Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2023/1484
Site Address: The Spinney Salt Hill Firbeck 9999
Description: Increase in roof height to create rooms in roof space with dormer windows to front
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 19 December 2023
Decision Date: 19 December 2023
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 04 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 04 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans. Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and as detailed on the submitted application form. Reason In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28. 04 No operations (including initial site clearance) shall commence on site in connection with development hereby approved until a suitable scheme (Arboricultural Method Statement) for the protection of existing trees has been submitted and its installation on site has been approved in writing by the Local Planning Authority. All protection measures must fully detail each phase of the development process taking into account demolition/site clearance works, all construction works and hard and soft landscaping works. Details shall include the following: • Full survey of all trees on site and those within influencing distance on adjacent sites in accordance with BS5837*, with tree works proposals. All trees must be plotted on a scaled site plan**, clearly and accurately depicting trunk locations, root protection areas and canopy spreads. • A plan** detailing all trees and hedgerows planned for retention and removal. • A schedule of tree works for all the retained trees and hedges specifying pruning and other remedial or preventative work, whether for physiological, hazard abatement, aesthetic or operational reasons. All tree works shall be carried out in accordance with BS 3998. • Timing and phasing of works • Site specific demolition and hard surface removal specifications • Site specific construction specifications (e.g. in connection with foundations, bridging, water features, surfacing) • Access arrangements and car parking • A Tree Protection Plan** in accordance with BS5837* detailing all methods of protection, including but not restricted to: locations of construction exclusion zones, root protection areas, fit for purpose fencing and ground protection, service routes, works access space, material/machinery/waste storage and permanent & temporary hard surfaces. All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. *Using the most recent revision the of the Standard ** Plans must be of a minimum scale of 1:200 (unless otherwise agreed by the Local Planning Authority) Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change in accordance with Rotherham’s Core Strategy Policies CS3: Location of New Development, CS19: Green Infrastructure, CS20 Biodiversity and Geodiversity, Policy CS21 Landscape, Policy CS28 Sustainable Design. Positive and Proactive Statement Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen