| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans
Location Plan at scale 1:1250
Block Plan at scale 1:250
JBA.4501.301.A – Proposed Ground Floor Plan
JBA.4501.302.A – Proposed First Floor Plan
JBA.4501.303A – Proposed Second Floor Plan
JBA.4501.304 – Proposed Third Floor Plan
JBA.4501.305.A – Proposed Elevations
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing no. JBA.4501.305.A. The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
04
Prior to the first apartment / flat being occupied, a scheme shall be submitted to and approved in writing by the Local Planning Authority detailing how the use of sustainable/public transport will be encouraged. The agreed details shall be implemented in accordance with a timescale to be agreed by the Local Planning Authority. This may take the form of a leaflet provided to future occupiers, that includes details of local schools, shops, public transport facilities etc.
Reason
In order to promote sustainable transport choices.
05
All gates shall be hung so as not to encroach into the highway when open or being opened.
Reason
In the interests of road safety.
06
The development shall be carried out in accordance with the acoustic mitigation measures detailed within the Noise Impact Assessment by NoiseAir, dated 1st May 2026 (Ref: P96B5-NA1-V1), and the Noise Impact Assessment Addendum by NoiseAir, dated 4th September 2026 (Ref: P9685-NA2-V2). The required mitigation measures shall include the façade insulation, glazing, ventilation and building construction specifications identified within the Noise Impact Assessments, including the upgraded façade treatments to the High Street elevation. All noise mitigation measures shall be implemented prior to first occupation of the residential units and thereafter retained and maintained.
Reason
To safeguard the amenities of the occupiers of the proposed development.
07
All enhancement measures shall be carried out in accordance with the details contained in the Biodiversity Management and Enhancement Plan (Estrada Ecology, March 2026) already submitted with the planning application and agreed in principle with the local planning authority prior to determination.
Reason
To conserve and enhance protected and Priority species and allow the LPA to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 as amended, and s40 of the NERC Act 2006.
08
The retail unit at ground floor as shown on drawing number JBA.4501.301.A shall be used for Class E(a) purposes only and for no other purpose (including any other purpose in Class E of the Schedule to the Town and Country Planning (Use Classes) Order, 1987, (or any Order revoking and re-enacting that Order with or without modification).
Reason
The premises are not considered suitable for general use within the Class quoted due to its location within the defined town centre.
Informative(s)
01
You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist, they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway.
Please follow the following good practice when carrying out the construction works:
• Except in case of emergency, no operations shall take place on site other than between the hours of 0800 to 1800 hours Monday to Friday and between 0900 to 1300 hours on Saturdays. There shall be no working on Sundays or Public Holidays.
• All machinery and vehicles employed on the site shall be fitted with effective silencers of a type appropriate to their specification and at all times the noise emitted by vehicles, plant, machinery or otherwise arising from on-site activities, shall be minimised in accordance with the guidance provided in British Standard 5228 Code of Practice; 'Noise Control on Construction and Open Sites', and Minerals Planning Guidance Note 11 (1993) 'The Control of Noise at Surface Mineral Workings'.
• At all times during the carrying out of operations authorised or required under this permission, best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption.
• Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
02
SY Police Designing Out Crime Officer recommends the development is built to Secured by Design standards. www.securedbydesign.com
Lighting
Stairwells to be open and well lit, in line with BS 5489.
The entrances into the building should be well lit and offer as much natural surveillance from the street as possible.
Security of Development
The communal access doors should be to LPS 1175 SR 2 or better.
All individual apartment doors should be to standard Pas 24:2022.
All ground floor and accessible windows should be to ‘Secured by Design’ standards
Pas 24:2022 found at www.securedbydesign.com.
The main entrance doors should not be recessed.
The external courtyard must be secure, for the use of residents only.
03
If the developer/property management company intends to make their own arrangements for weekly waste and recycling collections through a private waste contractor, and the containers are not being provided or serviced by RMBC, then RMBC Waste Management would not undertake collections from the property.
The responsibility for ensuring sufficient waste and recycling capacity, appropriate collection frequencies, and the management of any excess or overflowing waste would therefore sit with the developer/property management company and their chosen waste contractor.
POSITIVE AND PROACTIVE STATEMENT
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|