| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans
Location Plan at scale 1:1250
Block Plan at scale 1:250
JBA.4501.401.A – Proposed Ground Floor Plan
JBA.4501.402.A – Proposed First Floor Plan
JBA.4501.403 – Proposed Second Floor Plan
JBA.4501.404.A – Proposed Elevations
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
04
Prior to the first apartment / flat being occupied, a scheme shall be submitted to and approved in writing by the Local Planning Authority detailing how the use of sustainable/public transport will be encouraged. The agreed details shall be implemented in accordance with a timescale to be agreed by the Local Planning Authority. This may take the form of a leaflet provided to future occupiers, that includes details of local schools, shops, public transport facilities etc.
Reason
In order to promote sustainable transport choices.
05
All gates shall be hung so as not to encroach into the highway when open or being opened.
Reason
In the interests of road safety.
06
The development shall be carried out in accordance with the acoustic mitigation measures detailed within the Noise Impact Assessment by NoiseAir, dated 1st May 2026 (Ref: P96B5-NA1-V1), and the Noise Impact Assessment Addendum by NoiseAir, dated 4th September 2026 (Ref: P9685-NA2-V2). The required mitigation measures shall include the façade insulation, glazing, ventilation and building construction specifications identified within the Noise Impact Assessments, including the upgraded façade treatments to the High Street elevation. All noise mitigation measures shall be implemented prior to first occupation of the residential units and thereafter retained and maintained.
Reason
To safeguard the amenities of the occupiers of the proposed development.
POSITIVE AND PROACTIVE STATEMENT
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|