Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2026/1108
Site Address: The Piggery Little Wood Lane Thorpe Salvin Worksop 9999
Description: Erection of a farmworkers dwelling house and garage
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 24 November 2026
Decision Date: 24 November 2026
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 10 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 10 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ General 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans Proposed Elevation and Floor Plans, received 07/08/2026 Location Plan, received 02/09/2026 Design and Access Statement, received 02/09/2026 Ecological Statement, received 02/09/2026 Contamination Screening Assessment, received 02/09/2026 Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form. Reason In order to ensure a satisfactory appearance in the interests of visual amenity. 04 The occupation of the dwelling shall be limited to a person solely or mainly employed in the operation of the agricultural enterprise known as The Piggery, or to a widow, widower, surviving civil partner or dependant of such a person, together with any resident dependants. Reason Permission for the dwelling has been granted solely on the basis of an essential agricultural need and occupancy must remain linked to that need. 05 Notwithstanding the provisions of Schedule 2, Part 1, Classes A, AA, B, C, D, E ofthe Town and Country Planning (General Permitted Development) Order 2015 (orany Order revoking, re-enacting or amending that Order with or withoutmodification) there shall be no extensions to the dwelling hereby permitted. Reason To prevent future extensions in the green belt Highways 06 Before the development is brought into use, that part of the site to be used byvehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface withwater collected and taken to a separately constructed water retention / dischargesystem within the site. All to the satisfaction of the Local Planning Authority and shall thereafter bemaintained in a working condition. Reason In the interests of highway safety and sustainable drainage. 07 Prior to the dwelling being brought into use, details of an electric vehicle charging points shall be submitted to and approved inwriting by the local planning authority. The approved electric vehicle charging pointshall be implemented and made available for use prior to the occupation of thedevelopment hereby permitted. The arrangements shall be retained as suchthereafter. Reason To promote sustainable transport options Landscapes 08 Before the development is brought into use, a Landscape scheme along with finalboundary treatment, showing location and types of landscape and boundarytreatment, shall be submitted for approval by the Local Planning Authority. TheLandscape scheme should be prepared in accordance with RMBC LandscapeDesign Guide (April 2014) and shall be implemented in the next available plantingseason and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the followingplanting season. Reason To ensure the tree works are carried out in a manner which will maintain the health and appearance of the trees in the interests of the visual amenities of the area and in accordance with the Local Plan. Drainage 09 The development hereby granted shall not be occupied until details of the foul,surface water and land drainage systems and all related works necessary to drainthe site have been submitted to and approved by the Local Planning Authority.These works shall be carried out concurrently with the development and thedrainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development. Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan 10 No development shall commence until details of the proposed means of disposal of surface water from the development have been submitted to and approved in writing by the Local Planning Authority. The submitted details shall include: 1. Results of infiltration testing undertaken in accordance with BRE Digest 365 (or equivalent approved methodology); 2. Calculations demonstrating that the proposed drainage system can accommodate the 1 in 100 year rainfall event plus an appropriate allowance for climate change; 3. Details of the proposed surface water drainage layout, including attenuation and discharge arrangements where required; 4. Arrangements for the future maintenance and management of the drainage system for the lifetime of the development. The approved scheme shall be implemented in full prior to first occupation of the dwelling and thereafter retained and maintained in accordance with the approved details. Reason To ensure satisfactory drainage of the site, to prevent an increased risk of flooding on and off site, and to accord with Policy SP47 of the Rotherham Local Plan and the National Planning Policy Framework. Contaminated Land 11 If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment. Reason To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and NPPF 12 If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment Reason To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and NPPF Biodiversity 13 Prior to the occupation of the dwelling a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog homes and holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented prior to the first dwelling being occupied and thereafter retained and maintained for their designed purpose in accordance with the approved scheme. The scheme shall include, but not limited to, the following details: i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken; ii. Materials and construction to ensure long lifespan of the feature/measure; iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken. iv. When the features or measures will be installed within the construction, occupation, or phase of the development. Reason To ensure no net loss in biodiversity across the site. 14 Prior To Any Works Above Slab Level a Biodiversity Enhancement Strategy for protected and Priority species shall be submitted to and approved in writing by the local planning authority. The content of the Biodiversity Enhancement Strategy shall include the following: a) detailed designs or product descriptions; b) locations, orientations, and heights of proposed enhancement measures by appropriate maps and plans; c) persons responsible for implementing the enhancement measures; d) details of initial aftercare and long-term maintenance (where relevant). The works shall be implemented in accordance with the approved details prior to occupation and shall be retained in that manner thereafter. Reason: To enhance protected and Priority species & habitats and allow the LPA to discharge its duties under the NPPF (August 2026) and s40 of the NERC Act 2006 (Priority habitats & species). 15 A lighting design scheme for biodiversity shall be submitted to and approved in writing by the local planning authority. The scheme shall identify those features on site that are particularly sensitive for bats and that are likely to cause disturbance along important routes used for foraging; and show how and where external lighting will be installed (through the provision of appropriate lighting plans, drawings and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory. All external lighting shall be installed in accordance with the specifications and locations set out in the scheme and maintained thereafter in accordance with the scheme. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason: To allow the LPA to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 (as amended) and s40 of the NERC Act 2006 (Priority habitats & species) Environmental Health 16 No dwelling shall be occupied unless it has been constructed in accordance with a scheme submitted to, and approved by the Local Planning Authority, so as to ensure that the building envelope provides sound attenuation against external noise, with windows open to achieve the following noise levels. The scheme shall include a noise assessment carried out by a competent person (see footnote). • The 16-hour LAeq shall not exceed 35dB between 0700 and 2300 hours when measured inside any noise sensitive rooms in the development. • The 8-hour LAeq shall not exceed 30dB between 2300 and 0700 hours when measured inside any bedroom in the development. • The 15-minute LAF1 shall not exceed 45 dB between 2300 and 0700hrs when measured inside any bedroom in the development. • The 16-hour LAeq shall not exceed 55dB between 0700 and 2300 hours when measured outside at any residential amenity area in the development. If a ventilation scheme is required for rooms where windows need to be kept closed to prevent excessive noise levels, details of the scheme shall also be submitted to the Local Planning Authority for approval. The ventilation scheme shall provide the following information: • Identify which rooms of which plots require a ventilation system • The acoustic specification of the proposed ventilation system demonstrating that when operated it will not cause indoor noise target levels to be exceeded • The ventilation Scheme must demonstrate how habitable rooms of the proposed dwellings/apartments shall be provided with sufficient ventilation to help control thermal comfort and avoid over heating during hot weather without the need to open windows. All works which form part of the approved scheme shall be completed prior to occupation and retained thereafter. Competent Person – Footnote All noise assessments shall be carried out by a competent person. Developers may wish to contact the Association of Noise Consultants http://www.association-of-noise consultants.co.uk (020 8253 4518) or the Institute of Acoustics http://www.ioa.org.uk(0300 999 9675) for a list of members. Reason: To safeguard the amenities of the occupiers of nearby properties. 17 Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided. Reason: To safeguard the amenities of the occupiers of nearby properties. 18 All machinery and vehicles employed on the site shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in British Standard 5228 Code of Practice; 'Noise Control on Construction and Open Sites', and Minerals Planning Guidance Note 11 (1993) 'The Control of Noise at Surface Mineral Workings'. Reason: To safeguard the amenities of the occupiers of nearby properties. 19 At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. Reason: To safeguard the amenities of the occupiers of nearby properties. 20 Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. Reason: To safeguard the amenities of the occupiers of nearby properties. Informatives 01 Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84. 02 Developments should have floor levels set higher than the recorded flood level or a minimum of 300mm above proposed ground level due to surface water flooding. 03 Surface water drainage plans should include the following: • Rainwater pipes, gullies and drainage channels including cover levels. • Inspection chambers, manholes and silt traps including cover and invert levels. • Pipe sizes, pipe materials, gradients and flow directions. • Soakaways, including size and material. • Typical inspection chamber / soakaway / silt trap and SW attenuation details. • Site ground levels and finished floor levels. 04 Surface Water Discharge From Brownfield Site: There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased. A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off rate. 05 On Site Surface Water Management: The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land. The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated. Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway. Guidance on flood pathways can be found in BS EN 752. 06 If the development is proposing to make a new highway drainage connection to an existing highway drainage system, detailed CCTV surveys and modelling of the existing highway drainage system will be required to determine the capability to accept additional flow. Discharge will be limited to greenfield run-off rates. 07 The works should be undertaken outside of the bird nesting season (March-August inclusive). Should this not be possible then a suitably qualified ecologist should undertake a nesting bird check no more than 48 hours prior to the start of works. Should active nests be found, works should cease until the nests are no longer active and the chicks have fledged and the ecologist has deemed the area to be free of nesting birds. 08 If a protected species (such as any bat, small mammal, or any nesting bird) is discovered using a feature on site that would be affected by the development or related works all activity which might affect the species at the locality should cease. You should then seek the advice of a suitably qualified and experienced ecologist and consider the need for a licence from Natural England prior to commencing works. This action is necessary to avoid possible prosecution and ensure compliance with the Wildlife & Countryside Act 1981 (as amended), the Conservation of Habitats and Species Regulations 2017 (as amended), the Protection of Badgers Act 1992 and the Wild Mammals Act 1996. This advice note should be passed on to any persons or contractors carrying out the development/works. POSITIVE AND PROACTIVE STATEMENT Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen