| Conditions / Reason for Refusal: |
The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 10, 11 and 28 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because:
i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination.
ii. The details required under condition numbers 10, 11 and 28 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.
General
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below)
(Drawing numbers
Location Plan 24 5750 02 revision A
Site Plan Layout 24 5750 01 revision H
S106 Plan 24 5750 08 Rev D
Public Open Space areas 24 5750 106 Revision O
Swept Path drawings ITY200240-GA-005 Rev G
Swept Path drawings ITY200240-GA-006 Rev F
Swept Path drawings ITY200240-GA-011
Swept Path drawings ITY200240-GA-012
Site Sections 24 5750 06 revision A
Site Sections 24 5750 07 revision A
Streetscenes 24 5750 05 revision A
Tree Protection Plan Barns Associates BA24697
House types
24 5750 2000 Rev 0 Beaford Plans and elevations
24 5750 2001 Rev 0 Beaford/Aynesdale Plans and elevations
24 5750 2002 Rev 0 Aynesdale/Beaford Plans and elevations
24 5750 2003 Rev 0 Eynesford Plans and elevations
24 5750 2004 Rev 0 Eynsford/Aynesdale Plans and elevations
24 5750 2005 Rev 0 Aynesdale/Eynsford Plans and elevations
24 5750 2008 Rev 0 Tetford Plans and elevations
24 5750 2009 Rev 0 Tetford Plans and elevations
24 5750 2010 Rev 0 Carrdale Plans and elevations
24 5750 2011 Rev 0 Carrdale Plans and elevations
24 5750 2012 Rev 0 Harrton Plans and elevations
24 5750 2013 Rev 0 Bittesford Plans and elevations
24 5750 2014 Rev 0 Bittesford Plans and elevations
24 5750 2015 Rev 0 Plumdale Plans and elevations
24 5750 2016 Rev 0 Plumdale Plans and elevations
24 5750 2017 Rev 0 Tetford Plans and elevations
24 5750 2018 Rev 0 Tetford Plans and elevations
24 5750 2019 Rev 0 Tetford Plans and elevations
24 5750 2020 Rev 0 Bittesford Plans and elevations
24 5750 2021 Rev 0 Bittesford, Plumdale Plans and elevations
24 5750 2022 Rev 0 Plumdale, Bittesford Plans and elevations
Received 07.04.25, 12.09.25, 11.10.25, 12.12.25, 07.01.26, 23.01.26 and 03.02.26
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
03
No above ground development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples.
Reason
To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with Local Plan Policies and the NPPF.
04
Prior to occupation of the each dwelling the approved boundary treatment for that dwelling (ref Boundary Treatment Plan 24 5750 03 Rev D received 26.01.26) shall be erected and thereafter retained for the duration of the development.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28.
Highways
05
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity
06
Before the development is commenced road sections, constructional and drainage
details shall be submitted to and approved by the Local Planning Authority.
Reason
In the interests of road safety.
07
Before the electrical system is installed a scheme detailing the dedicated facilities that will be provided for charging electric vehicles and other ultra-low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall meet at least the following minimum standard for numbers and power output:
• One Standard Electric Vehicle Charging Point providing a continuous supply of at least 16A (3.5kW) for each dwelling.
Buildings and parking spaces that are to be provided with charging points shall not be brought into use until the charging points are installed and operational. Charging points installed shall be retained thereafter.
Reason
In the interest of supporting and encouraging low emission vehicles, in the interest of air quality enhancement, to comply with the aims and objectives of the National Planning Policy Framework.
08
Prior to the first dwelling being occupied a Travel Pack shall be produced in the
form of an introduction pack to the area with information on buses, trains, cycle and
walking routes, local facilities such as schools, doctor’s surgeries and other local
facilities (shops, parks etc.) and submitted to and approved by the Local Planning
Authority. The approved Travel Pack shall be provided for each new resident on first
occupation of any dwelling.
Reason
In order to encourage sustainable modes of transport.
Ecology
09
Before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog homes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be
undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure
iii. A drawing(s) showing the location and where appropriate the elevation of the
features or measures to be installed or undertaken.
iv. When the features or measures will be installed within the construction,
occupation, or phase of the development.
For each of the first 5 years of the Plans, a progress report shall be sent to the Local Planning Authority reporting on progress of the annual work programme and confirmation of required Actions for the next 12 month period.
The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme
Reason
To improve wildlife habitat across the site.
10
No development shall commence on site until:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The details shall be implemented in accordance with the timescales set out in the approved Biodiversity Gain Plan.
For guidance on the contents of the Biodiversity Gain Plan that must be submitted
and agreed by the Council prior to the commencement of the consented development please see the link: Submit a biodiversity gain plan -GOV.UK (www.gov.uk)
Reason
The effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition (the biodiversity gain condition), to ensure Biodiversity Net Gain.
11
The development shall not commence until a Habitat Management and Monitoring Plan (the HMMP), prepared in accordance with the approved Biodiversity Gain Plan has been submitted to, and approved in writing by, the local planning authority and including:
a) a non-technical summary;
b) the roles and responsibilities of the people or organisation(s) delivering the HMMP;
c) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan;
d) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and
e) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority.
Notice in writing shall be given to the Council when the HMMP works have started.
Reason
To ensure no net loss in biodiversity across the site.
12
No dwelling hereby approved shall be occupied until a timetable for the completion of the habitat creation and enhancement works set out in the approved Habitat Management and Monitoring Plan (the HMMP) has been submitted to and approved in writing by the Local Planning Authority. In accordance with the agreed timetable, a completion report, evidencing the completed habitat enhancements must be submitted to, and approved in writing by the Local Planning Authority.
The created and / or enhanced habitat specified in the approved HMMP shall be managed and maintained in accordance with the approved HMMP.
Monitoring reports shall be submitted to local planning authority in writing in accordance with the methodology and frequency specified in the approved HMMP.
Reason
To ensure the development delivers a biodiversity net gain on site in accordance with Schedule 7A of the Town and Country Planning Act 1990.
13
Before above ground works commence details of external lighting shall be submitted to and approved in writing by the Local Planning Authority. The details shall clearly demonstrate that lighting will not cause excessive light pollution or disturb or prevent bats or other species using key corridors, foraging habitat features or accessing roost sites. The details shall include, but not limited to, the following:
a) A drawing showing sensitive areas and/or dark corridor safeguarding areas;
b) Technical description, design or specification of external lighting to be installed
including shields, cowls or blinds where appropriate;
c) A description of the luminosity of lights and their light colour;
d) A drawing(s) showing the location and where appropriate the elevation and height
of the light fixings;
e) Methods to control lighting control (e.g. timer operation, passive infrared sensor
(PIR));
f) Lighting contour plans both horizontal and vertical where appropriate and taking
into account hard landscaping, etc.
All external/internal lighting shall be installed in accordance with the specifications and locations set out in the approved details. These shall be maintained thereafter in
accordance with these details. Under no circumstances shall any other external
lighting be installed
Reason
In order to protect surrounding habitats and wildlife from excessive lightspill and pollution.
14
No removal of hedgerows, trees, shrubs, brambles, ivy, other climbing plants or works to or demolition of buildings or structures that may be used by breeding birds shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation should be submitted to the local planning authority.
Reason
To minimise any biodiversity loss across the site.
Trees
15
No work or storage on the site shall commence until all the trees/shrubs to be retained have been protected by the erection of a strong durable 2 metre high barrier fence in accordance with BS 5837:2012 Trees in Relation to Design, Demolition and Construction – Recommendations. This shall be positioned in accordance with details to be submitted to and approved by the Local Planning Authority. The protective fencing shall be properly maintained and shall not be removed without the written approval of the Local Planning Authority until the development is completed. There shall be no alterations in ground levels, fires, use of plant, storage, mixing or stockpiling of materials within the fenced areas.
Reason
To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change.
Landscape
16
Prior to any above ground development taking place a detailed landscape scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The landscape scheme shall be prepared to a minimum scale of 1:200 and shall clearly identify through supplementary drawings where necessary:
• The extent of existing planting, including those trees or areas of vegetation that are to be retained, and those that it is proposed to remove.
• The extent of any changes to existing ground levels, where these are proposed.
• Any constraints in the form of existing or proposed site services, or visibility requirements.
• Areas of structural and ornamental planting that are to be carried out.
• A planting plan and schedule detailing the proposed species, siting, quality and size specification, and planting distances.
• A written specification for ground preparation and soft landscape works.
• The programme for implementation.
• Written details of the responsibility for maintenance and a schedule of operations for the lifetime of the development, including replacement planting, that will be carried out for a period of 5 years after completion of the planting scheme.
The scheme shall thereafter be implemented in accordance with the approved landscape scheme and in accordance with the appropriate standards and codes of practice within a timescale agreed, in writing, by the Local Planning Authority.
Reason
To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity.
17
Any plants or trees which within a period of 5 years from completion of planting die, are removed or damaged, or that fail to thrive shall be replaced within the next planting season. Assessment of requirements for replacement planting shall be carried out on an annual basis in September of each year and any defective work or materials discovered shall be rectified before 31st December of that year.
Reason
To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity.
Coal Authority/SYMAS
18
No development shall commence until;
a) a scheme of intrusive site investigations has been carried out on site to establish the risks posed to the development by past coal mining activity, including the recorded mine entry and;
b) any remediation works and/or mitigation measures to address land instability arising from coal mining legacy, as may be necessary, have been implemented on site in full in order to ensure that the site is made safe and stable for the development proposed.
The intrusive site investigations and remedial works shall be carried out in accordance with authoritative UK guidance.
Reason
The undertaking of intrusive site investigations, prior to the commencement of development, is considered to be necessary to ensure that adequate information pertaining to ground conditions and coal mining legacy is available to enable appropriate remedial and mitigatory measures to be identified and carried out before building works commence on site. This is in order to ensure the safety and stability
of the development, in accordance with the National Planning Policy Framework.
19
Prior to the occupation of the development, or it being taken into beneficial use, a signed statement or declaration prepared by a suitably competent person confirming that the site is, or has been made, safe and stable for the approved development shall be submitted to the Local Planning Authority for approval in writing. This document shall confirm the methods and findings of the intrusive site investigations and the completion of any remedial works and/or mitigation necessary to address the risks posed by past coal mining activity.
Reason
The undertaking of intrusive site investigations, prior to the commencement of development, is considered to be necessary to ensure that adequate information pertaining to ground conditions and coal mining legacy is available to enable appropriate remedial and mitigatory measures to be identified and carried out before building works commence on site. This is in order to ensure the safety and stability
of the development, in accordance with the National Planning Policy Framework.
RMBC Drainage
20
No above ground development shall take place until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
Reason
To ensure that the site is connected to suitable drainage systems and to ensure
that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan.
Yorkshire Water
21
The development shall be carried out in accordance with the details shown on the
submitted plan, 'Flood Risk Assessment and Drainage Strategy' 25022-FRADS01 prepared by Coast, dated 26/03/2025’, unless otherwise agreed in writing with the Local Planning Authority.
Reason
In the interest of satisfactory and sustainable drainage.
Pollution Control
22
Prior to above ground works commencing, a Phase II Intrusive Site Investigation shall be undertaken to assess the geotechnical and geo-environmental constraints at the site complete with ground gas monitoring. A detailed scope of works including the methodology for investigation and the proposed gas monitoring frequency shall be submitted to and approved in writing by the Local Authority prior to any site investigation works commencing. The site investigation shall thereafter be undertaken in accordance with the approved details. The investigation and subsequent risk assessment must be undertaken by competent persons and a written report of the findings must be produced and will be subject to approval in writing by this Local Planning Authority. The above should be conducted in accordance with the new guidance document ‘Land Contamination Risk Management’ (October 2020) and predecessor guidance ‘Model Procedures for the Management of Land Contamination, CLR 11 (Environment Agency, 2004) and BS10175:2011+A2 2017 (BSI, 2017).
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and National Planning Policy Framework.
23
Subject to the findings of the Phase II (condition 22 above) and prior to above ground works commencing, a Remediation Method Statement shall be provided for the approval of this Local Authority prior to any remediation/ground improvement works commencing on site. The works shall be of such a nature as to render harmless any possible identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. The approved Remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The Local Authority must be given two weeks written notification of commencement of the remediation scheme works.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and the National Planning Policy Framework.
24
Prior to the commencement of construction, and if required based on site investigation findings, a Detailed Design Report for gas mitigation measures shall be submitted to and approved in writing by the Local Authority. The report shall demonstrate how the proposed mitigation measures have been incorporated into the overall infrastructure design. All approved mitigation measures shall be fully implemented prior to occupation of the site.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and the National Planning Policy Framework.
25
If virgin material, subsoil/topsoil materials are required to be imported to site for remedial works, then these materials will need to be tested at a rate and frequency to be agreed with the Local Authority to ensure they are free from contamination and will not present a risk to future users of the site and the environment.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and the National Planning Policy Framework.
26
If during development works unexpected significant contamination is encountered, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and the National Planning Policy Framework.
27
Following completion of any required remedial/ground preparation works a Verification Report should be forwarded to the Local Authority for review and comment. The Verification Report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the Verification Report together with the necessary documentation detailing what waste materials have been removed from the site. No dwellings shall be occupied until such time as all verification data has been approved by the Local Authority.
Reason
To ensure the safe occupation of the site in accordance with Policy SP54 of the Rotherham Local Plan and the National Planning Policy Framework.
Construction Environmental Management Plan (CEMP)
28
Prior to the development commencing a Construction Environmental Management Plan (CEMP) shall be submitted to and agreed in writing with the Local Planning Authority. The plan shall describe in detail the actions that will be taken to minimise adverse impacts on occupiers of nearby properties and shall provide information in respect of the following matters:
• Program and Phasing Details
- Site layout
- Expected duration of demolition and construction work phases
• Site Management
- Contact details of site manager
- Complaints procedure
- Roles and responsibilities
- Details of public liaison meetings (including details of the frequency of meetings and of those to be invited to the meetings).
• Routes for Construction Traffic
- Routes to be used to and from the site along the road network within the Rotherham Borough.
- Proposed access/egress points onto the site.
- One way systems
- Haul routes (on-site and delivery)
NOTE: Where temporary access is required during the construction phase, these should benefit from separate planning permission if not approved under the host permission. Appropriate S278/S184 Agreements (as appropriate) must be gained from the Highways Authority before any works commence on site.
• Site Access, Storage and Movement of Materials
- Delivery access point details
- Location details of storage areas
- Delivery times of materials and plant
- Location of on site parking and turning provision
• Dust, Debris and Mud
- Screening and hoarding
- Preventative measures
- Details of soil and its movement and temporary storage during construction
- Dust suppression measures - General and machinery
- Wheel wash facilities (including details of source of water)
- Road sweeping facilities
- Covering of dusty stockpiles
- Vehicles carrying dusty loads
- Dust monitoring
- Boundary checks
- Monitoring of weather including wind speed and direction, dry conditions etc
NOTE: Regards shall be had to the guidance detailed in Institute of Air Quality Management- Guidance of the assessment of dust from demolition and construction 2014. In addition, measures shall be taken to minimise mud on nearby public roads, such that road sweepers are only required on these roads in exceptional/emergency circumstances.
• Noise and Vibration Control
- Silencing of vehicles, plant and machinery.
- Mitigation measures for noisy operations
- Operational hours (to include site opening hours, operational hours of workers, and delivery of goods hours).
- One way systems
- Vehicle reverse alarms (white noise reversing alarms should be used as opposed to bleeper alarms, particularly where close to residential properties)
- Leaflet drops to noise sensitive premises
NOTE: Regards shall be had to the guidance detailed in BS5228 2009: ‘Noise and Vibration Control on Construction Sites’.
• Artificial Lighting
- Hours of operation of the lighting
- Location and specification of all of the luminaires
- Level of maintained average horizontal illuminance for the areas that needs to be illuminated
- Predicted vertical illuminance that will be caused by the proposed lighting when measured at windows of any properties in the vicinity.
- Measures that will be taken to minimise or eliminate glare and stray light arising from the use of the lighting that is caused beyond the boundary of the site.
NOTE: Regards shall be had to the guidance detailed in the Institute of Lighting Professionals - Guidance Note 01/21 – Reduction of Obtrusive Light.
• Waste Management
- Waste storage
- Waste collection
- Recycling
- Waste removal
Constructional techniques in respect of the Overhead Power Lines of the adjacent electricity cable.
The agreed CEMP shall be adhered to throughout the construction of the development.
Reason
To safeguard the amenities of the occupiers of nearby properties in accordance with part 15 of the NPPF and Supplementary Planning Document No.2 Air Quality & Emissions.
Communication
29
Prior to first occupation of a dwelling on this site, information relating to the
availability of infrastructure to enable the provision of gigabit capable full fibre
broadband should be submitted and approved by the LPA. If the necessary
infrastructure is available to enable provision, details of measures to facilitate the
provision of gigabit-capable full fibre broadband for the development hereby
approved, including a timescale for implementation, shall be submitted to and
approved in writing by the Local Planning Authority. The development shall be
carried out in accordance with the approved details.
Reason
In accordance with Local Plan Policy SP61 ‘Telecommunications’ and
the NPPF.
Local Labour Agreement
30
Prior to the commencement of construction works above ground level, a Local
Labour Agreement relating to the construction phase of the development shall be
submitted to and approved in writing by the Local Planning Authority. The scope of
the Agreement shall be agreed in writing prior to submission of the formal document.
The development shall thereafter be carried out in accordance with the approved
Agreement.
Reason
To improve skills in all of Rotherham’s communities through the promotion of access
to training, education and local employment opportunities.
Hours of construction
31
Except in case of emergency, operations should not take place on site other than
between the hours of 08:00 - 18:00 Monday to Friday and between 09:00 - 13:00 on
Saturdays. There should be no working on Sundays or Public Holidays. At times
when operations are not permitted work shall be limited to maintenance and
servicing of plant or other work of an essential or emergency nature. The Local
Planning Authority should be notified at the earliest opportunity of the occurrence of
any such emergency and a schedule of essential work shall be provided.
Reason
In the interests of residential amenity of nearby properties.
Waste Management Plan
32
Prior to the development being first occupied a Waste Management Plan shall be
submitted to and approved in writing by the Local Planning Authority. The Plan will
need to include:
• information on the amount and type of waste that will be generated from the
site;
• measures to reduce, re-use and recycle waste within the development,
including the provision of on-site separation and treatment facilities (using fixed or
mobile plants where appropriate);
• an assessment of the potential to re-use or adapt existing buildings on the
site (if demolished it must explain why it is not possible to retain them);
• design and layouts that allow effective sorting and storing of recyclables and
recycling and composting of waste and facilitate waste collection operations during
the lifetime of the development;
• measures to minimise the use of raw materials and minimise pollution of any
waste;
• details on how residual waste will be disposed in an environmentally
responsible manner and transported during the construction process and beyond;
• construction and design measures that minimise the use of raw materials and
encourage the re-use of recycled or secondary resources (particularly building
materials) and also ensure maximum waste recovery once the development is
completed; and
• details on how the development will be monitored following its completion.
The agreed details shall be implemented and thereafter maintained.
Reason
To minimise the amount of waste used during the construction and lifetime of the
project and to encourage the re-use and recycling of waste materials on site.
Informatives
01
Ecology
Condition 09
• 72 bird brick integrated into the building on a northerly aspect/orientation
(north, north-east and north-west). Example specification includes the Schwegler Brick Box Type 24, Woodstone Sparrow Nest Box or an equivalent suitable for tits, sparrows or starlings. The boxes should be located between two to four metres high, ideally at the gable apex or at eaves. The brick can be installed flush with the outside wall and can be rendered or covered so that only the entrance hole is visible.
• 21 swift bricks integrated into the building on any elevation but ideally under
shadecasting eaves. They should be installed in groups of three, at a height above 5m and preferably with a 5m clearance between the host building and other buildings or obstructions. Swift bricks should be used unless these are not practical due to the nature of construction, in which case alternative designs of suitable swift boxes should be provided in their place. Example specification includes the Manthrope ‘GSWB’ Swift brick or the Vivara Pro Cambridge Brick Faced Swift Nest Box.
• 25 bat bricks should be integrated into buildings on a southerly aspect / orientation (south, south west, and south-east). Boxes should be located a minimum of 2 metres, but ideally 5-7 metres above ground, in a position near the eaves or gable apex. Placement should avoid windows, doors and wall climbing plants. Example specification includes Verona Build-In Woodstone Bat Box, Segovia Build-in WoodStone Bat Box and WoodStone Build-in Bat Tube.
• Hedgehog holes between any fencing, railings, wall and gates to ensure the
development is permeable to hedgehogs. These can be created by 13cmX13cm holes at ground level within fences or by leaving a sufficient gap beneath gates and/or leaving brick spaces at the base of brick walls. To ensure holes are kept open ‘Hedgehog Highway’ signage should be provided and secured above the holes.
Biodiversity Net Gain – condition 10
Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days).
Biodiversity Gain Plan
The biodiversity gain plan must include/accompanied by:
(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat;
(b) the pre-development biodiversity value of the onsite habitat;
(c) the post-development biodiversity value of the onsite habitat;
(d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development;
(e) any biodiversity credits purchased for the development;
(f) any information relating to irreplaceable habitat making up onsite habitat
(g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline.
(h) any additional information requirements stipulated by the secretary of state.
The effect of section 73D of the Town and Country Planning Act 1990
If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted.
Those circumstances are that the conditions subject to which the section 73 permission is granted:
1. do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and
2. in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
- Listed exemptions from Statutory BNG and transitional arrangements can be found at Biodiversity net gain: exempt developments - GOV.UK (www.gov.uk)
- The Statutory Biodiversity Gain Plan template can be found at https://www.gov.uk/government/publications/biodiversity-gain-plan
- Minimum legal requirements for the Biodiversity Gain plan can be found at https://www.legislation.gov.uk/ukpga/2021/30/schedule/14#:~:text=paragraph%2015).-,Biodiversity%20gain%20plan,-14
- Irreplaceable habitats for the purposed of Biodiversity Net Gain are defined by Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024. A full list of irreplaceable habitats can be found at https://www.legislation.gov.uk/uksi/2024/48/schedule/made
- Additional information required is outlined by Articles 37C(2) [Non Phased] 37C(4) [Phased] of The Town and Country Planning (Development Management Procedure) (England) Order 2015 and may be subject to the nature of your application https://www.legislation.gov.uk/uksi/2015/595#:~:text=Additional%20content%20of%20plan
- Where a Habitat Management and Monitoring Plan is required: https://publications.naturalengland.org.uk/publication/5813530037846016
Please note that Informative 1 relates to Biodiversity Net Gain, and notes that this permission is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The Informative adds that failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days).
Condition 13
Informative: Guidance regarding lighting issues can be found in the ‘Guidance Note 08/23: Bats and Artificial Lighting At Night’ Institute of Lighting Professionals, 2023.
Ecology - general
Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted.
Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged.
In the absence of mitigation, where vegetation removal is scheduled during March– August (inclusive), there is potential for active bird nests to be destroyed during Site vegetation clearance works.
As such, any vegetation removal should ideally be programmed to be undertaken outside of bird breeding season, i.e. between September and February (inclusive). If it is not possible to schedule clearance works for these months, a nesting bird check by a suitably qualified Ecologist will be required no more than two days prior to vegetation clearance, to identify the presence of active bird nests.
An active nest would require an exclusion zone to be established and adhered to until chicks have fledged and/or the nest is no longer in use (to be monitored and confirmed by an Ecologist).
National Grid
02
National Grid required a minimum of a 15m stand off from of towers to any buildings or structures and our access (including vehicular access) must not be restricted.
Yorkshire Water
03
1.) The submitted 'Flood Risk Assessment and Drainage Strategy' 25022-FRADS01 prepared by Coast, dated 26/03/2025 is acceptable. In summary, the report states that
a.) Foul water will discharge to public foul combined water sewer
b.) Sub-soil conditions do not support the use of soakaways
c.) Surface water will discharge watercourse, subject to approval by appropriate governing body.
2.) On the Statutory Sewer Map, there is a 375mm diameter public combined water sewer recorded to cross the site. It is essential that the presence of this infrastructure is taken into account in the design of the scheme.
a.) It may not be acceptable to raise or lower ground levels over the sewer and we will not accept any inspection chambers on the sewer to be built over.
b.) In this instance, a stand-off distance of 3 (three) metres is required at each side of the sewer centre-line and it may not be acceptable to raise or lower ground levels over the sewer, nor to restrict access to the manholes on the sewer.
c.) In this instance, it would appear that the public sewer is unlikely to be affected by
building-over proposals.
d.) There should be no new tree planting within 5 metres of the public sewer network
3.) If the developer is looking to have new sewers included in a sewer adoption agreement with Yorkshire Water (under Section 104 of the Water Industry Act 1991), he/she should contact our Developer Services Team (telephone 03451 208 482, email: technical.sewerage@yorkshirewater.co.uk) at the earliest opportunity. Sewers intended for adoption should be designed and constructed in accordance with the WRc publication 'Code for Adoption - a design and construction guide for developers' as supplemented by Yorkshire Water's requirements.
Electric Vehicle Charging Points – Footnote
04
• A Standard Electric Vehicle Charging Point is one which is capable of providing a
continuous supply of at least 16A (3.5kW) and up to 32A (7kW). The higher output is
more likely to be futureproof.
• For developments where some or all of the parking is likely to be used for shorter
stay parking (30mins to 4 hours) then Fast (7-23kW) or Rapid (43kW+) charging
points may be more appropriate. If Fast or Rapid charging points are proposed
together with restrictions on the times that vehicles are allowed to be parked at
these points then a lower number of charging points may be acceptable.
• The electrical supply of the final installation should allow the charging equipment to
operate at full rated capacity.
• The installation must comply with all applicable electrical requirements in force at
the time of installation.
Police ALO
05
South Yorkshire Police indicate that all rear boundaries should be at least 1.8m high
to prevent access into rear gardens. All doorsets allowing direct access into the
home and ground floor windows should be to the required standard for Secured by
Design.
Lighting
06
All external paths and car parking areas should be well lit with an LED lighting
scheme and to standard BS5489 with no dark areas.
Management plan
07
The planning permission is subject to a Legal Agreement (Obligation) under Section
106 of the Town and Country Planning Act 1990. The S106 Agreement is legally
binding and is registered as a Local Land Charge. It is normally enforceable against
the people entering into the agreement and any subsequent owner of the site.
As part of the S106 the applicant is required to submit a detailed management plan
for final approval by the local planning authority to demonstrate how the Public Open
Space areas within the site will be managed and maintained by the applicant or
management company in the long term.
POSITIVE AND PROACTIVE STATEMENT
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
|