Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2023/1364
Site Address: land at Churchill Avenue/ Greenland Avenue Maltby 9999
Description: Demolition of dwellings and outline application for the erection of 15 dwellings including details of access, appearance, layout & scale
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 03 November 2025
Decision Date: 03 November 2025
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Committee
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 13, 17 and 27 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 13, 17 and 27 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ General 01 a. Application for approval of reserved matters must be made within one year of the date of this permission. b. The development hereby approved must be begun not later than whichever is the later of the following dates: (i) The expiration of two years from the date of this permission; OR (ii) The expiration of one year from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 Before the commencement of the development (including demolition), details of the landscaping of the site shall be submitted to and approved by the Local Planning Authority and the development shall be carried out in accordance with the approved details. Reason No details of the matters referred to having been submitted, they are reserved for the subsequent approval of the Local Planning Authority. 03 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) and in accordance with all approved documents. b/21/02 – Semi-detached House Type b/21/03 – Terraced House Type (Plots 1,2,3 and 9,10,11) b/24/01 Rev C – Location Plan and Proposed Site Plan b/24/04 – Terraced House Type (Plots 4,5,6) Reason To define the permission and for the avoidance of doubt. 04 Prior to construction works commencing above ground level, details of the materials to be used in the construction of the external surfaces of each phase of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples. Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity. Construction Management 05 Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided. Reason To safeguard the amenities of the occupiers of nearby properties. 06 All machinery and vehicles employed on the site shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in British Standard 5228 Code of Practice: 'Noise Control on Construction and Open Sites’. Reason To safeguard the amenities of the occupiers of nearby properties. 07 At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. Reason To safeguard the amenities of the occupiers of nearby properties. 08 Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. Reason To safeguard the amenities of the occupiers of nearby properties. Highways 09 Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either; a/ a permeable surface and associated water retention/collection drainage, or; b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity. 10 Prior to construction works commencing above ground level, a scheme shall be submitted to and approved in writing by the Local Planning Authority detailing how the use of sustainable/public transport will be encouraged. The agreed details shall be implemented in accordance with a timescale to be agreed by the Local Planning Authority. Reason In order to promote sustainable transport choices. 11 Prior to construction works commencing above ground level, a scheme detailing the dedicated facilities that will be provided for charging electric vehicles and other ultra-low emission vehicles for the application site. The scheme shall meet the following minimum standard for numbers and power output: • A Standard Electric Vehicle Charging point providing a continuous supply of at least 16A (3.5kW) for each residential unit that has a dedicated parking space Buildings and parking spaces that are to be provided with charging points shall not be brought into use until the charging points are installed and operational. Charging points installed shall be retained thereafter. Reason In the interests of sustainable development and air quality. Landscapes 12 The first reserved matters application shall include a detailed landscape scheme for the POS areas and plot landscaping. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary: • The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove. • The extent of any changes to existing ground levels, where these are proposed. • Any constraints in the form of existing or proposed site services, or visibility requirements. • Areas of structural and ornamental planting that are to be carried out. • The positions, design, materials and type of any boundary treatment to be erected. • A planting plan and schedule detailing the proposed species, siting, quality and size specification, and planting distances. • A written specification for ground preparation and soft landscape works. • The programme for implementation. • Written details of the responsibility for maintenance and a schedule of operations, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme. The scheme shall thereafter be implemented in accordance with the approved landscape scheme and maintained for the lifetime of the development in accordance with the appropriate standards and codes of practice within a timescale agreed, in writing, by the Local Planning Authority. Reason To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity. Trees 13 No operations (including initial site clearance) shall commence on site in connection with development hereby approved until a suitable scheme (Arboricultural Method Statement) for the protection of existing hedgerows has been submitted and its installation on site has been approved in writing by the Local Planning Authority. All protection measures must fully detail each phase of the development process taking into account demolition/site clearance works, all construction works and hard and soft landscaping works. Details shall include the following: • Full survey of all trees on site and those within influencing distance on adjacent sites in accordance with BS5837*, with tree works proposals. All trees must be plotted on a scaled site plan**, clearly and accurately depicting trunk locations, root protection areas and canopy spreads. (Provided) • A plan** detailing all trees and hedgerows planned for retention and removal. (Provided) • A schedule of tree works for all the retained trees and hedges specifying pruning and other remedial or preventative work, whether for physiological, hazard abatement, aesthetic or operational reasons. All tree works shall be carried out in accordance with BS 3998. • Timing and phasing of works • Site specific demolition and hard surface removal specifications • Site specific construction specifications (e.g. in connection with foundations, bridging, water features, surfacing) • Access arrangements and car parking • Level changes • A Tree/Hedge protection plan** in accordance with BS5837* detailing all methods of protection, including but not restricted to: locations of construction exclusion zones, root protection areas, fit for purpose fencing and ground protection, service routes, works access space, material/machinery/waste storage and permanent & temporary hard surfaces. • Soil remediation plans, where unauthorised access has damaged root protection areas in the construction exclusion zones. • Details of the arboricultural supervision schedule. All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. *Using the most recent revision the of the Standard ** Plans must be of a minimum scale of 1:200 (unless otherwise agreed by the Local Planning Authority) Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change. 14 A suitable scheme of proposed tree planting and pits shall be submitted to and approved by the Local Planning Authority prior to the first use of the development hereby approved. No operations shall commence above ground level until a suitable scheme of proposed tree planting and tree pits have been submitted to and approved by the Local Planning Authority. The scheme shall include the following comprehensive details of all trees to be planted: • A scaled plan showing the locations of the new trees (existing trees must also be shown) • The species and stock size. • Include details confirming the planting intended to mitigate the tree losses detailed in the AIA. • An assessment of suitability of planting location • Actions taken to mitigate any foreseeable issues i.e. the use of root barriers/deflectors, flexi-paving, appropriate species selection, structured soils, foundations, etc. • Proposals should be in accordance with British Standard 8545:2014 - Trees: from Nursery to Independence. • Five year post planting maintenance and inspection schedule. Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change. Drainage 15 Construction works shall not commence above ground level until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development. Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin. Waste Management Plan 16 Prior to the development being first occupied a Waste Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan will need to include: • information on the amount and type of waste that will be generated from the site; • measures to reduce, re-use and recycle waste within the development, including the provision of on-site separation and treatment facilities (using fixed or mobile plants where appropriate); • an assessment of the potential to re-use or adapt existing buildings on the site (if demolished it must explain why it is not possible to retain them); • design and layouts that allow effective sorting and storing of recyclables and recycling and composting of waste and facilitate waste collection operations during the lifetime of the development; • measures to minimise the use of raw materials and minimise pollution of any waste; • details on how residual waste will be disposed in an environmentally responsible manner and transported during the construction process and beyond; • construction and design measures that minimise the use of raw materials and encourage the re-use of recycled or secondary resources (particularly building materials) and also ensure maximum waste recovery once the development is completed; and • details on how the development will be monitored following its completion. The agreed details shall be implemented and thereafter maintained. Reason To minimise the amount of waste used during the construction and lifetime of the project and to encourage the re-use and recycling of waste materials on site. Local Labour Agreement 17 Prior to the commencement of works (including demolition), a Local Labour Agreement relating to the demolition and construction phase of the development shall be submitted to and approved in writing by the Local Planning Authority. The scope of the Agreement shall be agreed in writing prior to submission of the formal document. The development shall thereafter be carried out in accordance with the approved Agreement. Reason To improve skills in all of Rotherham’s communities through the promotion of access to training, education and local employment opportunities. Land Contamination 18 Post demolition of existing structures and prior to above ground works commencing, a Phase II Intrusive Site Investigation should be undertaken to assess potential geotechnical issues and the geo-environmental conditions at the site to confirm the nature, presence and extent of potential contamination across the site and the risk it presents to human health. The investigation and subsequent risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The above works shall be conducted in line with guidance document ‘Land Contamination Risk Management’ (October 2020) and predecessor guidance ‘Model Procedures for the Management of Land Contamination, CLR 11 (Environment Agency, 2004) and BS10175:2011+A2 2017 (BSI, 2017) Reason To ensure the safe occupation of the site. 19 Prior to construction works commencing above ground level and subject to the findings of condition 18 a Remediation Method Statement shall be provided and approved by this Local Authority prior to any remediation works commencing on site. The approved Remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The Local Authority must be given two weeks written notification of commencement of the remediation scheme works. Reason To ensure the safe occupation of the site. 20 If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. Reason To ensure the safe occupation of the site. 21 If subsoil/topsoil is required to be imported to site for gardens and areas of soft landscaping, then these soils will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination. Reason To ensure the safe occupation of the site. 22 Following completion of any remedial/mitigation works a Validation Report should be forwarded to the Local Authority for review and comment. The Validation Report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the validation report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all validation data has been approved by the Local Authority. Reason To ensure the safe occupation of the site. Ecology 23 No removal of hedgerows, trees or shrubs shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority. Reason In order not to disturb any bats or birds and to make adequate provision for species protected by the Wildlife & Countryside Act 1981. 24 The development shall be completed in accordance with the recommendations in the submitted Construction Environmental Management Plan (ref: SQ-2321), dated 10th September 2024, prepared by Estrada Ecology. All the recommendations shall be implemented in full during the construction phase and thereafter permanently retained. Reason In the interests of biodiversity and ecology. 25 The development hereby approved shall be completed in accordance with the recommendations in the submitted Biodiversity Enhancement Plan (ref: SQ-2321.1), dated 21st August 2024, prepared by Estrada Ecology. All the recommendations shall be implemented prior to the first dwelling being occupied and shall thereafter be permanently retained. Reason In the interests of biodiversity and ecology. 26 The first reserved matters application shall include details of the planting at Site B and Site D as outlined in paragraph 8.3 of the Biodiversity Net Gain Report (ref: SQ-2321), dated 17th October 2024, prepared by Estrada Ecology. Reason To ensure there is no net loss of Biodiversity from the development. Demolition 27 Prior to any demolition works commencing a Demolition Method Statement shall be submitted to and approved in writing by the Local Planning Authority which includes details on the proposed method of demolition, the length of time the demolition will take, how rubble / materials will be removed from the site or reused in the development of the site. The demolition shall thereafter take place in accordance with the approved details. Reason In order to encourage the redevelopment of this site and in the interests of the visual amenity of the area. Informative(s) 01 You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway. 02 It is recommended that the scheme should be built to Secured by Design standards (www.securedbydesign.co.uk) 03 In the unlikely event that great crested newts are recorded on-site then all works must cease with immediate effect and Natural England must be consulted via a suitably qualified ecologist to obtain a licence to facilitate the works. 04 This development is not subject to the statutory Biodiversity Gain Plan condition because the planning application was submitted before the statutory requirement for applications. 05 If any tree losses are unavoidable, then the Tree Service will require a CAVAT evaluation of the trees to be removed with a sufficient tree planting mitigation plan to compensate for their loss (equal to the CAVAT evaluation). 06 The planning permission is subject to a Legal Agreement (Obligation) under Section 106 of the Town and Country Planning Act 1990. The S106 Agreement is legally binding and is registered as a Local Land Charge. It is normally enforceable against the people entering into the agreement and any subsequent owner of the site. POSITIVE AND PROACTIVE STATEMENT The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen