| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
(Drawing numbers Location Plan/ JBA 3942 101/102.C/103.A)(Received 13/05/20210).
Reason
To define the permission and for the avoidance of doubt.
Design
03
The stone repairs to the exterior of the building shall be in accordance with those submitted on 22/07/2021 unless otherwise agreed in writing with the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples.
Reason
In the interest of visual amenity in accordance with SP41 ‘Conservation Areas.’
04
The windows shall be constructed of aluminum unless otherwise agreed in writing with the Local Planning Authority and shall be of a design specified in the submitted details received 22/07/2021. All windows and doors shall be set in reveals of a minimum depth of 150mm. The development shall be carried out in accordance with the approved details.
Reason
In the interest of visual amenity in accordance with SP41 ‘Conservation Areas.’
05
The door on the southern elevation shall be constructed of vertical timber boards with the timber lintel retained, unless otherwise agreed in writing with the Local Planning Authority.
Reason
In the interest of visual amenity in accordance with SP41 ‘Conservation Areas.’
06
All roof lights hereby approved on the building shall be conservation style unless otherwise agreed in writing with the Local Planning Authority.
Reason
In the interest of visual amenity in accordance with SP41 ‘Conservation Areas.’
07
The rainwater goods on the dwellings hereby approved shall be cast aluminum coloured black unless otherwise agreed in writing with the Local Planning Authority.
Reason
In the interest of visual amenity in accordance with SP41 ‘Conservation Areas.’
08
The dwellings hereby approved shall not be occupied until there has been submitted to and approved in writing by the Local Planning Authority a plan indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed before the dwellings are occupied.
Reason
In the interest of visual amenity in accordance with SP41 ‘Conservation Areas.’
09
Notwithstanding the provisions Schedule 2, Part 1, Classes A, B, C, D and E of the and Part 2 Class A of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re--enacting that Order with or without modification), no further extensions, external alterations including boundary treatment or outbuildings shall be undertaken [other than those expressly authorised by this permission] without the prior permission of the Local Planning Authority.
Reason
In the interest of visual amenity in accordance with SP41 ‘Conservation Areas.’
Highways
10
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
11
Prior to the occupation of the dwelling, details of vehicle charging points (minimum one point per dwelling) shall have been submitted to and approved by the Local Planning Authority. The development shall not be occupied until the charging points have been provided, and they shall thereafter be retained.
Reason
In the interests of sustainable development and air quality.
Informative
01 Gigabit Broadband
The dwelling hereby approved should include measures to facilitate the provision of gigabit-capable full fibre broadband. Please contact SFSY (Super Fast South Yorkshire) at hello@superfastsouthyorkshire.co.uk PO Box 634, Barnsley, South Yorkshire S70 9GG, 01226 772215 for further information in this respect.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|