| Description: |
Non-material amendment to Application RB2025/0498 to include amendments to drainage strategy noted in condition 16 ( on site surface water attenuation which is to remain private and not offered for adoption, a vortex flow control chamber, a maximum restricted discharge of 2.0 litres per second; and connection to the existing combined sewer adjacent to the site |