| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three
years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the
approved site plan and the development shall only take place in accordance with the
submitted details and specifications as shown on the approved plans (as set out
below)
((PL)003 GF, (PL)004 FF, (PL)005 Proposed Site Plan, (PL)008 Proposed Elevations (PL)009 Roof plan) (Received 18 June 2021)
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the approved plans. The development shall thereafter be carried out in accordance with these details.
Reason
To ensure that appropriate materials are used in the construction of the development
in the interests of visual amenity.
04
Notwithstanding the provisions of Schedule 2, Part 1, Classes A, B, C, D and E of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking, re-enacting or amending that Order with or without modification) there shall be no extensions to the residential accommodation hereby permitted or outbuildings constructed within its curtilage.
Reason
In the interest of the openness of the Green Belt
05
Before the development is brought into use, that part of the site to be used by vehicles
shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately
constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
06
Prior to completion of development details of bat roost features to be incorporated into the development shall be submitted to the Local Planning Authority for approval and shall thereafter be implemented in accordance with the agreed statement before the development is brought into use.
Reason
In the interests of the local ecology in accordance with advice in the NPPF.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|