Planning Application Number: RB2021/0784
Site Address: Christie House Meadow Bank Road Meadwobank 9999
Description: Extension to existing workshop facility, installation of solar panels to existing roof, car park to be extended
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 16 September 2021
Decision Date: 21 September 2021
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Condition numbered 08 of this permission require matters to be approved before development works begin; however, in this instance the condition is justified because: 1. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. 2. The details required under condition number 08 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured. 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) (Drawing numbers Location plan S61-2226 Rev C 004, Site plan S61-2226 Rev B 002, block plan S61-2226 Rev E 004, elevations S61-2226 Rev C 005, roof plan S61-2226 Rev E 004)(received 08/06/21 and 28/07/21). Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing (elevations S61-2226 Rev C 005, site plan S61-2226 Rev A 004). The development shall thereafter be carried out in accordance with these details. Reason In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design. 04 Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either; a/ a permeable surface and associated water retention/collection drainage, or; b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site. The area shall thereafter be maintained in a working condition. Reason To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety. 05 Before the development is brought into use the car parking area shown on the submitted plan shall be provided, marked out and thereafter maintained for car parking. Reason To ensure the provision of satisfactory parking spaces and avoid the necessity for the parking of vehicles on the highway in the interests of road safety. Electric Vehicle Charging Points 06 Before the electrical system is installed a scheme detailing the dedicated facilities that will be provided for charging electric vehicles and other ultra-low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall meet at least the following minimum standard for numbers and power output: • One Standard Electric Vehicle Charging Point providing a continuous supply of at least 16A (3.5kW) for at least 10% of the development. Buildings and parking spaces that are to be provided with charging points shall not be brought into use until the charging points are installed and operational. Charging points installed shall be retained thereafter. Reason In the interest of supporting and encouraging low emission vehicles, in the interest of air quality enhancement, to comply with the aims and objectives Chapters 2, 9 and 15 of the National Planning Policy Framework. 07 In the event that contamination is discovered, all groundworks in the affected area (except for site investigation works) shall cease immediately and the Local Planning Authority shall be notified in writing within 2 working days. Groundworks in the affected area shall not recommence until either: (a) a Remediation Strategy by a suitably competent person has been submitted to and approved in writing by the Local Planning Authority or (b) the Local Planning Authority has confirmed in writing that remediation measures are not required. The Remediation Strategy shall include a timetable for the implementation and completion of the approved remediation measures. Thereafter remediation of the site shall be carried out and completed in accordance with the approved Remediation Strategy. Following completion of any measures identified in the approved Remediation Strategy a Validation Report shall be submitted to the Local Planning Authority. No part of the site shall be brought into use until such time as that part of the site has been remediated in accordance with the approved Remediation Strategy and a Validation Report in respect of those works has been approved in writing by the Local Planning Authority. Reason To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and paragraph nos. 178 and 179 of the National Planning Policy Framework. 08 Prior to commencement of development, a detailed landscape scheme incorporating an ecological survey of the existing site shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary: -The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove. -The extent of any changes to existing ground levels, where these are proposed. -Any constraints in the form of existing or proposed site services, or visibility requirements. -Areas of structural and ornamental planting that are to be carried out. -The positions, design, materials and type of any boundary treatment to be erected. -A planting plan and schedule detailing the proposed species, siting, quality and size specification, and planting distances. -A written specification for ground preparation and soft landscape works. -The programme for implementation. -Written details of the responsibility for maintenance and a schedule of operations, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme. - Any areas identified for Biodiversity Net Gain shall also be identified and included within the plan. The scheme shall thereafter be implemented in accordance with the approved landscape scheme within a timescale agreed, in writing, by the Local Planning Authority. Reason To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity and in accordance with the Local Plan. Positive and Proactive Statement Whilst the applicant did not enter into any formal pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework following the additional clarifications received from the applicant.