| Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications as shown on the approved plans (as set out below)
(Drawing numbers location plan P1845-01, site/block plan 00110 Rev P04, landscaping plan 00100 Rev P05)(received 04.10.22, 07.03.23).
Reason
To define the permission and for the avoidance of doubt.
03
The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided in the submitted application form/shown on drawing nos. landscaping plan 00100 Rev P05. The development shall thereafter be carried out in accordance with these details.
Reason
In order to ensure a satisfactory appearance in the interests of visual amenity and in accordance with Core Strategy Policy CS28 Sustainable Design.
Highways
04
All gates shall be hung so as not to encroach into the highway when open or being opened.
Reason
In order to prevent obstruction to pedestrians.
05
Before the development is brought into use, that part of the site to be used by vehicles shall be constructed with either;
a/ a permeable surface and associated water retention/collection drainage, or;
b/ an impermeable surface with water collected and taken to a separately constructed water retention/discharge system within the site.
The area shall thereafter be maintained in a working condition.
Reason
To ensure that surface water can adequately be drained and to encourage drivers to make use of the parking spaces and to ensure that the use of the land for this purpose will not give rise to the deposit of mud and other extraneous material on the public highway in the interests of the adequate drainage of the site and road safety.
06
Prior to the commencement of above ground works on site, engineering details for the upgrade of the existing adopted footpath so as to accommodate vehicles crossing shall be submitted to and agreed in writing by the local planning authority. The agreed details shall be implemented before the extension of the graveyard is brought into use.
Reason
In the interests of road safety.
07
Before the development is brought into use, the approved Landscape scheme as indicated on Landscape schedule (Dwg No Planting schedule 00200 Rev P03, landscaping plan 00100 Rev P05, received 04.10.22, 07.03.23) shall be implemented in accordance with RMBC Landscape Design Guide (April 2014) in the next available planting season and maintained to ensure healthy establishment. Any plants dying, removed or destroyed within five years of planting shall be replaced the following planting season.
Reason
To ensure that there is a well laid out scheme of healthy trees and shrubs in the interests of amenity and in accordance with Local Plan Policy.
Informatives
Licences
01
The applicant is reminded to apply for any additional licences or permits required from the Environment Agency.
Wildlife and Ecology
02
No removal of hedgerows, trees or shrubs shall take place between 1st March and 31st August inclusive, unless a competent ecologist has undertaken a careful, detailed check of vegetation for active birds’ nests immediately before the vegetation is cleared and provided written confirmation that no birds will be harmed and/or that there are appropriate measures in place to protect nesting bird interest on site. Any such written confirmation shall be submitted to the local planning authority.
POSITIVE AND PROACTIVE STATEMENT
The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.
|