| Conditions / Reason for Refusal: |
General
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans
Proposed Front and Rear Elevations 3B, received 30/07/2026
Proposed First Floor Plan 2B, received 30/07/2026
Proposed Drain Plan, received 30/07/2026
Proposed Site Plan, received 30/07/2026
Design and Access Statement, received 30/07/2026
AMENDED Proposed Landscape Parking, received 10/09/2026
AMENDED Proposed Ground Floor Plan 1B, received 10/09/2026
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
04
Notwithstanding the provisions of Schedule 2, Part 1, Classes A, AA, B, C, D, E of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking, re-enacting or amending that Order with or without modification) there shall be no extensions to the dwelling hereby permitted.
Reason
To prevent future extensions harming the amenity of neighbouring residents.
Highways
05
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or
b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site.
All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition.
Reason
In the interests of highway safety and sustainable drainage.
06
Details of an electric vehicle charging points shall be submitted to and approved in writing by the local planning authority. The approved electric vehicle charging point shall be implemented and made available for use prior to the occupation of the development hereby permitted. The arrangements shall be retained as such thereafter.
Reason
To promote sustainable transport options
Landscapes
07
Before the development is brought into use, a Landscape scheme along with final boundary treatment, showing location and types of landscape and boundary treatment, shall be submitted for approval by the Local Planning Authority. The Landscape scheme should be prepared in accordance with RMBC Landscape Design Guide (April 2014) and shall be implemented in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season.
Reason
To ensure the tree works are carried out in a manner which will maintain the health
and appearance of the trees in the interests of the visual amenities of the area and in accordance with the Local Plan.
Drainage
08
The development hereby granted shall not be occupied until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
Reason
To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan
09
No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority.
Reason
To ensure that the site is properly drained and in order to prevent overloading, surface water is not discharged to the public sewer network
Contaminated Land
10
If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements
for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the
environment.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and NPPF
11
If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and NPPF
Biodiversity
12
Prior to the occupation of the dwelling a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog homes and holes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented prior to the first dwelling being occupied and thereafter retained and maintained for their designed purpose in accordance with the approved scheme. The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure;
iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken.
iv. When the features or measures will be installed within the construction, occupation, or phase of the development.
Reason
To ensure no net loss in biodiversity across the site.
13
Prior To Any Works Above Slab Level a Biodiversity Enhancement Strategy for protected and Priority species shall be submitted to and approved in writing by the local planning authority. The content of the Biodiversity Enhancement Strategy shall include the following:
a) detailed designs or product descriptions;
b) locations, orientations, and heights of proposed enhancement measures by appropriate maps and plans;
c) persons responsible for implementing the enhancement measures; d) details of initial aftercare and long-term maintenance (where relevant). The works shall be implemented in accordance with the approved details prior to occupation and shall be retained in that manner thereafter.
Reason:
To enhance protected and Priority species & habitats and allow the LPA to discharge its duties under the NPPF (August 2026) and s40 of the NERC Act 2006 (Priority habitats & species).
Environmental Health
14
No dwelling shall be occupied unless it has been constructed in accordance with a scheme submitted to, and approved by the Local Planning Authority, so as to ensure that the building envelope provides sound attenuation against external noise, with windows open to achieve the following noise levels. The scheme shall include a noise assessment carried out by a competent person (see footnote).
• The 16-hour LAeq shall not exceed 35dB between 0700 and 2300 hours when measured inside any noise sensitive rooms in the development.
• The 8-hour LAeq shall not exceed 30dB between 2300 and 0700 hours when measured inside any bedroom in the development.
• The 15-minute LAF1 shall not exceed 45 dB between 2300 and 0700hrs when measured inside any bedroom in the development.
• The 16-hour LAeq shall not exceed 55dB between 0700 and 2300 hours when measured outside at any residential amenity area in the development. If a ventilation scheme is required for rooms where windows need to be kept closed to prevent excessive noise levels, details of the scheme shall also be submitted to the Local Planning Authority for approval. The ventilation scheme shall provide the following information:
• Identify which rooms of which plots require a ventilation system
• The acoustic specification of the proposed ventilation system demonstrating that when operated it will not cause indoor noise target levels to be exceeded
• The ventilation Scheme must demonstrate how habitable rooms of the proposed dwellings/apartments shall be provided with sufficient ventilation to help control thermal comfort and avoid over heating during hot weather without the need to open windows.
All works which form part of the approved scheme shall be completed prior to occupation and retained thereafter.
Competent Person – Footnote All noise assessments shall be carried out by a competent person. Developers may wish to contact the Association of Noise Consultants http://www.association-of-noise consultants.co.uk (020 8253 4518) or the Institute of Acoustics http://www.ioa.org.uk (0300 999 9675) for a list of members.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with RMBC Policy SP52 and Parts 12 & 15 of the NPPF.
15
Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Planning Authority shall be notified at the earliest opportunity of the occurrence of any such emergency, and a schedule of essential work shall be provided.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with RMBC Policy SP52 and Part 15 of the NPPF.
16
All machinery and vehicles employed on the site shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in British Standard 5228 Code of Practice; 'Noise Control on Construction and Open Sites', and Minerals Planning Guidance Note 11 (1993) 'The Control of Noise at Surface Mineral Workings'.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with RMBC Policy SP52 and Part 15 of the NPPF.
17
At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with RMBC Policy SP52 and Part 15 of the NPPF.
18
Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with RMBC Policy SP52 and Part 15 of the NPPF.
Informatives
Drainage
01
Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84.
02
Developments should have floor levels set higher than the recorded flood level or a
minimum of 300mm above proposed ground level due to surface water flooding.
03
Surface water drainage plans should include the following:
• Rainwater pipes, gullies and drainage channels including cover levels.
• Inspection chambers, manholes and silt traps including cover and invert levels.
• Pipe sizes, pipe materials, gradients and flow directions.
• Soakaways, including size and material.
• Typical inspection chamber / soakaway / silt trap and SW attenuation details.
• Site ground levels and finished floor levels.
04
Surface Water Discharge From Brownfield Site:
There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased.
A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off
rate.
05
On Site Surface Water Management:
The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land.
The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas
etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated.
Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway.
Guidance on flood pathways can be found in BS EN 752.
06
If the development is proposing to make a new highway drainage connection to an existing highway drainage system, detailed CCTV surveys and modelling of the existing highway drainage system will be required to determine the capability to accept additional flow. Discharge will be limited to greenfield run-off rates.
Biodiversity
07
The works should be undertaken outside of the bird nesting season (March-August inclusive). Should this not be possible then a suitably qualified ecologist should undertake a nesting bird check no more than 48 hours prior to the start of works. Should active nests be found, works should cease until the nests are no longer active and the chicks have fledged and the ecologist has deemed the area to be free of nesting birds.
08
If a protected species (such as any bat, small mammal, or any nesting bird) is discovered using a feature on site that would be affected by the development or related works all activity which might affect the species at the locality should cease. You should then seek the advice of a suitably qualified and experienced ecologist and consider the need for a licence from Natural England prior to commencing works. This action is necessary to avoid possible prosecution and ensure compliance with the Wildlife & Countryside Act 1981 (as amended), the Conservation of Habitats and Species Regulations 2017 (as amended), the Protection of Badgers Act 1992 and the Wild Mammals Act 1996. This advice note
should be passed on to any persons or contractors carrying out the development/works.
POSITIVE AND PROACTIVE STATEMENT
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
|