Conditions / Reason for Refusal: |
General
01
The development hereby permitted shall be commenced before the expiration of three years from the date of the original permission (RB2021/0698) being (16/05/2025).
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
2274_LP, received 30 March 2021
20/2274/(02)102 P02, received 23 October 2024
20/2274/(02)103 P02, received 23 October 2024
20/2274/(02)101 rev C, received 23 October 2024
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form, design and access statement and shown on drawing nos. 20/2274/(02)102 P02 and 20/2274/(02)103 P02. The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity.
Highways
04
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
05
The EV Charging point details submitted and approved by application RB2023/0216 shall be provided before the associated dwelling is first occupied and shall thereafter be retained.
Reason
In the interests of sustainable development and air quality.
Trees
06
No objections (including initial site clearance) shall commence on site in connection with the development hereby approved until the protection of existing trees and hedgerows, detailed in the Arboricultural Method Statement, (Ref: 16626-ARB-02 Figure 5.1 Tree Protection Plan) submitted and approved by RB2023/0216 is provided.
All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained.
Reason
To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change.
07
The landscaping of the site shall be carried out in accordance with the details shown on drawing 16626-ARB-03, Figure 5.2 Tree Planting Proposals, dated May 2023, which was submitted and approved by RB2023/0216.
All tree planting must be carried out in full accordance with the approved scheme in the nearest planting season (1st October to 28th February inclusive). The quality of all approved tree planting should be carried out to the levels detailed in British Standard 8545, Trees: from nursery to independence in the landscape - Recommendations.
Any trees which die, are removed, uprooted, significantly damaged, become diseased or malformed within five years from the completion of planting, must be replaced during the nearest planting season (1st October to 31st March inclusive) with a tree/s of the same size, species and quality as previously approved.
Reason
To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change.
Land Contamination
08
In the event that during development works unexpected significant contamination is encountered at any stage of the process, the local planning authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. This is to ensure the development will be suitable for use and that identified contamination will not present significant risks to human health or the environment.
Reason
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Drainage
09
The development shall not be brought into use until the drainage details set out in drawings 47797-XXXX-DR-C-0100; 47797-XX-XX-DR-C-0101; 47797-XX-XX-DR-C-0102 and 47797- XX-XX-DR-C-0104, which were submitted and approved under RB2023/0216 have been implemented.
Reason
To ensure that the development can be properly drained in accordance with the Local plan and the NPPF.
Ecology
10
The development shall be carried out in accordance with the recommendations in Section 4 of the submitted and approved Preliminary Ecological Appraisal and as set out on drawing 20/2274/(02)101 rev C. The mitigation shall be implemented prior to the first dwelling being occupied and thereafter such approved measures shall be retained and maintained unless otherwise agreed with the Local Planning Authority.
Reason
In order not to disturb any bats or birds and to make adequate provision for species protected by the Wildlife & Countryside Act 1981.
Informative(s)
01
You should note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust which may arise during the construction phase. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in a fine of up to £20,000 upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to reducing general disturbance by restricting the hours that operations and deliveries take place, minimising dust and preventing mud, dust and other materials being deposited on the highway. This includes:
(i) Except in case of emergency, operations should not take place on site other than between the hours of 08:00 - 18:00 Monday to Friday and between 09:00 - 13:00 on Saturdays. There should be no working on Sundays or Public Holidays. At times when operations are not permitted work shall be limited to maintenance and servicing of plant or other work of an essential or emergency nature. The Local Planning Authority should be notified at the earliest opportunity of the occurrence of any such emergency and a schedule of essential work shall be provided.
(ii) Heavy goods vehicles should only enter or leave the site between the hours of 08:00 - 18:00 on weekdays and 09:00 - 13:00 Saturdays and no such movements should take place on or off the site on Sundays or Public Holidays (this excludes the movement of private vehicles for personal transport).
(iii) Best practicable means shall be employed to minimise dust. Such measures may include water bowsers, sprayers whether mobile or fixed, or similar equipment. At such times when due to site conditions the prevention of dust nuisance by these means is considered by the Local Planning Authority in consultations with the site operator to be impracticable, then movements of soils and overburden shall be temporarily curtailed until such times as the site/weather conditions improve such as to permit a resumption.
(iv) Effective steps should be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry, mud or any other material from the site, on the public highway shall be removed immediately by the developer.
(v) Effective steps shall be taken by the operator to prevent the deposition of mud, dust and other materials on the adjoining public highway caused by vehicles visiting and leaving the site. Any accidental deposition of dust, slurry mud or any other material from the site, on the public highway shall be removed immediately by the developer. Reason: In order to ensure that the development does not give rise to problems of mud/dust on the adjoining public highway in the interests of general highway safety/amenity.
02
Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted.
Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged.
03
The planning permission is subject to a Legal Agreement (Obligation) under Section 106 of the Town and Country Planning Act 1990. The S106 Agreement is legally binding and is registered as a Local Land Charge. It is normally enforceable against the people entering into the agreement and any subsequent owner of the site.
04
It is recommended that the development is designed and built to Secured by Design standards www.securedbydesign.com
POSITIVE AND PROACTIVE STATEMENT
Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.
|