Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (Drawing no GC-OWR-01 and GC-OWR-03 received on 6th March 2023 and GC-OWR-04 Rev received on 2nd May 2023. A, 2023-06a and 2023-07a received on 10 March 2023.)
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those in the existing dwelling.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with policy
04
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that the dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
Positive and Proactive Statement
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
.Conditions
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (Drawing no GC-OWR-01 and GC-OWR-03 received on 6th March 2023 and GC-OWR-04 Rev received on 2nd May 2023. A, 2023-06a and 2023-07a received on 10 March 2023.)
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those in the existing dwelling.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with policy
04
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either a/ a permeable surface and associated water retention/collection drainage, or b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site. All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition
Reason
To ensure that surface water can adequately be drained and that mud and other extraneous material is not deposited on the public highway and that the dwelling can be reached conveniently from the footway in the interests of the adequate drainage of the site, road safety and residential amenity.
05
Prior to the substantial completion of the extension, details of a screen fence to the side of the raised patio shall be submitted to and approved in writing by the Local Planning Authority. The approved screen fence shall be installed prior to the completion and occupation of the extension and retained in perpetuity.
Reason
In the interest of the amenity of neighbouring properties.
Positive and Proactive Statement
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
|