Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2023/1451
Site Address: Thrybergh Country Park Doncaster Road Thrybergh 9999
Description: Erection of detached modular building
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 14 December 2023
Decision Date: 14 December 2023
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 03 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 03 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans Reason To define the permission and for the avoidance of doubt. 03 The development hereby granted shall not be begun until details of the foul & surface water and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development. Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan. 04 Unless otherwise approved in writing by the Local Planning Authority, there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works. Reason To ensure that no foul or surface water discharge take place until proper provision has been made for their disposal in accordance with CS24 of the Local Plan. 05 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/. The development shall thereafter be carried out in accordance with these details. Reason In order to ensure a satisfactory appearance in the interests of visual amenity. 06 The following activities must not be carried out under any circumstances. a. No fires to be lit on site within 10 metres of the nearest point of the canopy of any retained tree/hedgerow on or adjacent to the proposal site. b. No equipment, signage, fencing etc shall be attached to or be supported by any retained tree on or adjacent to the application site, c. No temporary vehicle access within designated root protection areas d. No mixing of cement or dispensing of fuels or chemicals within 10 metres of any retained tree/hedgerow on or adjacent to the application site. e. No soak- aways to be routed within the root protection areas of any retained tree/hedgerow on or adjacent to the application site. f. No mechanical excavations within the root protection areas of any retained tree/hedgerow on or adjacent to the application site. g. No topsoil, building materials or other to be stored within the root protection areas of any retained tree/hedgerow on or adjacent to the application site. Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change in accordance with Rotherham’s Core Strategy Policies CS3: Location of New Development, CS19: Green Infrastructure, CS20 Biodiversity and Geodiversity, Policy CS21 Landscape, Policy CS28 Sustainable Design. Informatives 01 In order to discharge Condition 3 & 4 (drainage details), the applicant is advised that they would be expected to submit information including but not limited to the following: Surface water drainage plans should include the following: ? Rainwater pipes, gullies and drainage channels including cover levels. ? Inspection chambers, manholes and silt traps including cover and invert levels. ? Pipe sizes, pipe materials, gradients and flow directions. ? Soakaways, including size and material. ? Typical inspection chamber / soakaway / silt trap and SW attenuation details. ? Site ground levels and finished floor levels. Surface Water Discharge From Brownfield Site: There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased. A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off rate. On Site Surface Water Management: The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land. The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated. Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway. Guidance on flood pathways can be found in BS EN 75 Positive and Proactive Statement Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen