| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
(Drawing numbers, 771 005 149 – 100/002/210)(received 27/04/2023)
Reason
To define the permission and for the avoidance of doubt.
02
That part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
03
The development shall not be brought into use until Biodiversity Enhancement & Management Plans (BEMPs) for the site have been submitted to and approved in writing by the Local Planning Authority. The Plans shall provide a:
a) Description and evaluation of features to be managed and enhanced, including:
I. Description of new landscape planting incorporating native plant species
b) Extent and location/area of proposed enhancement works on appropriate scale maps and plans;
c) Aims and Objectives of management;
d) Appropriate Management Actions for achieving Aims and Objectives;
e) An annual work programme (to cover an initial 5 year period);
For each of the first 5 years of the Plans, a progress report shall be sent to the Local Planning Authority reporting on progress of the annual work programme and confirmation of required Actions for the next 12 month period.
The Plans shall be reviewed and updated every 5 years to ensure their aims and objectives are being met. The approved Plans will be implemented in accordance with the approved details.
The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme
Reason
To ensure no net loss in biodiversity across the sites in accordance with Policy SP33 Conserving and Enhancing the Natural Environment.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|