Planning Application Number: RB2021/2156
Site Address: 177C Doncaster Road Thrybergh 0177
Description: Erection of detached double garage
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 28 April 2022
Decision Date: 28 April 2022
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved location plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans, drawing ref: New Garage, Site/Block Plan & Elevations dated 11/03/22. Reason To define the permission and for the avoidance of doubt. 03 The materials to be used in the construction of the external surfaces of the development hereby permitted shall be in accordance with the details provided on the New Garage, Site/Block Plan & Elevations dated 11/03/22. The development shall thereafter be carried out in accordance with these details. Reason In order to ensure a satisfactory appearance in the interests of visual amenity amenity. 04 No operations (including initial site clearance) shall commence on site in connection with development hereby approved until a suitable scheme (Arboricultural Method Statement) for the protection of existing trees and hedgerows has been submitted and its installation on site has been approved in writing by the Local Planning Authority. All protection measures must fully detail each phase of the development process taking into account demolition/site clearance works, all construction works and hard and soft landscaping works. Details shall include the following: • Full survey of all trees on site and those within influencing distance on adjacent sites in accordance with BS5837*, with tree works proposals. All trees must be plotted on a scaled site plan**, clearly and accurately depicting trunk locations, root protection areas and canopy spreads. (Provided) • A plan** detailing all trees and hedgerows planned for retention and removal. • A schedule of tree works for all the retained trees specifying pruning and other remedial or preventative work, whether for physiological, hazard abatement, aesthetic or operational reasons. All tree works shall be carried out in accordance with BS 3998. • Soil assessments/survey • Timing and phasing of works • Site specific demolition and hard surface removal specifications • Site specific construction specifications (e.g. in connection with foundations, bridging, water features, surfacing) • Access arrangements and car parking • Level changes • Landscaping proposals • A Tree protection plan** in accordance with BS5837* detailing all methods of protection, including but not restricted to: locations of construction exclusion zones, root protection areas, fit for purpose fencing and ground protection, service routes, works access space, material/machinery/waste storage and permanent & temporary hard surfaces. • Soil remediation plans, where unauthorised access has damaged root protection areas in the construction exclusion zones. • Details of the Arboricultural supervision schedule. All tree protection methods detailed in the approved Arboricultural Method Statement shall not be moved or removed, temporarily or otherwise, until all works including external works have been completed and all equipment, machinery and surplus materials have been removed from the site, unless the prior approval of the Local Planning Authority has first been sought and obtained. *Using the most recent revision the of the Standard ** Plans must be of a minimum scale of 1:200 (unless otherwise agreed by the Local Planning Authority) Positive and Proactive Statement During the determination of the application, the Local Planning Authority worked with the applicant to consider what amendments were necessary to make the scheme acceptable. The applicant agreed to amend the scheme so that it was in accordance with the principles of the National Planning Policy Framework.

Click here to return to: Welcome Screen Search Screen Search Results Details Screen