Planning Application Number: RB2024/0725
Site Address: New York Bakery Ltd Meadow Way Swinton 9999
Description: Erection of industrial storage building (Use Class B8)
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 13 August 2024
Decision Date: 13 August 2024
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below) (Drawing numbers location plan 24025-SDA-V1-ZZ-DR-A-101, block plan 24025-SDA-V1-ZZ-DR-A-1001, elevations and floorplans 24025-SDA-V1-ZZ-DR-A-1001_L2, swept path 24-199-A1-010)(received 20.05.24). Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing nos elevations 24025-SDA-V1-ZZ-DR-A-1001_L2. The development shall thereafter be carried out in accordance with these details. Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with Core Strategy CS28 ‘Sustainable Design. Yorkshire Water 04 The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed. Reason In the interest of satisfactory and sustainable drainage. 05 There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change. Reason To ensure that no surface water discharges take place until proper provision has been made for its disposal and in the interest of sustainable drainage. Informatives Yorkshire Water 1.) The developer is proposing to discharge surface water to public sewer however, sustainable development requires appropriate surface water disposal. a.) Yorkshire Water promote the surface water disposal hierarchy and the developer must provide evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical before considering disposal to public sewer. b.) The developer and LPA are strongly advised to seek comments on surface water disposal from other drainage bodies as further restrictions may be imposed. c.) As a last resort, and upon receipt of satisfactory evidence to confirm the reasons for rejection of other methods of surface water disposal, curtilage surface water may discharge to public water sewer. Surface water discharges to the public sewer must have a minimum of 30% reduction based on the existing peak discharge rate during a 1 in 1 year storm event. d.) The developer will be required to provide evidence of existing positive drainage to a public sewer from the site to the satisfaction of Yorkshire Water and the Local Planning Authority by means of physical investigation. On-site attenuation, taking into account climate change, will be required before any discharge to the public sewer network is permitted. Network Rail The applicant is reminded to keep any accesses to the nearby rail network open for maintenance purposes. Positive and Proactive Statement The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen