| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
Amended Plot 1 site plan P1-04 A
Amended Plot 2 site plan P2-03 B
Floor plans and elevations P2-01
Reason
To define the permission and for the avoidance of doubt.
03
The new dwelling shall not be occupied until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before the dwelling is occupied.
Reason
In the interests of neighbouring and visual amenity
04
Notwithstanding the provisions of Schedule 2, Part 1, Classes A, B, C, D and E of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking, re-enacting or amending that Order with or without modification) there shall be no further extensions to residential accommodation hereby permitted or the host property, and no outbuildings shall be constructed within their curtilage.
Reason
The host property has been significantly extended and further extensions and outbuildings could have a significant detrimental impact on the openness of the Green Belt.
05
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
06
Prior to the occupation of the dwelling hereby approved, details of one vehicle charging point shall be submitted to and approved by the Local Planning Authority. The dwelling shall not be occupied until the charging point has been provided, and it shall thereafter be retained.
Reason
In the interests of sustainable development and air quality
POSITIVE AND PROACTIVE STATEMENT
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework
|