Rotherham Metropolitan Borough Council Council Online Planning - Decision Notice Summary

Planning Application Number: RB2024/0870
Site Address: Mosque Chapel Walk Rotherham Town Centre 9999
Description: Demolition of front and side extension, erection of 3 storey side extension, 2nd floor front and side extension and single storey rear extension including external alterations, minaret and dome on roof
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 13 November 2024
Decision Date: 13 November 2024
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Proposed to be Delegated
Conditions / Reason for Refusal: The Development Management Procedure Order 2015 requires that planning authorities provide written reasons in the decision notice for imposing planning conditions that require particular matters to be approved before development can start. Conditions numbered 04 of this permission require matters to be approved before development works begin; however, in this instance the conditions are justified because: i. In the interests of the expedient determination of the application it was considered to be appropriate to reserve certain matters of detail for approval by planning condition rather than unnecessarily extending the application determination process to allow these matters of detail to be addressed pre-determination. ii. The details required under condition numbers 04 are fundamental to the acceptability of the development and the nature of the further information required to satisfy these conditions is such that it would be inappropriate to allow the development to proceed until the necessary approvals have been secured.’ General 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans: A106 – Location Plan, received 13 November 2024 A100 – Proposed Ground Floor Plan, received 30 July 2024 A101 – Proposed First Floor Plan, received 30 July 2024 A102 – Proposed Second Floor and Roof Plan, received 30 July 2024 A103 – Side Elevations, received 30 July 2024 A104 – Rear Elevation, received 30 July 2024 A105 – Front Elevation, received 30 July 2024 Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form; Design and Access Statement and materials sample document. The development shall thereafter be carried out in accordance with these details. Reason In order to ensure a satisfactory appearance in the interests of visual amenity. Construction Management Plan 04 Prior to any works commencing on site a Construction Environment Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall describe in detail the actions that will be taken to minimise adverse impacts on occupiers of nearby properties by effectively controlling: • Noise & vibration arising from all construction and demolition related activities - Contractors and site staff are expected to use the best practical means to minimise noise on site. Regard shall be had to the guidance detailed in BS5228 2009: ‘Noise and Vibration Control on Construction Sites’. • Dust arising from all construction and demolition related activities - Contractors and site staff are expected to use the best practical means to minimise dust on site. Regard shall be had to the guidance detailed in Institute of Air Quality Management- Guidance of the assessment of dust from demolition and construction 2014. • Artificial lighting used in connection with all construction related activities and security of the construction site - Contractors and site staff are expected to use the best practical means to minimise light nuisance on site. Regard shall be had to the guidance detailed in the Institute of Lighting Professionals - Guidance Note 01/21 – Reduction of Obtrusive Light. The CEMP to be submitted shall be in report format and as a minimum is to include the following details as specified in the subheadings below: • Program and Phasing Details o Site layout o Operational hours o Expected duration of demolition and construction work phases • Site Management o Contact details of site manager for public liaison purposes o Complaints procedure - Roles and responsibilities • Routes for Construction Traffic o Routes to be used for access onto site and egress o One way systems o Haul routes (onsite and delivery) • Site Access, Storage and Movement of Materials o Delivery access point details o Location details of storage areas, including parking of vehicles and areas for loading / unloading of materials o Delivery times of materials and plant • Dust, Debris and Mud o Screening and hoarding o Preventative measures o Dust suppression measures o General and machinery o Wheel wash facilities o Road sweeping facilities o Covering of dusty stockpiles o Vehicles carrying dusty loads o Dust monitoring o Boundary checks o Monitoring of weather including wind speed and direction, dry conditions etc • Noise and Vibration Control o Silencing of vehicles, plant and machinery o Mitigation measures for noisy operations o Operational hours o One way systems o Vehicle reverse alarms o Leaflet drops to noise sensitive premises • Artificial Lighting o Hours of operation of the lighting o Location and specification of all of the luminaires o Level of maintained average horizontal illuminance for the areas that needs to be illuminated o Predicted vertical illuminance that will be caused by the proposed lighting when measured at windows of any properties in the vicinity o Measures that will be taken to minimise or eliminate glare and stray light arising from the use of the lighting that is caused beyond the boundary of the site • Waste Management o Waste storage o Waste collection o Recycling o Waste removal Reason To safeguard the amenities of the occupiers of nearby properties and promote sustainable development. Amenity 05 No noise generating plant including mechanical ventilation/air conditioning, refrigeration or extraction plant shall be installed in any part of the development until full and precise details have been submitted to and approved in writing by the Local Planning Authority. The details shall include a BS4142:2014 +A1:2019 noise assessment and 1/3 octave frequency analysis with appropriate corrections for acoustic features and shall detail any mitigation measures, physical or operational to achieve no more than 0dB(A) above the prevailing background levels, outside the boundary of the nearest noise sensitive property during the quietest measured period. A suitably competent person (see informative 03) must carry out the assessment. Reason To safeguard the amenities of the occupiers of nearby properties. 06 There shall be no call to prayer in the form or amplified music or voices projected from the building. Reason To safeguard the amenities of the occupiers of nearby properties. Drainage 07 The development hereby granted shall not be occupied until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development. Reason To ensure that the site is connected to suitable drainage systems and to ensure that full details thereof are approved by the Local Planning Authority before any works begin. Highways 08 The development shall not be commenced above ground level until details of the proposed alterations in the footway at Chapel Walk, have been submitted to and approved by the Local Planning Authority and the approved details shall be implemented before the development is brought into use. Reason In the interests of road safety. Ecology 09 Notwithstanding the submitted details, before above ground works commence a scheme for biodiversity enhancement, such as the incorporation of permanent bat roosting feature(s) and nesting opportunities for birds, shall be submitted to and agreed in writing with the Local Planning Authority. The approved details thereafter shall be implemented, retained and maintained for their designed purpose in accordance with the approved scheme. The scheme shall include, but not limited to, the following details: i. Description, design or specification of the type of feature(s) or measure(s) to be undertaken; ii. Materials and construction to ensure long lifespan of the feature/measure iii. A drawing(s) showing the location and where appropriate the elevation of the features or measures to be installed or undertaken. iv. When the features or measures will be installed within the construction, occupation, or phase of the development. Reason In the interests of biodiversity and ecology. Trees 10 No operations (including initial site clearance) shall commence on site in connection with the development hereby approved until the protection of existing trees and hedgerows as set out in the submitted Arboricultural Method Statement (ref: BALDS006-24, Revision A) have been installed on site. All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. Reason To ensure appropriate tree protection in the interests of protecting the visual amenity of the area, contributing to the quality and character of Rotherham’s environment, air quality and adapting to and mitigating climate change. Informative(s) 01 Please note that the use of the building within the blue line boundary which was approved by RB2017/0271 for a temporary period of 5 years as a temporary house of worship has lapsed. In order to continue to use this building on a temporary basis during the renovation / extension of the building related to this application, a further application will be required. 02 It is recommended that the following advice is followed to prevent a nuisance/ loss of amenity to local residential areas. Please note that the Council’s Neighbourhood Enforcement have a legal duty to investigate any complaints about noise or dust. If a statutory nuisance is found to exist they must serve an Abatement Notice under the Environmental Protection Act 1990. Failure to comply with the requirements of an Abatement Notice may result in an unlimited fine upon conviction in the Magistrates' Court. It is therefore recommended that you give serious consideration to the below recommendations and to the steps that may be required to prevent a noise nuisance from being created. 03 All noise assessments should be carried out by a competent person. Developers may wish to contact the Association of Noise Consultants http://www.association-of-noise-consultants.co.uk/ (020 8253 4518) or the Institute of Acoustics http://www.ioa.org.uk (0300 999 9675) for a list of members. 04 You will appreciate that these works will require an Agreement under S278 Highways Act, 1980 and involve the provision of pedestrian dropped kerbs and tactile paving. 05 Drainage • Records indicate that this area is in a Flood Zone 1. Please see Environment Agency indicative SW Flood Maps. • Flood resilience should be duly considered in the design of the new building/s or renovation. Guidance may be found in BRE Digest 532 Parts 1 and 2, 2012 and BRE Good Building Guide 84. • Surface water drainage plans should include the following: o Rainwater pipes, gullies and drainage channels including cover levels. o Inspection chambers, manholes and silt traps including cover and invert levels. o Pipe sizes, pipe materials, gradients and flow directions. o Soakaways, including size and material. o Typical inspection chamber / soakaway / silt trap and SW attenuation details. o Site ground levels and finished floor levels. o • Surface Water Discharge From Brownfield Site: There should be no increase in surface water discharge from the site to existing sewers / watercourses. On site surface water attenuation will therefore be required if drained areas to existing sewers / watercourses are to be increased. A 30% net reduction to existing peak discharge (up to a 1/100 yr storm + 40% CC) will be required if the site is being re-developed. A full justification will be required where the development cannot achieve the 30% betterment on the existing run-off rate. • On Site Surface Water Management: The site is required to accommodate rainfall volumes up to 1 in 100 year return period (plus climate change) whilst ensuring no flooding to buildings or adjacent land. The applicant will need to provide details and calculations including any below ground storage, overflow paths (flood routes), surface detention and infiltration areas etc. to demonstrate how the 100 year + 40% CC rainfall volumes will be controlled and accommodated. Where cellular storage is proposed and is within areas where it may be susceptible to damage by excavation by other utility contractors, warning signage should be provided to inform of its presence. Cellular storage and infiltration systems should not be positioned within highway. Guidance on flood pathways can be found in BS EN 752. • If the development is proposing to make a new highway drainage connection to an existing highway drainage system, detailed CCTV surveys and modelling of the existing highway drainage system will be required to determine the capability to accept additional flow. Discharge will be limited to greenfield run-off rates. POSITIVE AND PROACTIVE STATEMENT Whilst the applicant did not enter into any pre application discussions with the Local Planning Authority, the proposals were in accordance with the principles of the National Planning Policy Framework and did not require any alterations or modification.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen