Planning Application Number: RB2021/1745
Site Address: land off Highfield Spring Waverley 9999
Description: Enabling infrastructure comprising installation of pipe work for foul and surface water drainage
Officer Recommendation: GRANTED CONDITIONALLY
Officer Recommendation Date: 30 November 2021
Decision Date: 30 November 2021
Decision Type: GRANTED CONDITIONALLY
Temporary Expiry Date:
Decision Level/Committee: Delegated (Part 2A)
Conditions / Reason for Refusal: 01 The development hereby permitted shall be commenced before the expiration of three years from the date of this permission. Reason In order to comply with the requirements of the Town and Country Planning Act 1990. 02 The permission hereby granted shall relate to the area shown outlined in red on the approved site plan and the development shall only take place in accordance with the submitted details and specifications and as shown on the approved plans (as set out below) • Drainage Overview WHC1 – TTE – 00 – ZZ - DR – D – 0001 P02 • Proposed Drainage Plan WHC1 – TTE – 00 – ZZ - DR – D – 0100 – P03 • Strategy Technical Note (784-A042756-4) Reason To define the permission and for the avoidance of doubt and to ensure that the development can be properly drained in accordance with the Local plan and the NPPF. 03 If during development works unexpected significant contamination is encountered, the Local Planning Authority shall be notified in writing immediately. Any requirements for remedial works shall be submitted to and approved in writing by the Local Planning Authority. Works thereafter shall be carried out in accordance with an approved Method Statement. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. 04 If subsoil/topsoil is required to be imported to site for remedial works, then these soils will need to be tested at a rate and frequency to be agreed with the Local Planning Authority to ensure they are free from contamination. The results of which will need to be presented within a Validation Report. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. POSITIVE AND PROACTIVE STATEMENT The applicant and the Local Planning Authority engaged in pre application discussions to consider the development before the submission of the planning application. The application was submitted on the basis of these discussions, or was amended to accord with them. It was considered to be in accordance with the principles of the National Planning Policy Framework.