| Conditions / Reason for Refusal: |
01
This permission shall be valid for 5 years only (until 04 September 2031) and at the end of that period (unless further permission be granted by the Local Planning Authority prior to the end of that period) the building shall be wholly removed and the site restored in a manner to be agreed with the Local Planning Authority.
Reason
So as not to prejudice the long term development proposals for the area.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans
• Location Plan 135857 -TOR- XX-XX-DR-A-P-004
• Proposed Site Plan 135857 -TOR- XX-XX-DR-A-P-001
• Proposed Elevations 135857 -TOR- XX-XX-DR-A-P-006
• Proposed Floor Plan 135857 -TOR- XX-XX-DR-A-P-007
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/planning statement. The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
04
Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound shall be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound shall be at least equivalent to the capacity of the largest tank, vessel or the combined capacity of interconnected tanks or vessels plus 10%. All filling points, associated pipework, vents, gauges and sight glasses must be located within the bund or have separate secondary containment. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework shall be located above ground and protected from accidental damage. All filling points and tank/vessels overflow pipe outlets shall be detailed to discharge downwards into the bund.
Reason
To prevent pollution of the water environment in accordance with SP59 of the Development Plan
POSITIVE AND PROACTIVE STATEMENT
Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.
|