| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three
years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the
approved location plan and the development shall only take place in accordance with
the submitted details and specifications and as shown on the approved plans -
• Location Plan WWFS-TTE-00-XX-DR-C-0010-P02
• Swale 1 and 2 General Arrangement Plan WWFS-TTE-00-XX-DR-C-0100-P04
• Swale 1 and 2 Setting Out Plan WWFS-TTE-00-XX-DR-C-0110-P03
• Swale 1 and 2 Contour Plan WWFS-TTE-00-XX-DR-C-0120-P03
• Swale 1 Signage and Lifebouys Plan WWFS-TTE-00-XX-DR-C-0140-P0
• Swale Details Sheet 1 of 2 WWFS-TTE-00-XX-DR-C-0200-P03
• Swale Details Sheet 2 of 2 WWFS-TTE-00-XX-DR-C-0201-P03
• Proposed Swale 1 and 2 Long Sections WWFS-TTE-00-XX-DR-C-0420-P03
• Proposed Swale 1 and 2 Cross Scetiond WWFS-TTE-00-XX-DR-C-0400-P03
Reason
To define the permission and for the avoidance of doubt.
03
Prior to any planting taking place on site a detailed landscape scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary:
- The extent of existing planting, including those trees or areas of vegetation
that are to be retained, and those that it is proposed to remove.
- The extent of any changes to existing ground levels, where these are
proposed.
- Any constraints in the form of existing or proposed site services, or visibility
requirements.
- Areas of structural and ornamental planting that are to be carried out.
- The positions, design, materials and type of any boundary treatment to be
erected.
- A planting plan and schedule detailing the proposed species, siting, quality
and size specification, and planting distances.
- A written specification for ground preparation and soft landscape works.
- The programme for implementation.
- Written details of the responsibility for maintenance and a schedule of
operations for the lifetime of the development, including replacement planting,
that will be carried out for a period of 5 years after completion of the planting
scheme
Reason
To ensure that there is a well laid out scheme for healthy hedgerows in the interests of amenity and in accordance with Local Plan policy.
POSITIVE AND PROACTIVE STATEMENT
The applicant and the Local Planning Authority engaged in pre application discussions
to consider the development before the submission of the planning application. The
application was submitted on the basis of these discussions, or was amended to
accord with them. It was considered to be in accordance with the principles of the
National Planning Policy Framework
|