Planning Application Number: RB2023/0571
Site Address: 23 Coquet Avenue Bramley 0023
Description: Single storey side and rear extension
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 11 August 2023
Decision Date: 11 August 2023
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) Drawing – Proposed Planning Drawing – ref – 23014-S11-BD-ZZ-DR-A-PL04-P03 – Received – 07/06/2023 Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building. Reason In order to ensure a satisfactory appearance in the interests of visual amenity. 04 No operations (including initial site clearance) shall commence on site in connection with development hereby approved until a suitable scheme (Arboricultural Method Statement) for the protection of existing trees has been submitted and its installation on site has been approved in writing by the Local Planning Authority. All protection measures must fully detail each phase of the development process taking into account demolition/site clearance works, all construction works and hard and soft landscaping works. Details shall include the following: • Full survey of all trees on site and those within influencing distance on adjacent sites in accordance with BS5837*, with tree works proposals. All trees must be plotted on a scaled site plan**, clearly and accurately depicting trunk locations, root protection areas and canopy spreads. • A plan** detailing all trees planned for retention and removal. • A schedule of tree works for all the retained trees specifying pruning and other remedial or preventative work, whether for physiological, hazard abatement, aesthetic or operational reasons. All tree works shall be carried out in accordance with BS 3998. • Timing and phasing of works • Site specific demolition and hard surface removal specifications • Site specific construction specifications (e.g. in connection with foundations, bridging, water features, surfacing) • Access arrangements and car parking • Level changes • Tree protection plan** in accordance with BS5837* detailing all methods of protection, including but not restricted to: locations of construction exclusion zones, root protection areas, fit for purpose fencing and ground protection, service routes, works access space, material/machinery/waste storage and permanent & temporary hard surfaces. All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. *Using the most recent revision the of the Standard ** Plans must be of a minimum scale of 1:200 (unless otherwise agreed by the Local Planning Authority) Reason: To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change in accordance with Rotherham’s Core Strategy Policies CS3: Location of New Development, CS19: Green Infrastructure, CS20 Biodiversity and Geodiversity, Policy CS21 Landscape, Policy CS28 Sustainable Design. 05 Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either; a/ a permeable surface and associated water retention/collection drainage, or; b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety. Positive and Proactive Statement During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen