| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans
Reason
To define the permission and for the avoidance of doubt.
03
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
04
No dwelling shall be occupied until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the design, materials and type of boundary treatment to be erected. The boundary treatment as approved shall be completed before the first dwelling is occupied and shall thereafter be retained and maintained.
Reason
In the interests of the visual amenity of the area.
05
Prior to the occupation of the new dwelling, one vehicle charging point shall be provided as per the approved drawings. The dwelling shall not be occupied until the charging point has been provided and shall thereafter be retained.
Reason
In the interests of sustainable development and air quality in accordance with the Local Plan and the NPPF.
06
Notwithstanding the provisions of Schedule 2, Part 1, Class A, B, and E of the Town and Country Planning (General Permitted Development) Order 2015, as amended, no extensions or outbuildings at either the original or newly formed dwellings hereby approved shall be carried out without the prior permission of the Local Planning Authority.
Reasons
In order that future extensions/outbuildings can be controlled in the interests of the openness of the Green Belt.
Informatives
01
The four South Yorkshire Authorities have committed to ensuring that relevant developments are provided with Gigabit-capable full fibre broadband. Please refer to the attached informative in this respect.
POSITIVE AND PROACTIVE STATEMENT
Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.
|