground levels, fires, use of plant, storage, mixing or stockpiling of materials within the fenced areas.
Reason
To ensure the trees/shrubs are protected during the construction of the development
11.
No removal of hedgerows, trees, shrubs, brambles, ivy or works to or demolition of
buildings or structures that may be used by breeding birds shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority.
Reason
In the interest of on site ecology.
12
Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure
iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken.
iv. When the features or measures will be installed within the construction, occupation, or phase of the development.
Reason
To encourage biodiversity net gain.
Informative
01
Biodiversity Net Gain
The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition (the biodiversity gain condition) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
This permission will require the submission and approval of a Biodiversity Gain Plan before development is begun.
For guidance on the contents of the Biodiversity Gain Plan that must be submitted and agreed by the Council prior to the commencement of the consented development please see the link: Submit a biodiversity gain plan - GOV.UK
(www.gov.uk)
Positive and Proactive Statement
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework
|