Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2026/1020
Site Address: Holmefield Common Lane Laughton Common 9999
Description: Conversion of 2 No. barns to form 2 No. new dwellings with new access from highway
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 27 November 2026
Decision Date: 27 November 2026
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: General 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) (Drawing Numbers 5593-001/003/004/005/006/008/009)(received 16/07/2026). (Drawing Numbers 5593-002/012)(received 24/08/2026) (Drawing Numbers 5593-010 Rev B/ 011 Rev B)(received 27/11/2026). Reason To define the permission and for the avoidance of doubt. Highways 03 Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition. Ecology 04 All mitigation measures and/or works shall be carried out in accordance with the details contained in the Preliminary Ecological Appraisal by (Turnstone Ecology, July 2026) already submitted with the planning application and agreed in principle with the local planning authority prior to determination. Reason: To conserve and enhance protected and Priority species and allow the LPA to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 as amended, and s40 of the NERC Act 2006. 05 Prior to the commencement of works above ground level, a Biodiversity Enhancement Strategy for protected and Priority species shall be submitted to and approved in writing by the local planning authority. The content of the Biodiversity Enhancement Strategy shall include the following: a) Purpose and conservation objectives for the proposed enhancement measures; b) detailed designs or product descriptions to achieve stated objectives; c) locations, orientations, and heights of proposed enhancement measures by appropriate maps and plans; d) persons responsible for implementing the enhancement measures; e) details of initial aftercare and long-term maintenance (where relevant). The works shall be implemented in accordance with the approved details prior to occupation and shall be retained in that manner thereafter. Reason: To enhance protected and Priority species & habitats and allow the LPA to discharge its duties under the NPPF (August 2026) and s40 of the NERC Act 2006 (Priority habitats & species). 06 No development above ground level should commence until a lighting design scheme for biodiversity has been submitted to and approved in writing by the local planning authority. The scheme shall identify those features on site that are particularly sensitive for bats and that are likely to cause disturbance along important routes used for foraging; and show how and where external lighting will be installed (through the provision of appropriate lighting plans, drawings and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory. All external lighting shall be installed in accordance with the specifications and locations set out in the scheme and maintained thereafter in accordance with the scheme. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason: To allow the LPA to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 (as amended) and s40 of the NERC Act 2006 (Priority habitats & species). Materials 07 The development shall proceed in accordance with the external materials specified on Drawing Numbers 5593-010 Rev B & 5593-011 Rev B (received 27/11/2026). Reason To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with Local Plan Policy CS28. Boundary Treatment 08 Prior to the occupation of the dwellings hereby approved, details of a plan indicating the positions, design, materials and type of boundary treatment to be erected, shall have been submitted to and approved in writing with the Local Planning Authority. The boundary treatment shall be completed before the occupation of the dwellings. Reason In the interests of neighbouring amenity. Informative 01 Informative – Demolition and Construction Phase It is recommended that the following advice is followed to prevent a nuisance/ loss of amenity to local residential areas. Please note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in an unlimited fine upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to the below recommendations and to the steps that may be required to prevent a noise nuisance from being created. i. Except in case of emergency, operations should not take place on site other than between the hours of 08:00 - 18:00 Monday to Friday and between 09:00 - 13:00 on Saturdays. There should be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Local Planning Authority should be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided. ii. Heavy goods vehicles should only enter or leave the site between the hours of 08:00 - 18:00 on weekdays and 09:00 - 13:00 Saturdays and no such movements should take place on or off the site on Sundays or Public Holidays (this excludes the movement of private vehicles for personal transport). iii. Best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Local Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption. iv. Effective steps should be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer. v. Positive and Proactive Statement The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was further amended during the application process. It was considered to be in accordance with the principles of the National Planning Policy Framework.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen