Conditions / Reason for Refusal: |
01
The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.
Reason
In order to comply with the requirements of the Town and Country Planning Act 1990.
02
The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below)
(Amended Plans CS/04665/1) (Received 09/11/2022
Reason
To define the permission and for the avoidance of doubt.
03
Before the development is brought into use, that part of the site to be used by vehicles shall be properly constructed with either
a/ a permeable surface and associated water retention/collection drainage, or
b/ an impermeable surface with water collected and taken to a separately constructed water retention / discharge system within the site.
All to the satisfaction of the Local Planning Authority and shall thereafter be maintained in a working condition.
Reason
In the interest of Highway Safety and to reduce surface water flows.
04
Before the development is brought into use the car parking area shown on the submitted plan shall be provided, marked out and thereafter maintained for car parking.
In the interest of highway safety.
05
The premises shall be used for B2, B8 or E(g) only and for no other purpose (including any other purpose in Class E of the Schedule to the Town and Country Planning (Use Classes) Order.
Reason
The premises are not considered suitable for general use within the Class E due to the sites out of centre location and the need for a sequential test evidence to be fully assessed
Positive and Proactive Statement
During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.
|