| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
• (Drawing number EC-60-10 Rev B – Amended Existing & Proposed Site/Location Plan)(received 8 November 2023)
• (Drawing number EC-60-15 Rev A – Amended Fencing Plan)(received 8 November 2023)
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those as detailed on the submitted application form and drawings.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
04
The tennis court area and facilities shall be ancillary to the host property only.
Reason
To ensure the provision of satisfactory garage/parking space and avoid the necessity for the parking of vehicles on the highway in the interests of road safety.
05
The submitted Arboricultural Method Statement includes ‘Appendix 3: Record of Arboricultural Supervision' as such, evidence shall be submitted to the Local Planning Authority to show that the development is being carried out in accordance with the approved Arboricultural Report with Tree Protection Plan.
This could include a written record of the project arboriculturist site visits or a set of photos of the detailed tree protection fencing in place throughout the duration of the development.
Reason
To ensure the trees/shrubs are protected during the construction of the development protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change in accordance with Sites & Policies SP32 ‘Green Infrastructure and Landscape’, SP33 Conserving and Enhancing the Natural Environment’ and Core Strategy CS3 ‘Location of New Development’, CS19 ‘Green Infrastructure’, CS20 ‘Biodiversity & Geodiversity, CS21 ‘Landscape’ and CS28 ‘Sustainable Design’.
Positive and Proactive Statement
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
|