| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
(Drawing numbers, 2026/086/00/01/02/03)(received 03/09/2026)
Reason
To define the permission and for the avoidance of doubt.
(Drawing Numbers 25-154-10-01/02/03/04/05/06/0709/10/11)(received 05/06/2026)
Reason
To define the permission and for the avoidance of doubt.
03
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety.
04
Before the development is brought into use the car parking area shown on the submitted plan shall be provided, marked out and thereafter maintained for car parking.
Reason
To ensure the provision of satisfactory garage/parking space and avoid the necessity for the parking of vehicles on the highway in the interests of road safety.
05
Before the proposed development is brought into use, a Travel Plan shall have been submitted to and approved by the Local Planning Authority. The plan shall include clear and unambiguous objectives, modal split targets together with a time bound programme of implementation, monitoring and regular review and improvement. The Local Planning Authority shall be informed of and give prior approval in writing to any subsequent improvements or modifications to the Travel Plan following submission of progress performance reports as time tabled in the programme of implementation.
Reason
In order to promote sustainable transport choices.
Positive and Proactive Statement
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|