| Conditions / Reason for Refusal: |
Conditions
01
The development hereby permitted shall be commenced before the expiration of
three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act
1990.
Pre Commencement Conditions
02
Prior to commencement of development a scheme for intrusive site investigations
shall be submitted to and approved in writing by the Local Planning Authority. The
undertaking of the approved scheme shall be carried out prior to commencement of
development and a report detailing the findings arising from the intrusive site
investigations and scheme of remedial works shall be submitted to and approved by
the Local Planning Authority prior to commencement of development. The approved
remedial works shall be implemented prior to commencement of development.
Reason
To establish the exact situation regarding coal mining legacy issues on the site and
to ensure the safety and stability of the proposed development.
03
Prior to commencement of development a Phase I Site Assessment Report
consisting of a desk top study, a site walkover, and a conceptual site model must be
undertaken to obtain an understanding of the sites history, its setting and its
potential to be affected by contamination. This report must be submitted to this
Local Authority for review and consideration. If further intrusive investigations are
recommended then these works must be undertaken in accordance with the
conclusions and recommendations detailed in the Desk Study Report.
The above should be conducted in accordance with DEFRA and the Environment
Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’
and Contaminated Land Science Reports (SR2 – 4).
Reason
To ensure that risks from land contamination to the future users of the land and
neighbouring land are minimised, together with those to controlled waters, property
and ecological systems, and to ensure that the development can be carried out
safely without unacceptable risks to workers, neighbours and other offsite receptors.
Other Conditions
04
The permission hereby granted shall relate to the area shown outlined in red on the
approved site plan and the development shall only take place in accordance with the
submitted details and specifications as shown on the approved plans (as set out
below)
Existing Site and Location Plan – Dwg No. 2324-001
Proposed Site and Location Plan – Dwg No.2324-002D
Proposed Elevations – Dwg No. 2324-003E
Proposed Floor Plans – Dwg No. 2324-004E
S/W Elevation and Boundary Treatment – Dwg No. 2324-007
N/E Site Section and Boundary Treatment – Dwg No. 2324-008A
S/W Elevation – Dwg No. 2324-009
Reason
To define the permission and for the avoidance of doubt.
05
The dwellings hereby approved shall not commence construction until details of the
materials to be used in the construction of the external surfaces of the development
hereby permitted have been submitted or samples of the materials have been left on
site, and the details/samples have been approved in writing by the Local Planning
Authority. The development shall thereafter be carried out in accordance with the
approved details/samples.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in
accordance with Core Strategy Policy CS28.
06
Before the development is brought into use, that part of the site to be used by
vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately
constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other
extraneous material is not deposited on the public highway and that each dwelling
can be reached conveniently from the footway in the interests of the adequate
drainage of the site, road safety and residential amenity.
07
Before the development is brought into use the car parking area shown on the
approved plan (drawing number 2324-002D) shall be provided, marked out and
thereafter maintained for car parking.
Reason
To ensure the provision of satisfactory garage/parking space and avoid the
necessity for the parking of vehicles on the highway in the interests of road safety.
08
Prior to the occupation of the first dwelling hereby approved, a scheme shall be
submitted to and approved in writing by the Local Planning Authority detailing how
the use of sustainable / public transport will be encouraged. The agreed details
shall be implemented in accordance with a timescale to be agreed by the Local
Planning Authority.
Reason
In order to promote sustainable transport choices.
09
The windows at first floor on the side elevation of Plot 1 and Plot 3 shall be
obscurely glazed and fitted with glass to a minimum industry standard of Level 3
obscured glazing and be non-openable, unless the part(s) of the window(s) which
can be opened are more than 1.7 metres above the floor of the room in which the
window is installed. The window(s) shall be permanently retained in that condition
thereafter.
Reason
In the interests of the amenities of the occupiers of adjoining properties.
10
Notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) Order 2015 (or any Order revoking and re-enacting that
Order with or without modification), no windows or openings other than those
expressly authorised by this permission shall be inserted into the side elevation of
Plots 1 and 3 hereby approved.
Reason
In the interests of the amenities of the occupiers of adjoining properties.
11
Notwithstanding the provisions of Schedule 2, Part 1, Classes A, B, C, D and E of
the Town and Country Planning (General Permitted Development) Order 2015 (or
any Order revoking and re-enacting that Order with or without modification), no
extensions to the properties, outbuildings to their gardens or additions / alterations
to the roofslopes shall be carried out without the prior permission of the local
planning authority.
Reason
In order to prevent any impact on the setting of the adjacent Listed Building, the
character of the development and in the interests of the amenities of the occupiers
of adjoining properties.
12
The boundary treatment detailed on drawing numbers 2324-007 and 2324-008A
shall be completed in accordance with the approved details prior to the occupation
of the first dwelling, the timber sections shall be painted dark green (BS14C39)
unless otherwise agreed in writing with the Local Planning Authority and shall
thereafter be retained.
Reason
In the interests of the visual amenity of the area and in accordance with Core
Strategy Policy CS28.
13
The dwellings hereby approved shall not commence construction until details of the
Conservation style rooflights have been submitted to and approved in writing by the
Local Planning Authority. The rooflights shall be implemented in accordance with
the approved details and shall be fitted flush with the roofslope.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity,
setting of the adjacent Listed Building and in accordance with Core Strategy Policy
CS28.
14
No work or storage on the site shall commence until all the trees/shrubs to be
retained have been protected by the erection of a strong durable 2 metre high
barrier fence in accordance with BS 5837: Trees in Relation to Design, Demolition
and Construction and positioned in accordance with the submitted tree protection
plan from Weddle Landscape Design Job No 595 Number HSK02 dated Oct 2015.
The protective fencing shall be properly maintained and shall not be removed
without the written approval of the Local Planning Authority until the development is
completed. There shall be no alterations in ground levels, fires, use of plant,
storage, mixing or stockpiling of materials within the fenced areas.
Reason
In the interests of the visual amenities of the area and in accordance policies CS28 ‘Sustainable Design’ and CS21 ‘Landscapes’ of Rotherham’s adopted Core Strategy.
15
Before the development is brought into use, a Landscape scheme, showing location
and types of landscape treatment, shall be submitted for approval by the Local
Planning Authority. The Landscape scheme should be prepared in accordance with
RMBC Landscape Design Guide (April 2014) and shall be implemented in the next
available planting season and maintained to ensure healthy establishment. Any
plants dying, removed or destroyed within five years of planting shall be replaced
the following planting season.
Reason
In the interests of the visual amenities of the area and in accordance with policies CS28 ‘Sustainable Design’ and CS21 ‘Landscapes’ of Rotherham’s adopted Core Strategy.
16
The scheme shall incorporate a small barrier in front of the Church Hall’s boiler room entrance, thereby ensuring the safe opening and function of the access.
Reason
In the interests of the amenities and safety of the occupiers of adjoining properties.
Informatives
01
The Development Management Procedure Order 2015 requires that planning
authorities provide written reasons in the decision notice for imposing planning
conditions that require particular matters to be approved before development can
start. Conditions numbered 02 and 03 of this permission require matters to be
approved before development works begin; however, in this instance the conditions
are justified because:
1. In the interests of the expedient determination of the application it was considered
to be appropriate to reserve certain matters of detail for approval by planning
condition rather than unnecessarily extending the application determination process
to allow these matters of detail to be addressed pre-determination.
2. The details required under condition numbers 02 and 03 are fundamental to the
acceptability of the development and the nature of the further information required to
satisfy these conditions is such that it would be inappropriate to allow the
development to proceed until the necessary approvals have been secured.
02
Nature conservation protection under UK and EU legislation is irrespective of the
planning system and the applicant should therefore ensure that any activity
undertaken, regardless of the need for any planning consent, complies with the
appropriate wildlife legislation. If any protected species are found on the site then
work should halt immediately and an appropriately qualified ecologist should be
consulted. For definitive information primary legislative sources should be
consulted.
03
The granting of this permission does not override any restriction/requirement set out
in any deeds or covenants relating to the site or any right of way that may exist over
the site. These are separate matters that need to be resolved accordingly before
development can take place.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application
discussions to consider the development before the submission of the planning
application. The application was submitted on the basis of these discussions, or
was amended to accord with them. It was considered to be in accordance with the
principles of the National Planning Policy Framework.
|