| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below):
Drawing no. (20)01 P2 received 4 August 2026.
Reason
To define the permission and for the avoidance of doubt.
03
No noise generating fixed plant including mechanical ventilation, air conditioning / refrigeration compressor units or extraction plant shall be installed on the modular unit until full and precise details have been submitted to and approved in writing by the Local Planning Authority. The details shall include a BS4142:2014+A1:2019 noise assessment and 1/3 octave frequency analysis with appropriate corrections for acoustic features and shall detail any mitigation measures, physical or operational to achieve a maximum cumulative plant Noise Rating Level of no more than 3dB(A) below the prevailing background levels, outside the boundary of the nearest noise sensitive property.
Competent Person – Footnote the Association All noise assessments should be carried out by a competent person. Developers may wish to contact of Noise Consultants http://www.association-of-noise consultants.co.uk/ (020 8253 4518) or the Institute of Acoustics http://www.ioa.org.uk (0300 999 9675) for a list of members.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with RMBC Policy SP52 and parts 12 & 15 of the NPPF.
INFORMATIVE
01
This development is not subject to the Statutory Biodiversity Gain Plan condition
because of the declaration on the application form that the development was exempt
(because the impact on habitat is de-minimis).
Positive and Proactive Statement
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
|