Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2022/0002
Site Address: West Melton Electricity Substation Elsecar Road Brampton Bierlow 9999
Description: Extension to Electricity Substation including raising of land levels with installation of new plant and equipment and fencing along with a new temporary access
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 03 August 2022
Decision Date: 03 August 2022
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) (Drawing number revised layout plan WM-P-003 Rev 01, site plan WM-P-008 Rev 00, elevations WM-P-006 Rev 00 and 01)(received 07/01/22, 11/02/22). Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details shown on elevations (ref elevations WM-P-006 Rev 00 and 01). The development shall thereafter be carried out in accordance with these details. Reason In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28. 04 Before above ground development is commenced, a final vehicular access plan shall be submitted to the local authority and approved in writing. This shall include a vehicular turning space to be provided within the site curtilage demonstrating the swept path movement of the largest vehicle expected to use the site and the development shall not be brought into use until such turning space has been provided. Reason In the interests of road safety. 05 Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety. 06 Prior to the construction and formation of the access road hereby approved details or samples of the materials to be used in its construction shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples. Reason In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design. 07 No part of the land other than that occupied by buildings shall be used for the storage of goods, components, parts, waste materials or equipment without the prior written approval of the Local Planning Authority. Reason To prevent the land from becoming unsightly in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design. 08 Before the development is brought into use, a Landscape scheme, showing buffer planting which clearly details the species specification and layout including appropriate ground preparation, planting and future maintenance/management shall be submitted for approval by the Local Planning Authority. The Landscape scheme should be prepared in accordance with RMBC landscape guidance document and shall be implemented in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season. Reason To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity and in accordance with Local Plan policy. Informative Hours of construction 01 Except in case of emergency, operations should not take place on site other than between the hours of 08:00 - 18:00 Monday to Friday and between 09:00 - 13:00 on Saturdays. There should be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Local Planning Authority should be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided. Positive and Proactive Statement During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.