Conditions / Reason for Refusal: |
Conditions
The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 11 and 13 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because:
i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination.
ii. The details required under condition numbers 11 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.
General
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below)
(Drawing numbers
Location Plan 23/022 001
Site Plan revised Layout 23/022 002 Rev E
Site Sections 23/022 002 Rev E
Swept Path P01 S2
Elevations and Floor Plans plots 1 and 2 23/022 003
Elevations and Floor Plans plots 3 and 4 23/022 004 Rev A
Received 11.10.24, 18.11.24, 24.01.25 and 28.01.25
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
03
No above ground development shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted or samples of the materials have been left on site, and the details/samples have been approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details/samples.
Reason
To ensure that appropriate materials are used in the construction of the development in the interests of visual amenity and in accordance with Local Plan Policies and the NPPF.
04
Prior to occupation of the first dwelling the approved boundary treatment (ref Boundary Layout Site Plan revised Layout 23/022 002 Rev D) shall be erected and thereafter retained for the duration of the development.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28.
Highways
05
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that each dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity
06
When the proposed access has been brought into use, the existing access marked on the submitted plan (ref revised Layout 23/022 002 Rev D) shall be permanently closed and the footway reinstated in accordance with details to be submitted to and approved by the Local Planning Authority.
Reason
In the interests of road safety.
07
Before the electrical system is installed a scheme detailing the dedicated facilities that will be provided for charging electric vehicles and other ultra-low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall meet at least the following minimum standard for numbers and power output:
• One Standard Electric Vehicle Charging Point providing a continuous supply of at least 16A (3.5kW) for each dwelling.
Buildings and parking spaces that are to be provided with charging points shall not be brought into use until the charging points are installed and operational. Charging points installed shall be retained thereafter.
Reason
In the interest of supporting and encouraging low emission vehicles, in the interest of air quality enhancement, to comply with the aims and objectives Chapters 2, 9 and 15 of the National Planning Policy Framework.
Drainage
08
No above ground development shall take place until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
Reason
To ensure that the site is connected to suitable drainage systems and to ensure
that full details thereof are approved by the Local Planning Authority before any works begin and in accordance with Policy CS25 of the Local Plan.
Ecology
09
Before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s), hedgehog homes and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme.
The scheme shall include, but not limited to, the following details:
i. Description, design or specification of the type of feature(s) or measure(s) to be
undertaken;
ii. Materials and construction to ensure long lifespan of the feature/measure
iii. A drawing(s) showing the location and where appropriate the elevation of the
features or measures to be installed or undertaken.
iv. When the features or measures will be installed within the construction,
occupation, or phase of the development.
For each of the first 5 years of the Plans, a progress report shall be sent to the Local Planning Authority reporting on progress of the annual work programme and confirmation of required Actions for the next 12 month period.
The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme
Reason
To improve wildlife habitat across the site.
10
No removal of hedgerows, trees or shrubs shall take place between 1st March and
31st August inclusive, unless a competent ecologist has undertaken a careful,
detailed check of vegetation for active birds’ nests immediately before the
vegetation is cleared and provided written confirmation that no birds will be
harmed and/or that there are appropriate measures in place to protect nesting bird
interest on site. Any such written confirmation should be submitted to the local
planning authority.
Reason
To minimise any biodiversity loss across the site.
Biodiversity net gain
11
The Biodiversity Gain Plan shall be prepared in accordance with the [submitted ecology report BNG Summary Report] dated [October 2024] and prepared by [Weddles].
Reason
To ensure that Biodiversity Net Gain 10% can be achieved.
Landscape
12
Before the development is brought into use, a Landscape scheme, showing location and types of landscape treatment, shall be submitted for approval by the Local Planning Authority. The Landscape scheme should be prepared in accordance with RMBC Landscape Design Guide (April 2014) and shall be implemented in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season.
Reason
To ensure the tree works are carried out in a manner which will maintain the health and appearance of the trees in the interests of the visual amenities of the area and in accordance with the Local Plan.
13
Prior to the commencement of development, a Construction Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Construction Management Plan shall include:
- details of the proposed access to the site for all vehicles associated with the development on the application site;
- traffic management measures during the construction work;
- the location of the site compound and staff parking;
- measures to deal with dust;
- measures to deal with mud in the highway;
- details of proposed hours of construction on/deliveries to the site;
and such further matters as the Local Planning Authority may consider necessary.
The approved measures shall be implemented throughout the construction period.
Reason
In the interests of highway safety and residential amenity.
Informatives
Ecology
Condition 09
• 1 bird integrated into the building on a northerly aspect/orientation
(north, north-east and north-west). Example specification includes the
Schwegler Brick Box Type 24, Woodstone Sparrow Nest Box or an
equivalent suitable for tits, sparrows or starlings. The boxes should be
located between two to four metres high, ideally at the gable apex or at
eaves. The box can be installed flush with the outside wall and can be
rendered or covered so that only the entrance hole is visible.
• 1 swift box integrated into the building on a northerly
aspect/orientation (north, north-east and north-west). Example specification
includes the Manthrope ‘GSWB’ Swift brick or the Vivara Pro Cambridge
Brick Faced Swift Nest Box. Alternatively, RSPB Swift Box may be more
suitable for the development. The box(es) should be located high within the
gable wall, ideally above 5m high, below the overhang of the verge
and barge board.
• 1 bat box should be integrated into buildings on a southerly aspect /
orientation(south, south west, and south-east). Boxes should be located a
minimum of 2 metres, but ideally 5-7 metres above ground, in a position
near the eaves or gable apex. Placement should avoid windows, doors and
wall climbing plants.
Biodiversity Net Gain – condition 11
Unless an exception or a transitional arrangement applies1, the effect of paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that planning permission granted for the development of land in England is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rotherham MBC. Failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days).
Biodiversity Gain Plan
The biodiversity gain plan must include/accompanied by:
(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat;
(b) the pre-development biodiversity value of the onsite habitat;
(c) the post-development biodiversity value of the onsite habitat;
(d) any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development;
(e) any biodiversity credits purchased for the development;
(f) any information relating to irreplaceable habitat making up onsite habitat
(g) information about steps taken or to be taken to minimise any adverse effect of the development on, and arrangements for compensation for any impact the development has on the biodiversity of, any irreplaceable habitat4 present within the onsite baseline.
(h) any additional information requirements stipulated by the secretary of state.
The effect of section 73D of the Town and Country Planning Act 1990
If planning permission is granted on an application made under section 73 of the Town and Country Planning Act 1990 (application to develop land without compliance with conditions previously attached) and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the section 73 planning permission is granted.
Those circumstances are that the conditions subject to which the section 73 permission is granted:
1. do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and
2. in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
- Listed exemptions from Statutory BNG and transitional arrangements can be found at Biodiversity net gain: exempt developments - GOV.UK (www.gov.uk)
- The Statutory Biodiversity Gain Plan template can be found at https://www.gov.uk/government/publications/biodiversity-gain-plan
- Minimum legal requirements for the Biodiversity Gain plan can be found at https://www.legislation.gov.uk/ukpga/2021/30/schedule/14#:~:text=paragraph%2015).-,Biodiversity%20gain%20plan,-14
- Irreplaceable habitats for the purposed of Biodiversity Net Gain are defined by Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024. A full list of irreplaceable habitats can be found at https://www.legislation.gov.uk/uksi/2024/48/schedule/made
- Additional information required is outlined by Articles 37C(2) [Non Phased] 37C(4) [Phased] of The Town and Country Planning (Development Management Procedure) (England) Order 2015 and may be subject to the nature of your application https://www.legislation.gov.uk/uksi/2015/595#:~:text=Additional%20content%20of%20plan
- Where a Habitat Management and Monitoring Plan is required: https://publications.naturalengland.org.uk/publication/5813530037846016
Please note that Informative 1 relates to Biodiversity Net Gain, and notes that this permission is deemed to have been granted subject to the condition “(the biodiversity gain condition”) that development may not begin unless:
(a) a Biodiversity Gain Plan has been submitted to the planning authority, and
(b) the planning authority has approved the plan.
The Informative adds that failure to submit a Biodiversity Gain Plan prior to the commencement of development will lead to formal enforcement action being considered, which could be in the form of a Temporary Stop Notice (that will require all development on site to stop, for a period of 56 days).
Ecology - general
Nature conservation protection under UK and EU legislation is irrespective of the planning system and the applicant should therefore ensure that any activity undertaken, regardless of the need for any planning consent, complies with the appropriate wildlife legislation. If any protected species are found on the site then work should halt immediately and an appropriately qualified ecologist should be consulted. For definitive information primary legislative sources should be consulted.
Furthermore, vegetation removal should be undertaken outside of the bird breeding season, March to September inclusive. If any clearance work is to be carried out within this period, a nest search by a suitably qualified ecologist should be undertaken immediately preceding the works. If any active nests are present, work which may cause destruction of nests or, disturbance to the resident birds must cease until the young have fledged.
In the absence of mitigation, where vegetation removal is scheduled during March– August (inclusive), there is potential for active bird nests to be destroyed during Site vegetation clearance works.
As such, any vegetation removal should ideally be programmed to be undertaken outside of bird breeding season, i.e. between September and February (inclusive). If it is not possible to schedule clearance works for these months, a nesting bird check by a suitably qualified Ecologist will be required no more than two days prior to vegetation clearance, to identify the presence of active bird nests.
An active nest would require an exclusion zone to be established and adhered to until chicks have fledged and/or the nest is no longer in use (to be monitored and confirmed by an Ecologist).
POSITIVE AND PROACTIVE STATEMENT
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme in respect of the indicative layout so that it was in accordance with the principles of the National Planning Policy Framework.
|