| Conditions / Reason for Refusal: |
General
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below)
(Drawing numbers
Location Plan 24124 - 0101 - R01
Site Plan revised 24124 - 0301 – R11
Sections 24124 - 0303 - R02
Revised Elevations and Floor Plans 24124 - 0302 - R07
Received 20.10.25, 11.02.26, 10.03.26
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
03
No above ground development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples.
Reason
To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with Local Plan Policies and the NPPF.
Obscure glazing
04
The first floor windows facing the southern elevation to flat 04 (secondary kitchen, study and bathroom) shall be obscure glazed and fitted with glass to a minimum industry standard of Level 3 obscured glazing and be non-openable, unless the part(s) of the window(s) which can be opened are more than 1.7 metres above the floor of the room in which the window is installed. The window(s) shall be permanently retained in that condition thereafter.
Reason
In the interests of the amenities of the occupiers of adjoining properties.
Boundary Treatment
05
Prior to occupation of the dwellings a plan indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved in writing by the Local Planning Authority.
Reason In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28.
Landscaping
06
Before the development is brought into use, a Landscape scheme, showing location and types of landscape treatment, shall be submitted for approval by the Local Planning Authority. The Landscape scheme should be prepared in accordance with RMBC Landscape Design Guide (April 2014) and shall be implemented in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season.
Reason
To ensure the tree works are carried out in a manner which will maintain the health and appearance of the trees in the interests of the visual amenities of the area and in accordance with the Local Plan.
Highways
07
The access shown on the approved plan (Ref Site Plan revised 24124 - 0301 – R11 with lockable removable bollards) shall only be used by emergency vehicles and maintenance vehicles and shall not be used as a vehicular access for normal residential or delivery traffic.
Reason
The proposal has been considered on the basis of a car free development.
08
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity
Yorkshire Water/RMBC Drainage
09
The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed.
Reason
In the interest of satisfactory and sustainable drainage.
10
No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority.
Reason
To ensure that the site is properly drained and in order to prevent overloading, surface water is not discharged to the public sewer network.
Land Contamination
11
Prior to any ground works commencing, a Phase 2 Intrusive Site Investigation shall be undertaken to assess the geotechnical and geo-environmental constraints at the site complete with ground gas monitoring. A detailed scope of works including the methodology for investigation shall be submitted to and approved in writing by the Local Authority prior to any site investigation works commencing. The site investigation shall thereafter be undertaken in accordance with the approved details. The investigation and subsequent risk assessment must be undertaken by competent persons, and a written report of the findings must be produced and will be subject to approval in writing by this Local Planning Authority. The above should be conducted in accordance with the new guidance document ‘Land Contamination Risk Management’ (June 2025) and predecessor guidance ‘Model Procedures for the Management of Land Contamination, CLR 11 (Environment Agency, 2004) and BS10175:2011+A2 2017 (BSI, 2017)
Reason
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
12
Subject to the findings of condition 11 above and prior to above ground works commencing, a Remediation Method Statement shall be provided for the approval of this Local Authority prior to any remediation/ground improvement works commencing on site. The works shall be of such a nature as to render harmless any possible identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. The approved Remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The Local Authority must be given two weeks written notification of commencement of the remediation scheme works.
Reason
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
13
If subsoils / topsoils are required to be imported to site for garden/soft landscaping areas, then these soils will need to be tested at a rate and frequency to be agreed with the Local Planning Authority to ensure they are free from contamination. The results of testing will need to be presented in a Validation Report.
Reason
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
14
In the event that during development works unexpected significant contamination is encountered at any stage of the process, the Local Planning Authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Planning Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment.
Reason
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
15
Following completion of any remedial/ground preparation works a Validation Report should be forwarded to the Local Planning Authority for review and comment. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all validation data has been approved by the Local Planning Authority.
Reason
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Coal Authority
16
No development shall commence until;
a) a scheme of intrusive site investigations has been carried out on site to establish the risks posed to the development by past coal mining activity, including the recorded mine entry and;
b) any remediation works and/or mitigation measures to address land instability arising from coal mining legacy, as may be necessary, have been implemented on site in full in order to ensure that the site is made safe and stable for the development proposed.
The intrusive site investigations and remedial works shall be carried out in accordance with authoritative UK guidance.
Reason
The undertaking of intrusive site investigations, prior to the commencement of development, is considered to be necessary to ensure that adequate information pertaining to ground conditions and coal mining legacy is available to enable appropriate remedial and mitigatory measures to be identified and carried out before building works commence on site. This is in order to ensure the safety and stability
of the development, in accordance with paragraphs 187, 196 and 197 of the National Planning Policy Framework.
17
Prior to the occupation of the development, or it being taken into beneficial use, a signed statement or declaration prepared by a suitably competent person confirming that the site is, or has been made, safe and stable for the approved development shall be submitted to the Local Planning Authority for approval in writing. This document shall confirm the methods and findings of the intrusive site investigations and the completion of any remedial works and/or mitigation necessary to address the risks posed by past coal mining activity.
Reason
The undertaking of intrusive site investigations, prior to the commencement of development, is considered to be necessary to ensure that adequate information pertaining to ground conditions and coal mining legacy is available to enable appropriate remedial and mitigatory measures to be identified and carried out before building works commence on site. This is in order to ensure the safety and stability of the development, in accordance with paragraphs 187, 196 and 197 of the National Planning Policy Framework.
Ecology
18
Before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog homes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be
undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure
iii. A drawing(s) showing the location and where appropriate the elevation of the
features or measures to be installed or undertaken.
iv. When the features or measures will be installed within the construction,
occupation, or phase of the development.
For each of the first 5 years of the Plans, a progress report shall be sent to the Local Planning Authority reporting on progress of the annual work programme and confirmation of required Actions for the next 12 month period.
The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme
Reason
To ensure no net loss in biodiversity across the site.
Biodiversity Net Gain
19
No development shall commence on site until:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The details shall be implemented in accordance with the timescales set out in the approved Biodiversity Gain Plan.
For guidance on the contents of the Biodiversity Gain Plan that must be submitted
and agreed by the Council prior to the commencement of the consented
development please see the link: Submit a biodiversity gain plan - GOV.UK
(www.gov.uk)
Reason
The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act
1990 is that planning permission granted for the development of land in England is
deemed to have been granted subject to the condition (the biodiversity gain
condition), to ensure Biodiversity Net Gain.
20
No development shall commence until a Biodiversity Enhancement & Management Plan (BEMPs) has been submitted to and approved in writing by the Local Planning Authority. The Plans shall provide a:
i) Description and evaluation of features to be managed and enhanced; including
a) Description of new landscape planting incorporating native plant species
b) The location and number of bird nest boxes should be integrated into the new residential properties.
ii) Extent and location/area of proposed enhancement works on appropriate scale maps and plans;
iii) Aims and Objectives of management;
iv) Appropriate Management Actions for achieving Aims and Objectives;
v) An annual work programme (to cover an initial 5 year period);
For each of the first 5 years of the Plans, a progress report shall be sent to the Local Planning Authority reporting on progress of the annual work programme and confirmation of required Actions for the next 12 month period.
The Plans shall be reviewed and updated every 5 years to ensure their aims and objectives are being met. The approved Plans will be implemented in accordance with the approved details.
The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
Reason
The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act
1990 is that planning permission granted for the development of land in England is
deemed to have been granted subject to the condition (the biodiversity gain
condition), to ensure Biodiversity Net Gain.
Informatives
01
The development should be designed and built to Secured by Design standards. www.securedbydesign.com
02
You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway.
Ecology - general
03
Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted.
Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged.
In the absence of mitigation, where vegetation removal is scheduled during March– August (inclusive), there is potential for active bird nests to be destroyed during Site vegetation clearance works.
As such, any vegetation removal should ideally be programmed to be undertaken outside of bird breeding season, i.e. between September and February (inclusive). If it is not possible to schedule clearance works for these months, a nesting bird check by a suitably qualified Ecologist will be required no more than two days prior to vegetation clearance, to identify the presence of active bird nests.
An active nest would require an exclusion zone to be established and adhered to until chicks have fledged and/or the nest is no longer in use (to be monitored and confirmed by an Ecologist).
POSITIVE AND PROACTIVE STATEMENT
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme in respect of the indicative layout so that it was in accordance with the principles of the National Planning Policy Framework.
|